Public Service Enterprise Group (PEG) 10-K risk factor changes: FY2022 vs FY2021
The 2022-12-31 10-K against the 2021-12-31 one, compared heading by heading and sentence by sentence.
Item 1A102 rewritten72 added70 removed242 unchanged
All filing items1,951 rewritten807 added1,119 removed3,097 unchanged
Sentence counts leave out repeated page headers and footers. 185 of those lines differ and are listed apart under each item.
Summary
counted, not written
- Item 1A lists 27 risk factor headings: 1 new, 12 reworded and 14 unchanged since FY2021. 2 headings from FY2021 no longer appear.
- Sentence by sentence, 807 added, 1,119 removed, 1,951 rewritten and 3,097 unchanged across 17 items that differ.
- Not counted above: 185 repeated page header or footer lines also differ. They are listed apart under each item.
New Item 1A headings (1)
- A material shift away from natural gas toward increased electrification and a reduction in the use of natural gas as a result of economic decarbonization measures could adversely impact our business.
Removed Item 1A headings (2)
- Failure to complete, or delays in completing, our proposed investment in the Ocean Wind project could adversely impact our businesses and prospects.
- Operation of our generating stations are subject to market risks that are beyond our control.
Reworded Item 1A headings (12)
- Inability to successfully develop, obtain regulatory approval for, or construct T&D, and
[removed: solar and wind][added: other] generation projects could adversely impact our businesses. - We are subject to physical, financial and transition risks related to climate change, including potentially increased legislative and regulatory burdens and changing customer preferences, and we may be subject to lawsuits, all of which could impact our businesses and results of
[removed: operations.][added: operations, as well as our ability to implement our clean energy strategy.] - We may be adversely affected by asset and equipment failures, critical operating technology or business system failures, accidents, natural disasters, severe weather events, acts of war or
[removed: terrorism,][added: terrorism or other acts of violence,] sabotage,[removed: cyberattack,][added: physical attacks] or [added: security breaches, cyberattacks, or] other incidents, including pandemics such as the[removed: ongoing]coronavirus pandemic, that impact our ability to provide safe and reliable service to our customers and remain competitive and could result in substantial financial losses. - Cybersecurity attacks or intrusions or other disruptions to our
[removed: information technology,][added: IT,] operational or other systems could adversely impact our businesses. - Our financial condition and results of operations could be adversely affected by the
[removed: ongoing]coronavirus pandemic. - Covenants in our debt instruments [added: and credit agreements] may adversely affect our business.
- Financial market performance directly affects the asset values of our
[removed: Nuclear Decommissioning Trust (NDT) Fund and]defined benefit plan trust[removed: funds.][added: funds and Nuclear Decommissioning Trust (NDT) Fund.] Market performance and other factors could decrease the value of trust assets and could result in the need for significant additional funding. - We are subject to third-party credit risk relating to our sale of [added: nuclear] generation output and purchase of [added: nuclear] fuel.
- There may be periods when PSEG Power [added: generation output] may not be able to meet its commitments under forward sale obligations [added: and PJM rules] at a reasonable cost or at all.
- Certain of our generation facilities rely on transmission facilities that we do not own or control and that may be subject to transmission constraints. Transmission facility owners’ inability to maintain adequate transmission capacity could restrict our ability to deliver wholesale electric power to our customers and we may either incur additional costs or forgo revenues.
[removed: Conversely, improvements to certain transmission systems could also reduce revenues.] [removed: Our][added: The markets, PTC and/or ZEC program may not provide sufficient revenue for our] New Jersey nuclear plants[removed: may not be awarded ZECs in future periods,]or the[removed: current or subsequent][added: PTC and/or] ZEC program[removed: periods]could be materially adversely modified through legal proceedings, either of which could result in the retirement of all of these nuclear plants.- We may not receive necessary
[removed: licenses and][added: licenses,] permits [added: and siting approvals] in a timely manner or at all, which could adversely impact our business and results of operations.
A heading is new when no FY2021 heading matches it after ignoring case and punctuation, and reworded when it shares at least 60 percent of its words with one that went away. All current risk factor headings.
Sentences by item
22 items, with every count and a link to each item that changed
Underlined words on a shaded ground are new in FY2022; struck-through words were in FY2021. Sentences that are wholly new or wholly gone are labelled rather than marked.
Item 1A. RISK FACTORS
102 rewritten, 72 added, 70 removed, 242 unchanged
Read the full itemFY2022 item · filed February 22, 2023FY2021 item · filed February 24, 2022
Inability to successfully develop, obtain regulatory approval for, or construct T&D, and [removed: solar and wind] [added: other] generation projects could adversely impact our businesses.
- complete supporting [removed: information technology] [added: IT] upgrades;
In addition, the successful operation of new [removed: solar or wind or upgraded generation] facilities or transmission or distribution projects is subject to risks relating to supply interruptions; labor availability, work stoppages and labor disputes; weather interferences; unforeseen engineering and environmental problems, including those related to climate change; opposition from local communities, and the other risks described herein.
Further, [added: certain] negative public and political views on natural gas could result in diminishing political support for utility investments in gas infrastructure.
We are subject to physical, financial and transition risks related to climate change, including potentially increased legislative and regulatory burdens and changing customer preferences, and we may be subject to lawsuits, all of which could impact our businesses and results of [removed: operations.][added: operations, as well as our ability to implement our clean energy strategy.]
While the CIP protects margin variances against changes in customer usage of gas and electricity, customer demand for [removed: our] [added: natural] gas could decrease as a result of changing customer preferences favoring electrification and advanced technologies that offer energy efficient options.
Further, climate change may adversely impact the economy and reduced economic and consumer activity in our service areas could [removed: reduce] [added: lower] demand for electricity and gas we deliver.
[removed: All] [added: Any one or all] of these factors could impact the need to invest in our electric and gas T&D systems and, therefore, the rate of growth of our company.
To the extent financial markets view climate change and [removed: GHG] [added: greenhouse gas (GHG)] emissions as a financial risk, our ability to access capital markets could be negatively affected or cause us to receive less than [removed: ideal] [added: favorable] terms and conditions.
Climate change-related political [removed: pressure] [added: action] and [added: state and federal] policy goals, including but not limited to those related to energy efficient targets, solar targets, [added: energy storage targets,] encouragement of electrification through EV adoption, [removed: home heating,] [added: policies to restrict the use of natural gas in new or existing homes] and [added: businesses, or encourage electrification of end use equipment currently fueled by natural gas, and] the associated legislative and regulatory responses, may create financial risk as our operations may be subject to additional regulation at either the state or federal level in the future.
We may be adversely affected by asset and equipment failures, critical operating technology or business system failures, accidents, natural disasters, severe weather events, acts of war or [removed: terrorism,] [added: terrorism or other acts of violence,] sabotage, [removed: cyberattack,] [added: physical attacks] or [added: security breaches, cyberattacks, or] other incidents, including pandemics such as the [removed: ongoing] coronavirus pandemic, that impact our ability to provide safe and reliable service to our customers and remain competitive and could result in substantial financial losses.
We are exposed to the risk of asset and equipment failures, [added: gas explosions,] accidents, natural disasters, severe weather events, acts of war or [removed: terrorism,] [added: terrorism or other acts of violence, including active shooter situations (such as the shooting incident involving an employee and a former employee which occurred in February 2023 outside of a PSE&G field facility in Somerset County, New Jersey),] sabotage, [removed: cyberattack] [added: physical attacks] or [added: security breaches (as have been experienced recently by certain] other [added: utilities), cyberattacks or other] incidents, which could result in damage to or destruction of our [added: substations or other] facilities or [added: infrastructure, or] damage to persons or property and to [added: electric and] gas supply interruptions.
We are also exposed to the risk of pandemics, such as the [removed: ongoing] coronavirus pandemic, which could result in service disruptions and delay or otherwise impair our ability to timely provide service to our customers or complete our investment projects.
In addition, [added: the effects of] climate change will [removed: exacerbate] [added: have increased] the physical risks to our facilities and operations resulting from such climate hazards as more severe weather events (extreme wind, rainfall and flooding), such as experienced from Superstorm Sandy and Tropical Storms Isaias and Ida, sea level rise, and extreme heat.
[removed: Such] [added: Any of the] issues [added: described above, if] experienced at our facilities, or by others in our industry, could adversely impact our revenues; increase costs to repair and maintain our systems; subject us to potential litigation and/or damage claims, fines or penalties; and increase the level of oversight of our utility and generation operations and infrastructure [added: through investigations or through the imposition of additional regulatory or legislative requirements.]
Long-lived assets represent approximately [removed: 70%] [added: 74%] and [removed: 83%] [added: 82%] of the total assets of PSEG and PSE&G, respectively, as of December 31, [removed: 2021.][added: 2022.]
The ability to arrange financing and [added: to refinance existing debt and] the costs of such financing [added: or refinancing] depend on numerous factors including, among other [removed: things.][added: things:]
As a result, no assurance can be given that we will be successful in obtaining financing for projects and investments, [removed: to extend] [added: extending] or [removed: refinance] [added: refinancing] maturing debt or [removed: for] [added: meeting] our other cash flow needs on acceptable terms or at all, which could materially adversely impact our financial position, results of operations and future growth.
Cybersecurity attacks or intrusions or other disruptions to our [removed: information technology,] [added: IT,] operational or other systems could adversely impact our businesses.
Cybersecurity threats to the energy market infrastructure are increasing in sophistication, magnitude and frequency, particularly since [removed: COVID-19] [added: the coronavirus pandemic] and the resulting shift to virtual operations began.
Because of the inherent vulnerability of infrastructure and technology and operational systems to disability or failure due to hacking, viruses, malicious or destructive code, phishing [added: and other social engineering] attacks, denial of service attacks, ransomware, acts of war or terrorism, or other cybersecurity incidents, we face increased risk of cyberattack.
We rely on information [added: and operational] technology systems and network infrastructure to operate our generation and T&D systems.
We also store sensitive data, intellectual property and proprietary or personally identifiable information regarding our business, [added: infrastructure,] employees, shareholders, customers and vendors on our [added: IT] systems and conduct power marketing and hedging activities.
In addition, the operation of our business is dependent upon the [removed: information technology] [added: IT] systems of third parties, including our vendors, regulators, RTOs and ISOs, among others.
Our and third-party [removed: information technology] [added: operational and IT] systems and products may be vulnerable to cybersecurity attacks involving fraud, malice or oversight on the part of our employees, other insiders or third parties, whether domestic or foreign sources.
Cybersecurity [removed: impacts] [added: risks] to our operations include:
- theft of confidential company, employee, shareholder, vendor or customer information, and critical energy infrastructure information, which may cause us to be in breach of certain covenants and contractual or legal [removed: obligations,][added: obligations and pose risk to our system and our customers,]
We and our third-party vendors have been and will continue to be subject to cybersecurity attacks, including but not limited to ransomware, denial of service, [added: business email compromises,] and malware attacks.
If a significant cybersecurity event or breach occurs within our company or with one of our material vendors, we could be exposed to significant loss of revenue, material repair costs to intellectual and physical property, significant fines and penalties [removed: for] [added: if determined that we were in] non-compliance with existing laws and regulations, significant litigation costs, increased costs to finance our businesses, negative publicity, damage to our reputation and loss of confidence from our customers, regulators, investors, vendors and employees.
Our financial condition and results of operations could be adversely affected by the [removed: ongoing] coronavirus pandemic.
In response to the [removed: ongoing] global coronavirus pandemic, we have implemented a comprehensive set of actions to help our customers, communities and employees, and will continue to closely monitor developments and adjust as needed to ensure reliable service while protecting the safety and health of our workforce and the communities we serve.
The pandemic’s potential impact will depend on a number of factors outside of our control, including the duration and severity of the outbreak as well as third-party actions, including governmental [removed: requirements, taken to contain its spread and mitigate its public health effects.][added: requirements.]
We currently cannot estimate the potential impact the [removed: ongoing] coronavirus pandemic may have on our business, results of operations, financial condition, liquidity and cash flows.
[removed: However a prolonged outbreak] [added: The impacts of the pandemic] and associated government and regulatory responses, including the long-term impact they may have on the economy, which could extend beyond the duration of the pandemic, could affect, among other things:
- PSE&G’s residential and C&I customer payment patterns, in part as residential customer non-safety related service disconnections for non-payment [removed: have been] [added: were] temporarily [removed: suspended,] [added: suspended for an extended period,] resulting in adverse impacts to accounts receivable and bad debt expense;
- the recovery of incremental costs incurred related to the pandemic, including higher bad debts; [added: and]
[removed: - financial] [added: Financial] market performance [removed: that adversely impacts] [added: directly affects the] asset values [removed: in] [added: of] our [removed: pension] [added: defined benefit plan trust funds] and Nuclear Decommissioning Trust (NDT) [removed: funds, adversely impacts Net Income and potentially increases related funding requirements; and][added: Fund.]
Certain events such as an aging workforce [added: looking to retire] without [removed: adequate] [added: an opportunity to transfer knowledge to a successor, inadequate] workforce plans and replacements, [removed: a] lack of skill set to [removed: complement] [added: meet current and] evolving business needs, a culture that does not foster [removed: inclusion,] [added: inclusion leading to turnover,] a [removed: labor] [added: workforce] strike [removed: and] [added: resulting from a failure to successfully negotiate new collective bargaining agreements with our labor unions on mutually acceptable terms or at all,] unavailability of resources due to [removed: health impacts or protocol mandates related to] the [removed: COVID-19 pandemic] [added: coronavirus pandemic, acts of violence in the workplace and a workforce that is not engaged] may lead to operating challenges and increased costs.
The challenges include loss of knowledge and a lengthy time period associated with skill development, increased turnover, costs for contractors to replace employees, [removed: and productivity] [added: poor productivity,] and [removed: safety costs.][added: a lack of innovation.]
There is competition [removed: and a tightening market] for [added: these] skilled employees.
- obtain property/land rights in property-constrained areas and at a reasonable cost;
Macroeconomic considerations, including inflationary levels, gas and electric supply prices that are passed through to customers and other pressures could factor into our regulators’ assessment in approving the size, duration and timing of cost recovery of certain of these programs.
Further, our business is subject to policy, regulatory, technology and economic uncertainties and contingencies, including regulatory approvals required for various of our clean energy initiatives, many of which are beyond our control and may affect our ability to implement our clean energy strategy and initiatives and achieve our goal of net zero GHG emissions by 2030, or other GHG emissions reduction or climate-related goals that we may set from time to time, in a cost-effective manner or at all.
We have historically benefited from access to mutual aid, a voluntary and reciprocal arrangement with other utilities that provides access to a trained and flexible labor force which has helped to reduce outage restoration times during extreme weather events.
There is no
guarantee that we will have continued access to mutual aid as the utility industry consolidates and the frequency of severe weather events rises.
During periods of rising energy prices, hedged positions could be out-of-the-money, increasing PSEG Power’s collateral requirements.
A successful cybersecurity attack may result in unauthorized use of our systems to cause disruptions at a third party.
A material shift away from natural gas toward increased electrification and a reduction in the use of natural gas as a result of economic decarbonization measures could adversely impact our business.
Technological advancements enabling customer choice and state climate policy supporting decarbonization are driving transformative change in the electric power industry.
New Jersey utilities are experiencing increased usage by customers and third parties of distributed energy resources, such as on-site solar generation, energy storage, fuel cells, EE, and demand response technologies.
These developments will require modernization of the electric distribution grid to, among other things, accommodate two-way flows of electricity, increase the grid’s capacity, and interconnect distributed energy resources.
In order to enable the New Jersey clean energy economy, sustained investments are required in grid modernization, renewable integration projects, EE programs, energy storage options, EV infrastructure and state infrastructure modernization.
If these changes progressed in the near-term, our business model and our ability to execute on our strategy could be materially impacted.
Various jurisdictions outside of New Jersey have enacted prohibitions or restrictions on the use and consumption of natural gas that will reduce the use of natural gas.
If New Jersey were to enact similar prohibitions or restrictions, a reduction in the use of natural gas could lead to a reduction in the gas customer base, higher customer rates for those customers who remain, and a diminished need for gas infrastructure, which could potentially cause substantial investment value of gas assets to be stranded and removed from our rate base, resulting in a reduction in associated rate recovery.
Our inability to recover through rates our investments into the natural gas system, while still ensuring gas system safety and reliability, could materially affect our financial condition, results of operations, liquidity, and cash flows.
Further, these industry changes, costs associated with complying with new regulatory developments and initiatives and with technological advancements could materially affect our financial condition, results of operations, liquidity, and cash flows.
Pursuant to a BPU order, we have deferred a significant amount of costs for future recovery.
Any inability to obtain timely recovery of these costs could have a material adverse effect on our business.
Further, a number of expanded customer protection measures have been implemented by the State and the BPU, such as an extended moratorium on shut-offs of residential service for non-payment, and more extensive processes to be taken prior to any shut-off of service.
These actions have negatively affected customer payment patterns, leading to an elevated aged accounts receivable balance.
Our ability to manage our accounts receivable balance, recover its carrying costs and any associated bad debts could have a material impact on our business.
Specialized knowledge and experience are required of employees across PSEG and its affiliates.
could reduce our earnings.
PSEG’s and PSE&G’s fixed income debt instruments contain events of default customary for financings of their type, including cross accelerations to other debt of that entity.
The PSEG Power term loan agreement contains a change-of-control clause, which includes PSEG Power ceasing to be a wholly owned subsidiary of PSEG.
Recently, the natural gas market and, therefore, energy markets have become more volatile due to higher domestic demand, increased natural gas exports and impacts from the global liquefied natural gas market, among other things.
The price of natural gas is the primary driver of energy pricing in PJM.
- severe weather conditions;
- incurring penalties due to generation performance failure when called on by PJM during emergency situations;
In addition, the volatility and potential for higher natural gas prices may have a material impact on collateral requirements related to the forward value of our open futures contracts.
Higher collateral requirements reduce available short-term liquidity and increase working capital costs.
operations.
Several states, cities and other stakeholders are also considering bans on new natural gas customers and transitioning away from natural gas in the future.
Such actions could have a material adverse effect on our business.
Forward financial sales offset physical sales in the PJM RTO spot market.
earthquakes, explosions, floods, severe weather or other similar occurrences.
To the extent that PSEG Power does not meet its expected nuclear generation output, PSEG Power would be required to pay the difference between the market price and the contract price on its financial contracts without receiving the physical spot energy revenue or be required to purchase energy at higher prices to cover its shortfall.
In addition, as capacity performance resources in PJM, PSEG’s nuclear units have been and will in the future be required to pay penalties if a forced outage at a plant occurs during a declared emergency event within PJM and that plant’s expected performance exceeds its actual performance during such event.
In August 2021, PSEG entered into two agreements to sell PSEG Power’s 6,750 MW fossil generating portfolio to newly formed subsidiaries of ArcLight Energy Partners Fund VII, L.P., a fund controlled by ArcLight Capital Partners, LLC.
In February 2022, we completed the sale of this fossil generating portfolio.
As a result, risks described in this Item 1A and otherwise in this document that relate solely to this 6,750 MW fossil generating portfolio, except for those related to certain assets and liabilities excluded from the sale transactions, primarily for obligations under environmental regulations, including possible remediation obligations under the New Jersey Industrial Site Recovery Act and the Connecticut Transfer Act, are no longer relevant to our business.
Fluctuations in weather can also affect demand for our services.
For example, milder than normal weather can reduce demand for electricity and gas distribution services.
through investigations or through the imposition of additional regulatory or legislative requirements.
A cybersecurity attack may also leverage such information technology to cause disruptions at a third party.
PSE&G, PSEG Power and PSEG LI are providing essential services during this national emergency related to the coronavirus pandemic.
- the timing of our planned capital programs, including the ability to obtain necessary permits and approvals for our capital programs;
- the availability of capital markets and credit from banks and other financial institutions to fund our operations and capital programs and the cost of borrowing and available terms;
- the availability and productivity of skilled workers and contractors to operate our facilities;
- the ability of our counterparties to meet their contractual obligations to us;
- the potential for assessment of impairment of our long-lived assets;
Any failure or breach of these systems would have a material impact on our business and results of operations.
Specialized knowledge is required of the technical and support employees for our carbon-free infrastructure investments and generation and T&D operations.
Financial market performance directly affects the asset values of our Nuclear Decommissioning Trust (NDT) Fund and defined benefit plan trust funds.
decommissioning trust.
Failure to complete, or delays in completing, our proposed investment in the Ocean Wind project could adversely impact our businesses and prospects.
In December 2020, PSEG entered into a definitive agreement with Ørsted North America to acquire a 25% equity interest in Ørsted’s Ocean Wind project.
On March 31, 2021, the BPU approved PSEG’s investment in Ocean Wind and the acquisition was completed in April 2021.
Our ability to realize the anticipated strategic and financial benefits of these projects is subject to a number of risks, challenges and uncertainties, including, among others:
- the risk that we or Ørsted may determine not to proceed with the project at certain milestones in the development of the project, in accordance with the terms of the transaction documents;
- the fact that, subject to certain investment decision milestones, we will be obligated to fund our proportionate share of future capital expenditures in respect of the project, and such future capital expenditures may be greater than expected as a result of, among other things, potential timing delays, cost overruns, labor disputes or unanticipated liabilities;
- the risk that there may be changes to the tax laws, rules and interpretations applicable to a project, including the risk of any reduction, elimination or expiration of government incentives for wind energy or otherwise that may adversely affect such project’s ability to realize certain anticipated tax benefits and, by extension, our ability to realize a satisfactory return on our investment in the project, including in our capacity as a tax equity investor;
- certain limitations on our ability to influence and control strategic decisions related to the project given our status as a minority investor, and the possibility that we and Ørsted may have different views and priorities regarding the development, construction and operation of the project, as well as other risks and uncertainties inherent in joint venture arrangements;
- risks inherent in entering into a new line of business, offshore wind, in which we have not historically operated, and which may expose us to business and operational risks and liabilities that are different from those we have experienced historically and that may be more difficult to manage given our limited operational experience and resources in this area;
- the risk that we may fail to obtain or maintain, on acceptable terms or at all, any required licenses, permits and other regulatory or third party approvals, or may encounter other environmental or regulatory compliance issues, in connection with the project; and
- the risk of catastrophic events, including damage to project equipment, caused by earthquakes, tornadoes, hurricanes, floods, fires, severe weather, explosions and other natural disasters.
If any such risks or other anticipated or unanticipated liabilities were to materialize, the anticipated benefits of a project may not be fully realized, if at all, and the future performance of the project and our investment therein, as well as our financial condition and results of operations, may be materially and adversely impacted.
Further, as the offshore wind market matures, it may attract more capital and competition and potentially lower the rate of return on any offshore wind projects we are involved in.
Over the past several years, wholesale prices for natural gas have remained well below the peak levels experienced in 2008, in part due to increased shale gas production as extraction technology has improved.
Our fuel supply arrangements must be coordinated with
- transportation may be unavailable if pipeline infrastructure is damaged or disabled;
- pipeline tariff changes may adversely affect our ability to, or cost to, deliver such fuels;
- fuel supplies diverted to residential heating may limit the availability of such fuels for our power plants; and
Operation of our generating stations are subject to market risks that are beyond our control.
Generation output will either be used to satisfy wholesale contract requirements or other bilateral contracts or be sold into competitive power markets.
Participants in the competitive power markets are not guaranteed any specified rate of return on their capital investments.
Generation revenues and results of operations are dependent upon prevailing market prices for energy, capacity, ancillary services and fuel supply in the markets served.
- power transmission or fuel transportation capacity constraints or inefficiencies;
An excerpt. Shown here: 40 of 102 rewritten, 40 of 72 added and 40 of 70 removed. The counts are complete. For every sentence, read Item 1A. RISK FACTORS in the FY2022 filing and the FY2021 filing.
Page headers and footers: 13 lines differ, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of Contents](#i8f9ab1108fd247938596ceae8439dec7_7)
Item 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS (MD&A)
218 rewritten, 173 added, 267 removed, 344 unchanged
Read the full itemFY2022 item · filed February 22, 2023FY2021 item · filed February 24, 2022
PSEG’s business consists of two reportable segments, PSE&G and PSEG Power LLC (PSEG [removed: Power),] [added: Power) & Other, primarily comprised of] our principal direct wholly owned subsidiaries, which are:
PSE&G also invests in regulated solar generation projects and energy efficiency [added: (EE)] and related programs in New Jersey, which are regulated by the BPU, and
- PSEG Power—which is [removed: a multi-regional] [added: an] energy supply company that integrates the operations of its merchant nuclear [removed: and fossil] generating assets with its fuel supply functions through competitive energy sales [removed: in well-developed energy markets primarily in the Northeast and Mid-Atlantic United States through] [added: via] its principal direct wholly owned subsidiaries.
PSEG Power’s subsidiaries are subject to regulation by FERC, the Nuclear Regulatory Commission (NRC), the Environmental Protection Agency [removed: (EPA)] and the states in which they operate.
[added: The PSEG Power & Other reportable segment also includes amounts related to the parent company as well as] PSEG’s other direct wholly owned [removed: subsidiaries] [added: subsidiaries, which] are: PSEG Energy Holdings L.L.C. (Energy Holdings), which holds our investments in [removed: offshore wind ventures and] legacy [removed: portfolio of] lease [removed: investments;] [added: investments and investments in offshore wind ventures;] PSEG Long Island LLC (PSEG LI), which operates the Long Island Power Authority’s (LIPA) transmission and distribution (T&D) system under an Operations Services Agreement (OSA); and PSEG Services Corporation (Services), which provides certain management, administrative and general services to PSEG and its subsidiaries at cost.
The following discussion provides an overview of the significant events and business developments that have occurred during [removed: 2021] [added: 2022] and key factors that we expect may drive our future performance.
Management’s Discussion and Analysis of Financial Condition and Results of Operations in our Annual Report on Form 10-K for the year ended December 31, [removed: 2020 (2020 Annual Report)] [added: 2021] as filed with the SEC on February [removed: 26, 2021.][added: 24, 2022 for information related to the year ended December 31, 2021 as compared to 2020, which information is incorporated herein by reference.]
EXECUTIVE OVERVIEW OF [removed: 2021] [added: 2022] AND FUTURE OUTLOOK
We are focused on [removed: meeting customer expectations and being well aligned with public policy objectives by] investing to modernize our energy infrastructure, improve [removed: reliability,] [added: reliability and resilience,] increase [removed: energy efficiency] [added: EE] and deliver cleaner [removed: energy.][added: energy to meet customer expectations and be well aligned with public policy objectives.]
In furtherance of these goals, over the past few years, our investments have [removed: altered] [added: simplified] our business mix to reflect a higher percentage of earnings contribution by [removed: PSE&G, which improves][added: PSE&G.]
See [added: a discussion in] Item [removed: 8.][added: 7.]
Early Plant Retirements/Asset Dispositions and [removed: Impairments for additional information.][added: Impairments.]
At PSE&G, our focus is on [removed: enhancing] [added: investing capital in T&D infrastructure and clean energy programs to enhance the] reliability and resiliency of our T&D system, [removed: meeting] [added: meet] customer expectations and [removed: supporting] [added: support] public policy [removed: objectives by investing capital in T&D infrastructure and clean energy programs.][added: objectives.]
For the years [removed: 2021-2025,] [added: 2023-2027,] PSE&G’s capital investment program is estimated to be in a range of [removed: $14] [added: $15.5] billion to [removed: $16] [added: $18] billion, resulting in an expected compound annual growth in rate base of [removed: 6.5%] [added: 6%] to [removed: 8%.][added: 7.5% from year-end 2022 to year-end 2027.]
The low end of [removed: the] [added: this] range [removed: assumes] [added: includes] an extension of our Gas System Modernization Program (GSMP) and Clean Energy Future [removed: (CEF)-Energy Efficiency (EE)] [added: (CEF)-EE] program at their average annual investment [removed: levels,] [added: levels plus inflation,] as these programs are expected to continue [removed: at least at those current rates] beyond their currently approved timeframe of 2023.
The upper end of [removed: the] [added: our capital investment] range [removed: also] includes an extension of our Energy Strong program, which otherwise concludes in [removed: 2023,] [added: 2024,] as well as the remaining portion of our CEF proposal (portion of Electric Vehicle (EV) and Energy Storage (ES) programs) and a potentially higher amount of [removed: investment] [added: investments] for GSMP and CEF-EE beyond current levels.
A remaining component of our [added: CEF-EV] program related to medium and heavy duty charging infrastructure [removed: was] [added: has been] the subject of a stakeholder process [removed: at] [added: that] the BPU [added: began] in [removed: 2021.][added: 2021 and we expect that this effort will result in PSE&G submitting a filing targeting infrastructure investments for the medium and heavy duty EV market in 2023.]
[removed: As discussed further below, in] [added: In] October 2021, FERC approved [removed: PSE&G’s] [added: a] settlement [added: agreement effective August 1, 2021 that we reached] with the BPU and the New Jersey Division of Rate Counsel [removed: (New Jersey Rate Counsel) regarding several amendments to our transmission formula rate, including] [added: about] the [removed: reduction] [added: level] of [removed: its] [added: PSE&G’s] base transmission [removed: return on equity (ROE) from 11.18% to 9.9%.][added: ROE and other formula rate matters.]
PSEG [removed: Power][added: Power & Other]
During [removed: 2021,] [added: 2022,] our [removed: natural gas and] nuclear units generated [removed: 22.5 and 31.2] [added: 31.3] terawatt hours and operated at a capacity factor of [removed: 49.1% and 91.9%, respectively.][added: 92.2%.]
PSEG Power’s hedging practices help to [removed: manage some] [added: mitigate a significant amount] of the [added: earnings] volatility of the merchant [added: nuclear] power business.
More than 90% of PSEG Power’s expected gross margin in [removed: 2022 from the expected remaining generation assets after the sale of the fossil generation portfolio] [added: 2023] relates to hedging of our energy margin, our expected revenues from the capacity market [removed: mechanisms,] [added: mechanism,] Zero Emission Certificate (ZEC) revenues and, certain gas operations [removed: and ancillary service payments such as reactive power.]
[removed: PSEG LI][added: PSEG]
For more than a century, our [removed: mission] [added: purpose] has been to provide safe access to an around-the-clock supply of reliable, affordable energy.
[removed: In June 2021, we accelerated and expanded our net zero vision by 20 years, establishing] [added: We have established] a net zero greenhouse gas (GHG) emissions by 2030 goal that includes direct GHG emissions (Scope 1) and indirect GHG emissions from operations (Scope 2) [removed: at both PSEG Power and PSE&G (covering] [added: across] our [removed: electric] [added: operations, assuming advances in technology, public policy] and [added: customer behavior.]
Scope 1 emissions include power generation, methane leaks, vehicle fleet emissions, [added: and] sulfur hexafluoride and refrigerant leaks.
[removed: In September 2021, we] [added: We have] also committed to the United Nations-backed Race to Zero campaign.
PSE&G has undertaken a number of initiatives that support the reduction of GHG emissions and the implementation of [removed: energy efficiency] [added: EE] initiatives.
PSE&G’s [removed: recently] approved CEF-EE, [removed: CEF-EC] [added: CEF-Energy Cloud] and CEF-EV programs and the proposed CEF-ES program are intended to support New Jersey’s Energy Master Plan through programs designed to help customers increase their [removed: energy efficiency,] [added: EE,] support the expansion of the EV infrastructure in the State, install energy storage capacity to supplement solar generation and enhance grid resiliency, install smart meters and supporting infrastructure to allow for the integration of other clean energy technologies and to more efficiently respond to weather and other outage events.
In addition, PSE&G is committed to the safe [added: and reliable] delivery of natural gas to [removed: almost two] [added: approximately 1.9] million customers throughout New Jersey and we are equally committed to reducing GHG emissions associated with such operations.
We also continue to assess physical risks of climate change and adapt our capital investment program to improve the reliability and resiliency of our system in an environment of increasing frequency and severity of weather events, notably through our investments in our Energy Strong [removed: program.][added: program and Infrastructure Advancement Program.]
These investments have [removed: proven effective] [added: shown benefits] in recent severe weather events, including Tropical Storm Ida in August 2021, which brought significant flooding to our service territory but did not result in the loss of any of our electric distribution substations.
Our priority is to preserve the economic viability of our nuclear units, which provide over [removed: 90%] [added: 85%] of the carbon-free energy in New Jersey, by advocating for state and federal [removed: policies] [added: policies, such as the IRA discussed below,] that recognize the value of [removed: emission-free] [added: carbon-free] generation and reduce market risk.
[removed: In December 2020,] PSEG [removed: entered into a definitive agreement with Ørsted North America Inc. (Ørsted) to acquire] [added: holds] a 25% equity interest in [removed: Ørsted’s] [added: Ørsted North America Inc.’s (Ørsted)] Ocean Wind [added: 1] project which is currently in development.
In [removed: April 2021,] [added: 2021-2022,] PJM [removed: announced the opening of the first] [added: Interconnection, L.L.C. (PJM) conducted its first-ever] public policy Order 1000 [removed: bid window that would utilize] [added: transmission solicitation process utilizing] the state agreement approach for transmission projects to support New Jersey’s planned offshore wind generation.
[removed: In September 2021,] PSEG and Ørsted jointly submitted several proposals in response to the solicitation, including multi-spur options and an offshore network proposal.
The financial results for PSEG, PSE&G and PSEG Power for the years ended December 31, [removed: 2021] [added: 2022] and [removed: 2020] [added: 2021] are presented as follows:
| | | | | | | | | | [added: 2022 | | | | | |] 2021 | | | | | | 2020 | | | | | |
| | | | PSE&G | | | | | | $ | [added: 1,565 | | | | | $ |] 1,446 | | | | | $ | 1,327 | | | | |
| | | | PSEG Power | | | | | | [removed: (2,056)] [added: 1,250] | | | | | | [removed: 594] [added: —] | | | | | | [added: 1,250 | | | | | | — | | | | | | — | | | | | |]
We are a public utility holding company that, acting through our wholly owned subsidiaries, is a predominantly regulated electric and gas utility and a nuclear generation business.
Our business plan focuses on achieving growth by allocating capital primarily toward regulated investments in an effort to continue to improve the sustainability and predictability of our business.
We have further proactively changed our business mix through the sale of our fossil generation portfolio which closed in 2022.
In addition, the passage of the Inflation Reduction Act (IRA) established a Production Tax Credit (PTC) for nuclear from 2024 through 2032 which is expected to provide downside price protection for our nuclear generation fleet.
We filed for a $320 million short-term extension of our CEF-EE program in September 2022, which we expect will be resolved in 2023.
Our CEF-ES program is being held in abeyance.
In September 2022, the BPU released a draft Storage Incentive Program proposal and is currently undertaking a stakeholder process to receive comments.
PSE&G is active in the proceeding.
Pursuant to our GSMP II and Energy Strong II programs, we are required to file a distribution base rate case no later than December 31, 2023.
Among other things, the rate case will recover capital expenditures associated with these programs, as well as the Advanced Metering Infrastructure and EV programs, and other investments that are not recovered through periodic rate roll-ins.
We expect to conclude the case in the second half of 2024.
At PSEG Power, we seek to produce low-cost electricity by efficiently operating our nuclear generation assets, mitigate volatility by contracting in advance for a significant portion of their output and support public policy objectives that preserve these existing nuclear generating plants.
We recently closed the sale of our Solar generation and Fossil generation businesses in 2021 and 2022, respectively.
These transformative transactions reduced our overall business risk and earnings volatility.
and ancillary service payments such as reactive power.
During the second half of 2021 and continuing throughout 2022, forward energy prices have demonstrated considerable price volatility and have increased dramatically.
This has led to significantly higher variation in our collateral requirements, which have also increased substantially over that time period for hedge positions that are out-of-the money.
PSEG Power’s net cash collateral postings related to these hedge positions increased from $343 million at the end of June 2021 to $1.5 billion at the end of December 2022.
Subsequent to December 2022, collateral postings continued to experience significant fluctuations in our daily collateral requirements.
Net cash collateral postings were approximately $700 million as of February 17, 2023.
While currently off their highs experienced during 2022, collateral postings could remain volatile into 2023.
However, as historical lower-priced trades continue to settle through 2024, collateral is expected to be returned as we satisfy our obligations under those contracts.
PSEG continues to maintain sufficient liquidity as described in Liquidity and Capital Resources.
Today, our vision is to power a future where people use less energy, and it is cleaner, safer and delivered more reliably than ever.
We continue to evaluate and are working toward developing and submitting science-based emission reduction targets following the criteria and recommendations of the Science Based Targets initiative (SBTi) by September 2023 which encompass Scopes 1, 2, and 3 (the majority of which are associated with the downstream use of energy products) and seek to be in line with 1.5oC emissions scenarios in order to be validated by the SBTi.
In February 2023, New Jersey Governor Murphy issued three executive orders that establish targets, or accelerate previously established 2050 targets, for clean-sourced energy, building electrification, and EV adoption goals, with new target dates of 2030 or 2035, as applicable.
The executive orders direct the BPU and other state agencies to collaborate with stakeholders to develop plans, including the new 2024 Energy Master Plan, to reach the targets and convene a stakeholder proceeding to develop a new plan for gas distribution utilities to reach the target, previously established in a 2021 executive order, of 50% natural gas emissions reductions over 2006 levels by 2030.
Such proceeding is to consider competitive market mechanisms including adoption of a “clean heat” standard, policies to minimize investment in new gas infrastructure, and alternative programs that could provide natural gas utilities with new revenue streams, such as conversion of existing pipeline infrastructure to provide decarbonized heating and cooling (for example, district geothermal).
We are unable to predict the
outcomes of the various proceedings, but they could have a material impact on our business, results of operations and cash flows.
In January 2023, PSEG agreed to sell to Ørsted its 25% equity interest in Ocean Wind JV HoldCo, LLC.
The sale proceeds approximate PSEG’s carrying value of the investment and no material gain or loss is expected upon disposition.
The sale is contingent upon finalization of a purchase and sale agreement with Ørsted and other closing conditions as well as potential state regulatory approval that may be required to close on the transaction.
The sale is expected to close in the first half of 2023.
PSEG has no further obligation to make any capital contributions to the project prior to closing on the transaction.
PSEG will continue to provide construction management and environmental permitting services for the onshore substations and transmission cable installation scope of the project.
PSEG has decided not to exercise its option to purchase 50% of Ørsted’s Skipjack projects in Maryland (one of which would utilize a portion of the GSOE lease area) or pursue an ownership interest in Ørsted’s Ocean Wind 2 offshore wind project or other offshore wind generation projects.
PSEG is evaluating its options for the potential sale of its interest in GSOE.
The BPU completed its review of offshore wind transmission in October 2022 and awarded several on-shore, though no offshore, solutions.
PSE&G was awarded $40 million for transmission upgrades.
PSEG Power is no longer a Securities and Exchange Commission (SEC) registrant; however, it continues to be consolidated and reported in PSEG’s financial statements as a wholly owned subsidiary and operating segment.
In August 2021, PSEG entered into two agreements to sell PSEG Power’s 6,750 megawatts (MW) fossil generating portfolio to newly formed subsidiaries of ArcLight Energy Partners Fund VII, L.P., a fund controlled by ArcLight Capital Partners, LLC.
In February 2022, we completed the sale of this fossil generating portfolio.
As a result, disclosures in this Item 7 and elsewhere in this document that relate solely to this 6,750 MW fossil generating portfolio, except for those related to certain assets and liabilities excluded from the sale transactions, primarily for obligations under environmental regulations, including possible remediation obligations under the New Jersey Industrial Site Recovery Act and the Connecticut Transfer Act, are no longer relevant to our business.
For a discussion of 2020 items and year-over-year comparisons of changes in our financial condition and results of operations as of and for the years ended December 31, 2020 and December 31, 2019, see Item 7.
We are progressing on our strategy to become a predominantly regulated electric and gas utility and a contracted carbon-free energy infrastructure company.
Our business plan focuses on achieving growth while controlling costs and managing the risks associated with regulatory and policy changes and fluctuating commodity prices.
the sustainability and predictability of our earnings and cash flows.
In June 2021, we completed the sale of PSEG Power’s solar portfolio and in August 2021 we entered into two agreements to sell PSEG Power’s 6,750 MW of fossil generation located in New Jersey, Connecticut, New York and Maryland.
In February 2022, we completed the sale of this fossil generation portfolio, which represented an important milestone in our strategy and has further altered our business mix, resulting in an even higher percentage of earnings contribution by PSE&G going forward and provides more financial flexibility.
PSE&G, PSEG Power and PSEG LI are providing essential services during the coronavirus (COVID-19) pandemic.
We have implemented a comprehensive set of enhanced safety actions to help protect our employees, customers and communities, and we will continue to closely monitor developments and adjust as needed to ensure that we provide reliable service while protecting the safety and health of our workforce and the communities we serve.
We continue to be guided by the recommendations of health authorities at the federal, state and local levels.
The COVID-19 pandemic and associated government actions and economic effects continue to impact our businesses.
We have incurred additional expenses to protect our employees and customers, and PSE&G is experiencing significantly higher customer bad debts and lower cash collections, as discussed below.
The potential future impact of the pandemic and the associated economic impacts, which could extend beyond the duration of the pandemic, will depend on a number of factors outside of our control.
These include the duration and severity of the outbreaks as well as third-party actions taken to contain their spread and mitigate their public health effects, and governmental or regulatory actions regarding customer collections, potential limitations on rate increases, recovery of incremental costs, and other matters.
While we currently cannot estimate the potential impact to our results of operations, financial condition and cash flows, this MD&A includes a discussion of potential effects of a prolonged outbreak.
The upper end of the range is driven by certain unapproved investment programs, including an Infrastructure Advancement Program (IAP) which we filed in November 2021.
The IAP is a proposed $848 million investment program made over four years to improve the reliability of the “last mile” of our electric distribution system, address aging substations and gas metering and regulating stations and invest in electric vehicle charging infrastructure at our facilities to support the electrification of our fleet over the coming years.
During 2022, we expect to file for extensions of our GSMP and CEF-EE program, which we expect will conclude in the first half of 2023.
In September 2020, PSE&G reached a settlement with parties in the CEF-EE proceeding, which the BPU approved.
The settlement commits $1 billion over a three-year period, with the majority of the investment occurring over a five-year period.
Costs will be recovered through annual rate-making, with returns aligned with our most recent base rate case and a ten-year amortization period.
The approval also included a Conservation Incentive Program (CIP), a mechanism that provides for recovery of lost electric and gas variable margin revenues relative to a baseline of the test year (July 2017 to June 2018) set in in our last base rate case.
The deferral period for this mechanism became effective in June 2021 for electric and October 2021 for gas.
PSE&G suspended its gas Weather Normalization Charge (WNC) when the gas CIP began.
In January 2021, the BPU approved a settlement with PSE&G and other parties in the CEF-Energy Cloud (EC) proceeding.
The capital cost of the program, which is driven by the implementation of advanced metering infrastructure (AMI), is estimated to be $707 million, invested over the next four years.
Also in January 2021, the BPU approved a settlement with PSE&G and other parties in the CEF-EV proceeding for a majority of the components of the program.
The approved investment under the program is for approximately $166 million, primarily relating to preparatory work to deliver infrastructure to the charging point for three programs: residential smart charging; Level-2 mixed use charging; and direct current fast charging.
We currently anticipate that this effort will conclude with PSE&G submitting a filing in mid-year 2022 targeting infrastructure investments for the medium and heavy duty EV market.
All of the capital costs and expenses of the CEF-EC and CEF-EV programs are expected to be recovered in PSE&G’s next base rate case, expected to be filed with the BPU by the end of 2023.
From the start of the program until the commencement of new base rates, the return on and of the capital portion of each of these programs, as well as expenses incurred to implement the CEF-EV program and operating costs and stranded costs associated with the retirement of existing meters under the CEF-EC program, will be included for recovery as part of our next rate case expected to be concluded in the second half of 2024.
Our CEF-ES program is being held in abeyance pending future policy guidance from the BPU.
We also continue to invest in transmission infrastructure in order to (i) maintain and enhance system integrity and grid reliability, (ii) ensure system resilience in the face of continued extreme weather conditions and cyber and physical security threats, (iii) address an aging transmission infrastructure, (iv) leverage technology to improve the operation of the system, (v) reduce transmission constraints, (vi) meet changing customer usage patterns and the demand for 24/7 electricity, and (vii) satisfy state public policy goals, including aggressive decarbonization agendas.
As part of a solicitation by the BPU, we also proposed two transmission projects to support the development of offshore wind which are being evaluated by the BPU and PJM Interconnection, L.L.C. (PJM), with project awards expected in late 2022.
The ongoing coronavirus pandemic and associated impacts could have several negative consequences, including potential delays of our regulatory agencies’ review and approval of proposed programs or rate recovery.
The coronavirus has also impacted PSE&G’s sales, with a reduction in demand from its commercial and industrial (C&I) customers, largely offset by increases in residential sales volumes.
As a result, there has been no substantive net margin impact and changes are now largely addressed through the CIP mechanism that became effective in 2021.
An excerpt. Shown here: 40 of 218 rewritten, 40 of 173 added and 40 of 267 removed. The counts are complete. For every sentence, read Item 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS (MD&A) in the FY2022 filing and the FY2021 filing.
Page headers and footers: 24 lines differ, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of Contents](#i8f9ab1108fd247938596ceae8439dec7_7)
[Table of Contents](#i8f9ab1108fd247938596ceae8439dec7_7)
[Table of Contents](#i8f9ab1108fd247938596ceae8439dec7_7)
Item 7A. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT
14 rewritten, 1 added, 3 removed, 40 unchanged
Read the full itemFY2022 item · filed February 22, 2023FY2021 item · filed February 24, 2022
| | | | Period End | | | | | | $ | [removed: 71] [added: 122] | | | | | $ | [removed: 16] [added: 71] | | | | |
| | | | Average for the Period | | | | | | $ | [removed: 36] [added: 152] | | | | | $ | [removed: 10] [added: 36] | | | | |
| | | | High | | | | | | $ | [removed: 113] [added: 365] | | | | | $ | [removed: 18] [added: 113] | | | | |
| | | | Low | | | | | | $ | [removed: 7] [added: 70] | | | | | $ | [removed: 5] [added: 7] | | | | |
| | | | Period End | | | | | | $ | [removed: 112] [added: 191] | | | | | $ | [removed: 24] [added: 112] | | | | |
| | | | Average for the Period | | | | | | $ | [removed: 57] [added: 239] | | | | | $ | [removed: 16] [added: 57] | | | | |
| | | | High | | | | | | $ | [removed: 178] [added: 572] | | | | | $ | [removed: 29] [added: 178] | | | | |
| | | | Low | | | | | | $ | [removed: 11] [added: 110] | | | | | $ | [removed: 8] [added: 11] | | | | |
[removed: - no material impact on] [added: As of December 31, 2022, a hypothetical 10% increase in market interest rates would result in an additional $6 million in pre-tax] annual interest costs related to either the current or the long-term portion of long-term debt, and [added: term loan agreements.]
As of December 31, [removed: 2021,] [added: 2022,] we had [removed: $7.5] [added: $5.3] billion of net assets in [removed: a] trust for our pension and OPEB plans.
As of December 31, [removed: 2021,] [added: 2022,] the portfolio included [removed: $1.3] [added: $1.1] billion of equity securities and [removed: $1.3] [added: $1.1] billion in fixed income securities.
As of December 31, [removed: 2021,] [added: 2022,] a hypothetical 10% change in the equity market would impact the value of the equity securities in the NDT Fund by approximately [removed: $130] [added: $110] million.
The benchmark for the fixed income component of the NDT Fund currently has a duration of [removed: 6.78] [added: 6.17] years and a yield of [removed: 1.76%.][added: 4.68%.]
As of December 31, [removed: 2021,] [added: 2022,] a hypothetical 1% increase in interest rates would result in a decline in the market value for the fixed income portfolio of approximately [removed: $90] [added: $71] million.
| | | | | | | | | | 2022 | | | | | | 2021 | | | | | |
| | | | | | | | | | 2021 | | | | | | 2020 | | | | | |
As of December 31, 2021, a hypothetical 10% increase in market interest rates would result in
- a $421 million decrease in the fair value of debt, including a $385 million decrease at PSE&G and a $36 million decrease at PSEG.
Page headers and footers: 1 line differs, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
Item 1. BUSINESS
183 rewritten, 126 added, 254 removed, 277 unchanged
Read the full itemFY2022 item · filed February 22, 2023FY2021 item · filed February 24, 2022
Our operations are located primarily in the [removed: Northeastern and Mid- Atlantic] [added: Mid-Atlantic] United States.
Below are descriptions of our two principal direct operating [removed: segments.][added: subsidiaries.]
It also offers appliance services and repairs to customers throughout its service territory and invests in regulated solar generation projects and regulated energy efficiency [added: (EE)] and related programs in New Jersey.
PSEG Power earns revenues from [removed: the] [added: its nuclear] generation and marketing of power and natural gas to hedge business risks and [removed: optimize] the value of its portfolio of [added: nuclear] power plants, other contractual arrangements and [removed: oil and] gas storage facilities.
In February 2022, we completed the sale of [removed: this] [added: our 6,750 megawatt (MW)] fossil generation portfolio which represented an important milestone in our strategy.
Note [removed: 4.][added: 5.]
Over the past few years, our investments [removed: have altered our business mix to reflect] [added: resulted in] a higher percentage of earnings contribution by [removed: PSE&G, which improves the sustainability and predictability of our earnings and cash flows.][added: PSE&G.]
The sale of the fossil generating portfolio further [removed: alters] [added: simplified] our business mix, resulting in an even higher percentage of earnings contribution by PSE&G going forward and provides more financial flexibility.
Our other direct wholly owned subsidiaries are: PSEG Energy Holdings L.L.C. (Energy Holdings), which holds our [removed: investments in offshore wind ventures and] legacy portfolio of lease [removed: investments;] [added: investments and interests in offshore wind ventures;] PSEG Long Island LLC (PSEG LI), which operates the Long Island Power Authority’s (LIPA) electric transmission and distribution (T&D) system under a contractual agreement; and PSEG Services Corporation (Services), which provides us and our operating subsidiaries with certain management, administrative and general services at cost.
[removed: ][added: ]
We [removed: are a transmission owner in PJM Interconnection, L.L.C. (PJM) and we] provide distribution service to 2.3 million electric customers and 1.9 million gas customers in a service area that covers approximately 2,600 square miles running diagonally across New Jersey.
Our current approved rates provide for a base ROE of 9.90% and a 50 basis point adder for our membership in PJM as [removed: a Regional Transmission Operator (RTO).][added: an RTO.]
MD&A—Executive Overview of [removed: 2021] [added: 2022] and Future Outlook.
We continue to invest in transmission projects [removed: that are included for review in the] [added: as part of PJM’s] FERC-approved [removed: PJM] transmission expansion [added: planning] process.
These projects focus on reliability improvements and replacement of aging infrastructure with planned capital spending of [removed: $2.3] [added: $1.8] billion for transmission in [removed: 2022-2024] [added: 2023-2025] as disclosed in Item 7.
The BPU has also approved a series of PSE&G infrastructure, [removed: energy efficiency, electric vehicle] [added: EE, EV] and renewable energy investment programs with cost recovery through various clause mechanisms.
For a discussion of proposed and approved programs, see [removed: Clean Energy Future Program] [added: Investment Clause Programs] below and Item 7.
MD&A—Executive Overview of [removed: 2021] [added: 2022] and Future Outlook.
Our load requirements are split among residential, C&I customers, as described in the following table for [removed: 2021:][added: 2022:]
| | | | Commercial | | | | | | [removed: 56%] [added: 57%] | | | | | | 37% | | | | | |
| | | | Residential | | | | | | [removed: 35%] [added: 34%] | | | | | | 59% | | | | | |
Our customer base has modestly increased since [removed: 2017,] [added: 2018,] with electric and gas loads changing as illustrated in the following table:
| | | | Electric and Gas Distribution Statistics | | | | | | | | | | | | | | | | | | | | | | | | | | | [added: | | | | | |]
| | | | | | | Number [added: of Customers as] of [removed: Customers] [added: December 31, 2022] | | | | | | | | | [added: Historical Annual Customer Growth 2018-2022 | | | | | |] Electric Sales and Firm [removed: Gas Sales] [added: Gas Sales as of December 31, 2022] (A) | | | | | | | | | Historical Annual Load Growth [removed: 2017-2021] [added: 2018-2022] | | | | | |
| | | | Electric | | | 2.3 | | | Million | | | | | | [removed: 40,163] [added: 0.9] | | [added: %] | [added: | | | 40,816 | | |] Gigawatt hours [removed: (GWh)] | | | | | | [removed: (0.7)%] [added: —%] | | | | | |
| | | | Gas | | | 1.9 | | | Million | | | | | | [removed: 2,422] [added: 0.7] | | [added: %] | [added: | | | 2,567 | | |] Million Therms | | | | | | [removed: 0.5%] [added: 1.4%] | | | | | |
Effective June 1 and October 1, 2021 for electric and gas, respectively, as part of the BPU’s approval of the Clean Energy Future-Energy Efficiency [added: (CEF-EE)] filing, we implemented the Conservation Incentive Program (CIP) that trues up PSE&G’s margin to a baseline per customer from our 2018 base rate case for the majority of our customers.
[removed: We have] [added: To date, we] launched three of the four components of our [removed: CEF program:][added: CEF:]
- [removed: Energy Efficiency (EE)—a $1 billion three-year commitment with the majority of the investment occurring over a five-year period, approved by the BPU in September 2020, is designed] [added: EE—designed] to achieve [removed: energy efficiency] [added: EE] targets required under New Jersey’s Clean Energy Act through a suite of ten programs for residential, C&I programs, including low-income, multi-family, small business and local government.
- [removed: Energy Cloud (EC)— a $707 million four-year investment, approved by the BPU in January 2021, driven] [added: EC—driven] by the implementation of “smart meters,” and new software and product solutions to improve our processes and better manage the electric grid.
- [removed: Electric Vehicle (EV)—a $166 million six-year investment, approved by the BPU in January 2021, primarily] [added: EV—primarily] relating to preparatory work to deliver infrastructure to the charging point for three programs: residential smart charging; Level-2 mixed use charging; and direct current (dc) fast charging.
A remaining component of our program related to medium and heavy duty charging infrastructure [removed: has been] [added: is] the subject of a stakeholder process [added: that began in 2021] at the BPU.
MD&A—Executive Overview of [removed: 2021] [added: 2022] and Future [removed: Outlook.][added: Outlook and Item 8.]
[removed: Although commodity revenues make up almost 34% of our revenues, we] [added: We] make no margin on the default supply of electricity and gas since the actual costs are passed through to our customers.
[removed: This] [added: A rising commodity price environment results in higher delivered electric and gas rates for customers, which] could result in decreased demand for electricity and gas, increased regulatory pressures and greater working capital requirements as the collection of higher commodity costs from our customers may be deferred under our regulated rate structure.
Through PSEG Power, we have sought to produce low-cost electricity by efficiently operating our nuclear [removed: and gas/oil-fired] generation assets while balancing [removed: generation output,] fuel requirements and [added: natural gas] supply obligations through energy portfolio management.
In February 2022, we completed the sale of [removed: this] [added: PSEG Power’s 6,750 MW] fossil [removed: generation] [added: generating] portfolio.
These products and services may be transacted [removed: bilaterally or] through exchange markets [removed: and include but are not limited to:][added: or bilaterally.]
In [removed: 2014,] [added: 2022,] the BPU approved an extension of the long-term BGSS contract to March 31, [removed: 2019,] [added: 2027,] and thereafter the contract remains in effect unless terminated by either party with a two-year notice.
Based upon the availability of natural gas beyond PSE&G’s daily needs, PSEG Power sells gas to [removed: others] [added: other customers] and [removed: uses it for its generation fleet.][added: shares these proceeds with PSE&G’s customers.]
We are an energy company consisting primarily of a regulated electric and gas utility and a nuclear generation business.
In addition, we continue to invest in and pursue opportunities in regulated clean energy, including EE, electric vehicle (EV) make-ready charging infrastructure, solar, energy storage and other potential investments.
We are a transmission owner in PJM Interconnection, L.L.C. (PJM) which is an Independent System Operator (ISO) and Regional Transmission Organization (RTO) that operates the electric transmission system in the Mid-Atlantic Region, including
| | | | | | | | | | % of 2022 Sales | | | | | | | | | | | |
Investment Clause Programs
The following table lists our major approved investment clause programs that are in progress:
| | | | Program | | | | | | Investment | | | | | | Approval Date | | | | | | Term of Investment | | | | | | | | | Year Started | | | | | |
| | | | Gas System Modernization Program II (GSMP II) | | | | | | $1.9 billion | | | | | | 2018 | | | | | | 5 years | | | | | | | | | 2019 | | | | | |
| | | | Energy Strong II (ES II) Program | | | | | | $842 million | | | | | | 2019 | | | | | | 4 years | | | (A) | | | | | | 2019 | | | | | |
| | | | CEF-EE | | | | | | $1 billion | | | | | | 2020 | | | | | | 3 years | | | (B) | | | | | | 2020 | | | | | |
| | | | CEF-Energy Cloud (EC) | | | | | | $707 million | | | | | | 2021 | | | | | | 4 years | | | | | | | | | 2021 | | | | | |
| | | | CEF-EV | | | | | | $166 million | | | | | | 2021 | | | | | | ~6 years | | | | | | | | | 2021 | | | | | |
| | | | Infrastructure Advancement Program (IAP) | | | | | | $511 million | | | | | | 2022 | | | | | | 4 years | | | | | | | | | 2022 | | | | | |
(A) The program has a small amount of trailing costs expected to be spent in year 5.
(B)Rolling three-year program with over 80% of spending within 5 years, with limited spending thereafter.
GSMP II—designed to replace approximately 875 miles of cast iron and unprotected steel mains in addition to other improvements to the gas system.
ES II Program—structured to harden, modernize and improve the resiliency of our electric and gas distribution systems.
In December 2022, the BPU issued a revised straw proposal on medium and heavy duty vehicle support for public comment.
IAP—fashioned to improve the reliability of the “last mile” of our electric distribution system and address aging substations and gas metering and regulation stations.
We have also undertaken solar initiatives at PSE&G, which primarily invest in utility-owned solar photovoltaic (PV) grid-connected solar systems installed on PSE&G property and third party sites with our economics driven by our net investment in solar, with a contemporaneous return on that rate base.
As a merchant generator, our revenue is derived primarily from energy, capacity and ancillary services to counterparties in the open markets.
As of December 31, 2022, PSEG Power had 3,766 MW of nuclear generation capacity.
PSEG Power’s Salem 1, Salem 2 and Hope Creek nuclear plants have been awarded Zero Emission Certificates (ZECs) by the BPU through May 2025.
These nuclear plants are expected to receive ZEC revenue from the electric distribution companies (EDCs) in New Jersey, which is equivalent to approximately $10 per megawatt hour (MWh) in payments to selected nuclear plants.
However, there is currently regulatory and timing uncertainty regarding the June 2024 through May 2025 planning year as discussed in Regulatory Issues—Federal Regulation.
normally over a period of two to three years.
In August 2022, the Inflation Reduction Act (IRA) was signed into law expanding incentives promoting carbon-free generation.
The enacted legislation established the production tax credit (PTC) for electricity generation using nuclear energy set to begin in 2024 through 2032.
PSEG Power’s Salem 1, Salem 2, Hope Creek, Peach Bottom 2 and Peach Bottom 3 nuclear plants will each benefit from the PTC.
The expected PTC rate is up to $15/MWh subject to adjustment based upon a facility’s gross receipts.
The PTC rate and the gross receipts cap are subject to annual inflation adjustments.
The U.S. Treasury is expected to clarify the definition of gross receipts prior to when the eligibility period begins in 2024.
We are continuing to analyze the impact of the IRA on our nuclear units, including additional future guidance from the U.S. Treasury, potential impacts on hedging strategies and the impact of PTCs on expected ZEC payments.
In January 2023, PSEG agreed to sell to Ørsted its 25% equity interest in Ocean Wind 1.
The sale is not contingent upon Ørsted electing to proceed to the construction phase of the project.
The sale is contingent upon finalization of a purchase and sale agreement with Ørsted and other closing conditions as well as any potential state regulatory approval that may be required to close on the transaction.
PSEG has decided not to exercise its option to purchase 50% of Ørsted’s Skipjack projects in Maryland (one of which would utilize a portion of the GSOE lease area) or pursue an ownership interest in Ørsted’s Ocean Wind 2 offshore wind project or other offshore wind generation projects.
PSEG is evaluating its options for the potential sale of its interest in GSOE.
Variable Interest Entities for additional information.
Following the effects of Tropical Storm Isaias, LIPA and PSEG LI agreed to an amended OSA which became effective in 2022.
We are an energy company with a diversified business mix.
PSEG Power is no longer an SEC registrant; however, it continues to be consolidated and reported in PSEG’s financial statements as a wholly owned subsidiary and operating segment.
As discussed below, in 2021 PSEG Power sold its solar facilities and entered into two agreements to sell PSEG Power’s 6,750 megawatts (MW) fossil generation asset portfolio.
As a result, disclosures in this Item 1 and otherwise in this document that relate solely to this 6,750 MW fossil generation asset portfolio, except for those related to certain assets and liabilities excluded from the sale transactions, primarily for obligations under environmental regulations, including possible remediation obligations under the New Jersey Industrial Site Recovery Act and the Connecticut Transfer Act, are no longer relevant.
In addition to our current utility products and services, we have implemented a set of programs to encourage conservation and energy efficiency by providing energy and cost-saving measures directly to businesses and families.
Our largest program, Clean Energy Future, as described below, encompasses four programs (i) Energy Efficiency; (ii) Electric Vehicle make ready charging infrastructure; (iii) Energy Cloud and (iv) Energy Storage, three of which we began implementing in 2021.
We have also implemented several programs to invest in regulated solar generation within New Jersey, including programs to help finance the installation of solar power systems throughout our electric service area, and programs to develop, own and operate solar power systems.
| | | | | | | | | | % of 2021 Sales | | | | | | | | | | | |
| | | | | | | December 31, 2021 | | | | | | | | | | | | | | | | | | | | | | | |
Electric sales declined due to the economic impact of the ongoing coronavirus pandemic (COVID-19) on commercial usage, greater conservation, more energy efficient appliances and increases in solar net metering installations, partially offset by an increase in residential sales due to a significant number of customers working from home during the pandemic and customer growth.
Firm gas sales increased due to higher residential sales due to the pandemic, customer growth and customer response to continued low gas prices.
Clean Energy Future (CEF) Program
For additional information on the recovery of revenues, capital costs and expenses related to the CEF program, see Item 7.
We have undertaken two major solar initiatives at PSE&G, the Solar Loan Program and the Solar 4 All® Programs.
Our Solar Loan Program provides solar system financing to our residential and commercial customers.
The loans are repaid with cash or solar renewable energy certificates (SRECs).
We sell the SRECs received through periodic auctions and use the proceeds to offset program costs.
Our Solar 4 All® Programs invest in utility-owned solar photovoltaic (PV) grid-connected solar systems installed on PSE&G property and third-party sites, including landfill facilities, and solar panels installed on distribution system poles in our electric service territory.
We sell the energy from the systems in the PJM wholesale electricity market.
In addition, we sell SRECs generated by the projects through the same periodic auction used in the Solar Loan program, the proceeds of which are used to offset program costs.
In both programs, our economics are driven by our net investment in solar, with a contemporaneous return on that rate base.
Such fluctuations can have a considerable impact on us since a rising commodity price environment results in higher delivered electric and gas rates for customers.
PSEG Power is also subject to certain regulatory requirements imposed by state utility commissions such as those in New York and Connecticut.
In August 2021, we entered into two agreements to sell PSEG Power’s 6,750 MW of fossil generation located in New Jersey, Connecticut, New York and Maryland to newly formed subsidiaries of ArcLight Energy Partners Fund VII, L.P., a fund controlled by ArcLight Capital Partners, LLC.
As a merchant generator, our revenue is derived from selling a range of products and services under contract to an array of customers, including utilities, power marketers, such as retail energy providers, or counterparties in the open market.
- Energy—the electrical output produced by generation plants that is ultimately delivered to customers for use in lighting, heating, air conditioning and operation of other electrical equipment.
Energy is our principal product and is priced on a usage basis, typically in cents per kilowatt hour or dollars per megawatt hour (MWh).
- Capacity—distinct from energy, capacity is a market commitment that a given generation unit will be available to an Independent System Operator (ISO) for dispatch to produce energy when it is needed to meet system demand.
Capacity is typically priced in dollars per MW for a given sale period (e.g. day or month).
- Ancillary Services—related activities supplied by generation unit owners to the wholesale market that are required by the ISO to ensure the safe and reliable operation of the bulk power system.
Owners of generation units may bid units into the ancillary services market in return for compensatory payments.
Costs to pay generators for ancillary services are recovered through charges collected from market participants.
The remainder of this section about PSEG Power covers our nuclear and fossil fleet which comprises the vast majority of PSEG Power’s operations and financial performance.
Properties.
- Capacity
As of December 31, 2021, PSEG Power had 10,638 MW of nuclear and fossil generation capacity, including the fossil assets Held for Sale.
The sale of our 6,750 MW of fossil generation located in New Jersey, Connecticut, New York and Maryland was completed in February 2022.
Effective May 31, 2021, PSEG Power retired its 383 MW coal unit in Bridgeport, Connecticut.
PSEG Power has retired or exited all of its coal-fired generation.
Our generation units have historically been characterized as serving one or more of three general energy market segments: base load; load following; and peaking, based on their operating capability and performance.
An excerpt. Shown here: 40 of 183 rewritten, 40 of 126 added and 40 of 254 removed. The counts are complete. For every sentence, read Item 1. BUSINESS in the FY2022 filing and the FY2021 filing.
Page headers and footers: 21 lines differ, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of Contents](#i8f9ab1108fd247938596ceae8439dec7_7)
[Table of Contents](#i8f9ab1108fd247938596ceae8439dec7_7)
[Table of Contents](#i8f9ab1108fd247938596ceae8439dec7_7)
[Table of Contents](#i8f9ab1108fd247938596ceae8439dec7_7)
Item 3. LEGAL PROCEEDINGS
0 rewritten, 0 added, 0 removed, 5 unchanged
Read the full itemFY2022 item · filed February 22, 2023FY2021 item · filed February 24, 2022
Page headers and footers: 1 line differs, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
Cover and table of contents
81 rewritten, 10 added, 10 removed, 105 unchanged
Read the full itemFY2022 item · filed February 22, 2023FY2021 item · filed February 24, 2022
FOR THE FISCAL YEAR ENDED December 31, [removed: 2021][added: 2022]
[removed: *Cover] [added: *(Cover] continued on next page)*
Indicate by check mark whether the registrants have submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrants were required to submit such [removed: files) .][added: files).]
| Public Service Enterprise Group Incorporated | | | Large Accelerated Filer | | | ☒ | | | Accelerated Filer | | | ☐ | | | Non-accelerated Filer | | | ☐ | | | Smaller [removed: reporting company] [added: reportingcompany] | | | ☐ | | | Emerging growth company | | | ☐ | | |
| Public Service Electric and Gas Company | | | Large Accelerated Filer | | | ☐ | | | Accelerated Filer | | | ☐ | | | Non-accelerated Filer | | | ☒ | | | Smaller [removed: reporting company] [added: reportingcompany] | | | ☐ | | | Emerging growth company | | | ☐ | | |
The aggregate market value of the Common Stock of Public Service Enterprise Group Incorporated held by non-affiliates as of June 30, [removed: 2021] [added: 2022] was [removed: $29,934,856,297] [added: $31,279,390,691] based upon the New York Stock Exchange Composite Transaction closing price.
The number of shares outstanding of Public Service Enterprise Group Incorporated’s sole class of Common Stock as of February [removed: 18, 2022] [added: 17, 2023] was [removed: 502,077,935.][added: 498,769,910.]
As of February [removed: 18, 2022,] [added: 17, 2023,] Public Service Electric and Gas Company had issued and outstanding 132,450,344 shares of Common Stock, without nominal or par value, all of which were held, beneficially and of record, by Public Service Enterprise Group Incorporated.
| III | | | | | | Portions of the definitive Proxy Statement for the [removed: 2022] [added: 2023] Annual Meeting of Stockholders of Public Service Enterprise Group Incorporated, which definitive Proxy Statement is expected to be filed with the Securities and Exchange Commission on or about March [removed: 10, 2022,] [added: 9, 2023,] as specified herein. | | |
| FORWARD-LOOKING STATEMENTS | | | | | | [removed: [iii](#i8f9ab1108fd247938596ceae8439dec7_10)] [added: [iii](#i7aff0ae0d6a44232bab2ed60782f3ed2_10)] | | |
| FILING FORMAT | | | | | | [removed: [1](#i8f9ab1108fd247938596ceae8439dec7_13)] [added: [1](#i7aff0ae0d6a44232bab2ed60782f3ed2_13)] | | |
| WHERE TO FIND MORE INFORMATION | | | | | | [removed: [1](#i8f9ab1108fd247938596ceae8439dec7_16)] [added: [1](#i7aff0ae0d6a44232bab2ed60782f3ed2_16)] | | |
| Item 1. | | | Business | | | [removed: [1](#i8f9ab1108fd247938596ceae8439dec7_25)] [added: [1](#i7aff0ae0d6a44232bab2ed60782f3ed2_25)] | | |
| | | | Operations and Strategy | | | [removed: [2](#i8f9ab1108fd247938596ceae8439dec7_28)] [added: [2](#i7aff0ae0d6a44232bab2ed60782f3ed2_28)] | | |
| | | | Competitive Environment | | | [removed: [9](#i8f9ab1108fd247938596ceae8439dec7_37)] [added: [8](#i7aff0ae0d6a44232bab2ed60782f3ed2_37)] | | |
| | | | Human Capital Management | | | [removed: [10](#i8f9ab1108fd247938596ceae8439dec7_40)] [added: [9](#i7aff0ae0d6a44232bab2ed60782f3ed2_40)] | | |
| | | | Regulatory Issues | | | [removed: [12](#i8f9ab1108fd247938596ceae8439dec7_43)] [added: [10](#i7aff0ae0d6a44232bab2ed60782f3ed2_43)] | | |
| | | | Environmental Matters | | | [removed: [18](#i8f9ab1108fd247938596ceae8439dec7_46)] [added: [15](#i7aff0ae0d6a44232bab2ed60782f3ed2_46)] | | |
| | | | Information About Our Executive Officers (PSEG) | | | [removed: [21](#i8f9ab1108fd247938596ceae8439dec7_49)] [added: [17](#i7aff0ae0d6a44232bab2ed60782f3ed2_49)] | | |
| Item 1A. | | | Risk Factors | | | [removed: [22](#i8f9ab1108fd247938596ceae8439dec7_55)] [added: [18](#i7aff0ae0d6a44232bab2ed60782f3ed2_55)] | | |
| Item 1B. | | | Unresolved Staff Comments | | | [removed: [35](#i8f9ab1108fd247938596ceae8439dec7_61)] [added: [30](#i7aff0ae0d6a44232bab2ed60782f3ed2_61)] | | |
| Item 2. | | | Properties | | | [removed: [35](#i8f9ab1108fd247938596ceae8439dec7_67)] [added: [31](#i7aff0ae0d6a44232bab2ed60782f3ed2_67)] | | |
| Item 3. | | | Legal Proceedings | | | [removed: [36](#i8f9ab1108fd247938596ceae8439dec7_73)] [added: [31](#i7aff0ae0d6a44232bab2ed60782f3ed2_73)] | | |
| Item 4. | | | Mine Safety Disclosures | | | [removed: [36](#i8f9ab1108fd247938596ceae8439dec7_79)] [added: [32](#i7aff0ae0d6a44232bab2ed60782f3ed2_79)] | | |
| Item 5. | | | Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities | | | [removed: [37](#i8f9ab1108fd247938596ceae8439dec7_88)] [added: [32](#i7aff0ae0d6a44232bab2ed60782f3ed2_88)] | | |
| Item 6. | | | \[Reserved\] | | | [removed: [38](#i8f9ab1108fd247938596ceae8439dec7_91)] [added: [33](#i7aff0ae0d6a44232bab2ed60782f3ed2_91)] | | |
| Item 7. | | | Management’s Discussion and Analysis of Financial Condition and Results of Operations | | | [removed: [39](#i8f9ab1108fd247938596ceae8439dec7_100)] [added: [33](#i7aff0ae0d6a44232bab2ed60782f3ed2_100)] | | |
| | | | Executive Overview of [removed: 2021] [added: 2022] and Future Outlook | | | [removed: [39](#i8f9ab1108fd247938596ceae8439dec7_103)] [added: [34](#i7aff0ae0d6a44232bab2ed60782f3ed2_103)] | | |
| | | | Results of Operations | | | [removed: [48](#i8f9ab1108fd247938596ceae8439dec7_109)] [added: [39](#i7aff0ae0d6a44232bab2ed60782f3ed2_109)] | | |
| | | | Liquidity and Capital Resources | | | [removed: [53](#i8f9ab1108fd247938596ceae8439dec7_118)] [added: [45](#i7aff0ae0d6a44232bab2ed60782f3ed2_118)] | | |
| | | | Capital Requirements | | | [removed: [57](#i8f9ab1108fd247938596ceae8439dec7_121)] [added: [49](#i7aff0ae0d6a44232bab2ed60782f3ed2_121)] | | |
| | | | Critical Accounting Estimates | | | [removed: [59](#i8f9ab1108fd247938596ceae8439dec7_127)] [added: [50](#i7aff0ae0d6a44232bab2ed60782f3ed2_124)] | | |
| Item 7A. | | | Quantitative and Qualitative Disclosures About Market Risk | | | [removed: [63](#i8f9ab1108fd247938596ceae8439dec7_133)] [added: [54](#i7aff0ae0d6a44232bab2ed60782f3ed2_130)] | | |
| Item 8. | | | Financial Statements and Supplementary Data | | | [removed: [64](#i8f9ab1108fd247938596ceae8439dec7_139)] [added: [55](#i7aff0ae0d6a44232bab2ed60782f3ed2_136)] | | |
| | | | Report of Independent Registered Public Accounting Firm (PCAOB ID No. 34) | | | [removed: [65](#i8f9ab1108fd247938596ceae8439dec7_142)] [added: [56](#i7aff0ae0d6a44232bab2ed60782f3ed2_139)] | | |
| | | | Consolidated Financial Statements | | | [removed: [70](#i8f9ab1108fd247938596ceae8439dec7_148)] [added: [60](#i7aff0ae0d6a44232bab2ed60782f3ed2_145)] | | |
| | | | Note 1. Organization, Basis of Presentation and Summary of Significant Accounting Policies | | | [removed: [82](#i8f9ab1108fd247938596ceae8439dec7_214)] [added: [72](#i7aff0ae0d6a44232bab2ed60782f3ed2_190)] | | |
| | | | Note 2. Recent Accounting Standards | | | [removed: [88](#i8f9ab1108fd247938596ceae8439dec7_217)] [added: [77](#i7aff0ae0d6a44232bab2ed60782f3ed2_193)] | | |
| | | | Note 4. Early Plant Retirements/Asset Dispositions and Impairments | | | [removed: [94](#i8f9ab1108fd247938596ceae8439dec7_223)] [added: [84](#i7aff0ae0d6a44232bab2ed60782f3ed2_199)] | | |
| | | | Note 5. Variable Interest Entities (VIEs) | | | [removed: [96](#i8f9ab1108fd247938596ceae8439dec7_226)] [added: [85](#i7aff0ae0d6a44232bab2ed60782f3ed2_202)] | | |
| | | | Note 3. Revenues | | | [79](#i7aff0ae0d6a44232bab2ed60782f3ed2_196) | | |
| | | | Note 8. Leases | | | [93](#i7aff0ae0d6a44232bab2ed60782f3ed2_211) | | |
| | | | Note 12. Intangibles | | | [104](#i7aff0ae0d6a44232bab2ed60782f3ed2_223) | | |
| | | | Signatures | | | [163](#i7aff0ae0d6a44232bab2ed60782f3ed2_349) | | |
- a material shift away from natural gas toward increased electrification and a reduction in the use of natural gas;
- our ability to advocate for and our receipt of appropriate regulatory guidance to ensure long-term support for our nuclear fleet;
From time to time, PSEG and PSE&G release important information via postings on their corporate Investor Relations website at https://investor.pseg.com.
Investors and other interested parties are encouraged to visit the Investor Relations website to review new postings.
You can sign up for automatic email alerts regarding new postings at the bottom of the webpage at https://investor.pseg.com or by navigating to the Email Alerts webpage at https://investor.pseg.com/resources/email-alerts/default.aspx.
The information on https://investor.pseg.com and https://investor.pseg.com/resources/email-alerts/default.aspx is not incorporated herein and is not part of this Form 10-K.
| | | | Note 3. Revenues | | | [89](#i8f9ab1108fd247938596ceae8439dec7_220) | | |
| | | | Note 8. Leases | | | [104](#i8f9ab1108fd247938596ceae8439dec7_235) | | |
| | | | Note 12. Intangibles | | | [115](#i8f9ab1108fd247938596ceae8439dec7_247) | | |
| | | | Signatures | | | [176](#i8f9ab1108fd247938596ceae8439dec7_370) | | |
- the failure to complete, or delays in completing, the Ocean Wind offshore wind project and the failure to realize the anticipated strategic and financial benefits of this project;
- market risks impacting the operation of our generating stations;
- the absence of a long-term legislative or other solution for our New Jersey nuclear plants that sufficiently values them for their carbon-free, fuel diversity and resilience attributes, or the impact of the current or subsequent payments for such attributes being materially adversely modified through legal proceedings;
In August 2021, PSEG entered into two agreements to sell PSEG Power’s 6,750 MW fossil generating portfolio to newly formed subsidiaries of ArcLight Energy Partners Fund VII, L.P., a fund controlled by ArcLight Capital Partners, LLC.
In February 2022, PSEG completed the sale of this fossil generating portfolio.
As a result, risks highlighted in these forward-looking statements that relate solely to this 6,750 MW fossil generating portfolio, except for those related to certain assets and liabilities excluded from the sale transactions, primarily for obligations under environmental regulations, including possible remediation obligations under the New Jersey Industrial Site Recovery Act and the Connecticut Transfer Act, are no longer relevant to our business.
An excerpt. Shown here: 40 of 81 rewritten, all 10 added and all 10 removed. The counts are complete. For every sentence, read Cover and table of contents in the FY2022 filing and the FY2021 filing.
Page headers and footers: 7 lines differ, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
Item 1B. UNRESOLVED STAFF COMMENTS
0 rewritten, 0 added, 0 removed, 2 unchanged
Read the full itemFY2022 item · filed February 22, 2023FY2021 item · filed February 24, 2022
Page headers and footers: 1 line differs, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
Item 2. PROPERTIES
8 rewritten, 3 added, 28 removed, 23 unchanged
Read the full itemFY2022 item · filed February 22, 2023FY2021 item · filed February 24, 2022
As of December 31, [removed: 2021,] [added: 2022,] PSE&G’s electric T&D system included approximately 25,000 circuit miles, and [removed: 862,000] [added: 864,000] poles, of which 64% are jointly-owned.
In addition, PSE&G owns and operates [removed: 56] [added: 55] switching stations with an aggregate installed capacity of [removed: 39,353] [added: 39,653] megavolt-amperes (MVA) and 235 substations with an aggregate installed capacity of [removed: 9,285] [added: 9,735] MVA.
As of December 31, [removed: 2021,] [added: 2022,] PSE&G’s gas system included approximately 18,000 miles of gas mains, 12 gas distribution headquarters, two sub-headquarters, and one meter shop serving all of its gas territory in New Jersey.
In addition, PSE&G operates [removed: 58] [added: 56] natural gas metering and regulating stations, of which [removed: 22] [added: 26] are located on land owned by customers or natural gas pipeline suppliers and are operated under lease, easement or other similar arrangement.
As of December 31, [removed: 2021,] [added: 2022,] PSE&G owned 158 MW dc of installed PV solar capacity throughout New Jersey.
As of December 31, [removed: 2021,] [added: 2022,] PSEG Power’s share of installed [removed: fossil and] nuclear generating capacity is shown in the following
| | | | Hope Creek | | | | | | NJ | | | | | | [removed: 1,185] [added: 1,173] | | | | | | 100% | | | | | | [removed: 1,185] [added: 1,173] | | | | | | Nuclear | | | | | | | | | | | |
| | | | Salem 1 & 2 | | | | | | NJ | | | | | | [removed: 2,285] [added: 2,295] | | | | | | 57% | | | | | | [removed: 1,311] [added: 1,318] | | | | | | Nuclear | | | | | | | | | | | |
| | | | Total Nuclear | | | | | | | | | | | | 6,017 | | | | | | | | | | | | 3,766 | | | | | | | | | | | | | | | | | |
(A)Operated by Constellation Energy Generation, LLC.
As of December 31, 2022, PSEG Power owned a 50% interest (104 MW) in a generation facility in Hawaii.
| | | | Total Nuclear | | | | | | | | | | | | 6,019 | | | | | | | | | | | | 3,771 | | | | | | | | | | | | | | | | | |
| | | | Steam: | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| | | | New Haven Harbor | | | | | | CT | | | | | | 448 | | | | | | 100% | | | | | | 448 | | | | | | Oil/Gas | | | | | | | | | | | |
| | | | Total Steam | | | | | | | | | | | | 448 | | | | | | | | | | | | 448 | | | | | | | | | | | | | | | | | |
| | | | Combined Cycle: | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| | | | Keys | | | | | | MD | | | | | | 761 | | | | | | 100% | | | | | | 761 | | | | | | Gas | | | | | | | | | | | |
| | | | Bergen | | | | | | NJ | | | | | | 1,245 | | | | | | 100% | | | | | | 1,245 | | | | | | Gas/Oil | | | | | | | | | | | |
| | | | Linden | | | | | | NJ | | | | | | 1,300 | | | | | | 100% | | | | | | 1,300 | | | | | | Gas/Oil | | | | | | | | | | | |
| | | | Sewaren 7 | | | | | | NJ | | | | | | 538 | | | | | | 100% | | | | | | 538 | | | | | | Gas/Oil | | | | | | | | | | | |
| | | | Bridgeport Harbor 5 | | | | | | CT | | | | | | 484 | | | | | | 100% | | | | | | 484 | | | | | | Gas | | | | | | | | | | | |
| | | | Bethlehem | | | | | | NY | | | | | | 816 | | | | | | 100% | | | | | | 816 | | | | | | Gas | | | | | | | | | | | |
| | | | Kalaeloa | | | | | | HI | | | | | | 208 | | | | | | 50% | | | | | | 104 | | | | | | Oil | | | | | | | | | | | |
| | | | Total Combined Cycle | | | | | | | | | | | | 5,352 | | | | | | | | | | | | 5,248 | | | | | | | | | | | | | | | | | |
| | | | Combustion Turbine: | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| | | | Essex | | | | | | NJ | | | | | | 81 | | | | | | 100% | | | | | | 81 | | | | | | Gas/Oil | | | | | | | | | | | |
| | | | Kearny | | | | | | NJ | | | | | | 456 | | | | | | 100% | | | | | | 456 | | | | | | Gas/Oil | | | | | | | | | | | |
| | | | Burlington | | | | | | NJ | | | | | | 168 | | | | | | 100% | | | | | | 168 | | | | | | Gas/Oil | | | | | | | | | | | |
| | | | Linden | | | | | | NJ | | | | | | 336 | | | | | | 100% | | | | | | 336 | | | | | | Gas/Oil | | | | | | | | | | | |
| | | | New Haven Harbor | | | | | | CT | | | | | | 130 | | | | | | 100% | | | | | | 130 | | | | | | Gas/Oil | | | | | | | | | | | |
| | | | Total Combustion Turbine | | | | | | | | | | | | 1,171 | | | | | | | | | | | | 1,171 | | | | | | | | | | | | | | | | | |
| | | | Total PSEG Power Plants | | | | | | | | | | | | 12,990 | | | | | | | | | | | | 10,638 | | | | | | | | | | | | | | | | | |
(A)Operated by Exelon Generation.
Effective May 31, 2021, PSEG Power retired its Bridgeport Harbor 3 coal plant.
In June 2021, PSEG Power completed the sale of its 467 MW dc of PV solar generation facilities located in various states.
In February 2022, PSEG Power’s fossil generating plants in New Jersey, Connecticut, Maryland and Pennsylvania were sold.
See Item 8.
Note 4.
Early Plant Retirements/Asset Dispositions and Impairments for additional information.
Page headers and footers: 1 line differs, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[Table of Contents](#i8f9ab1108fd247938596ceae8439dec7_7)
Item 4. MINE SAFETY DISCLOSURES
0 rewritten, 0 added, 0 removed, 2 unchanged
Read the full itemFY2022 item · filed February 22, 2023FY2021 item · filed February 24, 2022
Page headers and footers: 1 line differs, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[Table of Contents](#i8f9ab1108fd247938596ceae8439dec7_7)
Item 5. MARKET FOR REGISTRANT’S COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES
13 rewritten, 10 added, 8 removed, 11 unchanged
Read the full itemFY2022 item · filed February 22, 2023FY2021 item · filed February 24, 2022
Our common stock is listed on the New York Stock Exchange, Inc. under the trading symbol “PEG.” As of February [removed: 18, 2022,] [added: 17, 2023,] there were [removed: 52,145] [added: 50,146] registered holders.
The following graph shows a comparison of the five-year cumulative return assuming $100 invested on December 31, [removed: 2016] [added: 2017] in our common stock and the subsequent reinvestment of quarterly dividends, the S&P Composite Stock Price Index, the Dow Jones Utilities Index and the S&P Electric Utilities Index.
| | | | | | | | | | [removed: 2016] [added: 2017] | | | | | | [removed: 2017] [added: 2018] | | | | | | [removed: 2018] [added: 2019] | | | | | | [removed: 2019] [added: 2020] | | | | | | [removed: 2020] [added: 2021] | | | | | | [removed: 2021] [added: 2022] | | | | | |
[removed: ][added: ]
On February [removed: 15, 2022,] [added: 14, 2023,] our Board of Directors approved a [removed: $0.54] [added: $0.57] per share common stock dividend for the first quarter of [removed: 2022.][added: 2023.]
This reflects an indicative annual dividend rate of [removed: $2.16] [added: $2.28] per share.
In [removed: late] September 2021, PSEG announced a $500 million share repurchase program [removed: to be implemented upon the close of] [added: authorized by] the [removed: sale] [added: Board] of [removed: the fossil generation assets.][added: Directors.]
[added: In December 2022,] for [removed: $250 million of our common shares] [added: such purposes, we entered into a share repurchase plan] that complies with Rule 10b5-1 [removed: of] [added: under] the Securities Exchange Act of 1934, as amended.
There were no common share repurchases [added: in the open market] during the fourth quarter of [removed: 2021.][added: 2022.]
[removed: During] [added: Under this authorization, during] January and through [removed: February 16,] [added: mid-February] 2022, [removed: we] [added: PSEG] purchased [removed: the full $250] [added: approximately 3.8] million [removed: of common] shares [removed: under the open market share repurchase plan.][added: of]
The following table indicates the securities authorized for issuance under equity compensation plans as of December 31, [removed: 2021:][added: 2022:]
| | | | Equity Compensation Plans Approved by Security Holders | | | | | | — | | | | | | $ | — | | | | | [removed: 10,121,383] [added: 9,085,980] | | | | | |
The number of shares available for future issuance includes amounts remaining under our 2021 Long-Term Incentive Plan (2021 LTIP) and 2021 Equity Compensation Plan for Outside Directors and [removed: Employee Stock Purchase Plan] [added: ESPP] and reflect a reduction for non-vested restricted stock units and performance share units (PSUs) (assumed at target payout).
| | | | PSEG | | | | | | $ | 100.00 | | | | | $ | 104.67 | | | | | $ | 122.55 | | | | | $ | 125.47 | | | | | $ | 148.47 | | | | | $ | 140.91 | | | | |
| | | | S&P 500 | | | | | | $ | 100.00 | | | | | $ | 95.61 | | | | | $ | 125.70 | | | | | $ | 148.81 | | | | | $ | 191.48 | | | | | $ | 156.77 | | | | |
| | | | DJ Utilities | | | | | | $ | 100.00 | | | | | $ | 101.99 | | | | | $ | 129.82 | | | | | $ | 132.01 | | | | | $ | 155.06 | | | | | $ | 158.23 | | | | |
| | | | S&P Utilities | | | | | | $ | 100.00 | | | | | $ | 104.11 | | | | | $ | 131.54 | | | | | $ | 132.23 | | | | | $ | 155.60 | | | | | $ | 158.03 | | | | |
common stock pursuant to an open market share repurchase plan and during March through mid-May, PSEG purchased an additional 3.6 million shares pursuant to an accelerated share repurchase agreement.
See Item 8.
Note 24.
Earnings Per Share (EPS) and Dividends for additional information.
From time to time, PSEG may repurchase shares to satisfy obligations under equity compensation awards and repurchase shares to satisfy purchases by employees under the Employee Stock Purchase Plan (ESPP).
| | | | Total | | | | | | — | | | | | | $ | — | | | | | 9,085,980 | | | | | |
| | | | PSEG | | | | | | $ | 100.00 | | | | | $ | 121.77 | | | | | $ | 127.46 | | | | | $ | 149.23 | | | | | $ | 152.79 | | | | | $ | 180.80 | | | | |
| | | | S&P 500 | | | | | | $ | 100.00 | | | | | $ | 121.82 | | | | | $ | 116.47 | | | | | $ | 153.13 | | | | | $ | 181.29 | | | | | $ | 233.28 | | | | |
| | | | DJ Utilities | | | | | | $ | 100.00 | | | | | $ | 113.35 | | | | | $ | 115.60 | | | | | $ | 147.16 | | | | | $ | 149.63 | | | | | $ | 175.76 | | | | |
| | | | S&P Utilities | | | | | | $ | 100.00 | | | | | $ | 112.10 | | | | | $ | 116.71 | | | | | $ | 147.46 | | | | | $ | 148.24 | | | | | $ | 174.43 | | | | |
In November 2021, the Board of Directors authorized senior management to implement the share repurchase program at such time as senior management deemed appropriate in its discretion, whether before or after the closing of the fossil sale.
In December 2021, under this authorization PSEG entered into an open market share repurchase plan
| | | | Total | | | | | | — | | | | | | $ | — | | | | | 10,121,383 | | | | | |
The Amended and Restated 2004 LTIP, and the 2007 Equity Compensation Plan for Outside Directors were closed as of April 20, 2021 and all available shares under these plans as of that date or that will become available in the future are cancelled.
Page headers and footers: 1 line differs, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
Item 6. [RESERVED]
0 rewritten, 0 added, 0 removed, 0 unchanged
Read the full itemFY2022 item · filed February 22, 2023FY2021 item · filed February 24, 2022
Page headers and footers: 1 line differs, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[Table of Contents](#i8f9ab1108fd247938596ceae8439dec7_7)
Item 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA
1,180 rewritten, 392 added, 463 removed, 1,831 unchanged
Read the full itemFY2022 item · filed February 22, 2023FY2021 item · filed February 24, 2022
We have audited the accompanying consolidated balance sheets of Public Service Enterprise Group Incorporated and subsidiaries (the “Company” or PSEG) as of December 31, [removed: 2021] [added: 2022] and [removed: 2020,] [added: 2021,] the related consolidated statements of operations, comprehensive [removed: income,] [added: income (loss),] stockholders' equity, and cash flows, for each of the three years in the period ended December 31, [removed: 2021,] [added: 2022,] the related notes and the consolidated financial statement schedule listed in the Index at Item 15(B)(a) (collectively referred to as the “financial statements”).
In our opinion, the financial statements present fairly, in all material respects, the [removed: consolidated] financial position of the Company as of December 31, [removed: 2021] [added: 2022] and [removed: 2020,] [added: 2021,] and the results of its operations and its cash flows for each of the three years in the period ended December 31, [removed: 2021,] [added: 2022,] in conformity with accounting principles generally accepted in the United States of America.
We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States) (PCAOB), the Company's internal control over financial reporting as of December 31, [removed: 2021,] [added: 2022,] based on criteria established in *Internal Control — Integrated Framework (2013)* issued by the Committee of Sponsoring Organizations of the Treadway Commission, and our report dated February [removed: 24, 2022,] [added: 21, 2023,] expressed an unqualified opinion on the Company's internal control over financial reporting.
Critical Audit [removed: Matters][added: Matter]
The critical audit [removed: matters] [added: matter] communicated below [removed: are matters] [added: is a matter] arising from the current-period audit of the financial statements that [removed: were] [added: was] communicated or required to be communicated to the audit committee and that (1) [removed: relate] [added: relates] to accounts or disclosures that are material to the financial statements and (2) involved our especially challenging, subjective, or complex judgments.
The communication of critical audit matters does not alter in any way our opinion on the financial statements, taken as a whole, and we are not, by communicating the critical audit [removed: matters] [added: matter] below, providing [added: a] separate [removed: opinions] [added: opinion] on the critical audit [removed: matters] [added: matter] or on the accounts or disclosures to which [removed: they relate.][added: it relates.]
Critical Audit [removed: Matter Description][added: Matter]
Our audit procedures [removed: related] to [added: evaluate] the accounting for the [removed: sale] [added: effects] of [added: cost-based rate regulation, including] the [removed: fossil] [added: probable recovery or refund of regulatory] assets [added: and liabilities,] included the following, among others:
[removed: Regulatory Assets and Liabilities] [added: Accounting for the Effects of Regulation] – [removed: Income Taxes —Refer] [added: Refer] to Notes [removed: 1, 7,] [added: 1] and [removed: 22] [added: 7] to the financial statements
PSEG’s subsidiary, Public Service Electric and Gas Company (PSE&G), is [removed: an electric and gas transmission and distribution utility] regulated by the [added: New Jersey] Board of Public Utilities (BPU) and the Federal Energy Regulatory [removed: Commission.][added: Commission (FERC), which have jurisdiction with respect to PSE&G’s electric and gas distribution and electric transmission businesses, respectively.]
Our audit procedures to evaluate the accounting for the [removed: TAC and] [added: effects of cost-based rate regulation, including] the [removed: associated regulatory assets,] [added: probable recovery or refund of] regulatory [removed: liabilities,] [added: assets] and [removed: income tax expense] [added: liabilities,] included the following, among others:
[removed: -] We tested the effectiveness of [added: management's] controls over the [removed: calculation] [added: initial recognition] of [removed: the] amounts [removed: refunded through the TAC, including controls over] [added: as regulatory assets or liabilities and] the monitoring and evaluation of regulatory developments that may affect the likelihood of recovering [removed: the TAC regulatory assets] [added: costs] in future [added: rates or of a future reduction in] rates.
- We evaluated the financial statement presentation and disclosures related to [removed: TAC,] [added: the impacts of cost-based rate-regulation,] including the balances recorded and regulatory developments.
| [removed: Parsippany,] [added: Morristown,] New Jersey | | |
| [added: | | |] February [removed: 24,] [added: 15,] 2022 | | | [added: | | | 1.76% | | | | | | 27.34% | | | | | |]
We have audited the accompanying consolidated balance sheets of Public Service Electric and Gas Company and subsidiaries (the "Company" or PSE&G) as of December 31, [removed: 2021] [added: 2022] and [removed: 2020,] [added: 2021,] the related consolidated statements of operations, comprehensive income, common stockholder’s equity, and cash flows, for each of the three years in the period ended December 31, [removed: 2021,] [added: 2022,] the related notes and the consolidated financial statement schedule listed in the Index at Item 15(B)(b) (collectively referred to as the "financial statements").
In our opinion, the financial statements present fairly, in all material respects, the financial position of the Company as of December 31, [removed: 2021] [added: 2022] and [removed: 2020,] [added: 2021,] and the results of its operations and its cash flows for each of the three years in the period ended December 31, [removed: 2021,] [added: 2022,] in conformity with accounting principles generally accepted in the United States of America.
[removed: Regulatory Assets and Liabilities] [added: Accounting for the Effects of Regulation] – [removed: Income Taxes —Refer] [added: Refer] to Notes [removed: 1, 7,] [added: 1] and [removed: 22] [added: 7] to the financial statements
[removed: PSE&G’s electric and gas transmission and distribution businesses are] [added: PSE&G is] regulated by the [added: New Jersey] Board of Public Utilities (BPU) and [added: the] Federal Energy Regulatory [removed: Commission.][added: Commission (FERC), which have jurisdiction with respect to PSE&G’s electric and gas distribution and electric transmission businesses, respectively.]
[removed: -] We tested the effectiveness of [added: management's] controls over the [removed: calculation] [added: initial recognition] of [removed: the] amounts [removed: refunded through the TAC, including controls over] [added: as regulatory assets or liabilities and] the monitoring and evaluation of regulatory developments that may affect the likelihood of recovering [removed: the TAC regulatory asset] [added: costs] in future [added: rates or of a future reduction in] rates.
- We evaluated the financial statement presentation and disclosures related to [removed: TAC,] [added: the impacts of cost-based rate-regulation,] including the balances recorded and regulatory developments.
| [removed: Parsippany,] [added: Morristown,] New Jersey | | |
| | | | | | | | | | [removed: 2021] [added: 2022] | | | | | | [removed: 2020] [added: 2021] | | | | | | [removed: 2019] [added: 2020] | | | | | |
| | | | OPERATING REVENUES | | | | | | $ | [removed: 9,722] [added: 9,800] | | | | | $ | [removed: 9,603] [added: 9,722] | | | | | $ | [removed: 10,076] [added: 9,603] | | | | |
| | | | Energy Costs | | | | | | [removed: 3,499] [added: 4,018] | | | | | | [removed: 3,056] [added: 3,499] | | | | | | [removed: 3,372] [added: 3,056] | | | | | |
| | | | Operation and Maintenance | | | | | | [removed: 3,226] [added: 3,178] | | | | | | [removed: 3,115] [added: 3,226] | | | | | | [removed: 3,111] [added: 3,115] | | | | | |
| | | | Depreciation and Amortization | | | | | | [removed: 1,216] [added: 1,100] | | | | | | [removed: 1,285] [added: 1,216] | | | | | | [removed: 1,248] [added: 1,285] | | | | | |
| | | | (Gains) Losses on Asset Dispositions and Impairments | | | | | | [removed: 2,637] [added: 123] | | | | | | [removed: (123)] [added: 2,637] | | | | | | [removed: 402] [added: (123)] | | | | | |
| | | | Total Operating Expenses | | | | | | [removed: 10,578] [added: 8,419] | | | | | | [removed: 7,333] [added: 10,578] | | | | | | [removed: 8,133] [added: 7,333] | | | | | |
| | | | OPERATING INCOME (LOSS) | | | | | | [removed: (856)] [added: 1,381] | | | | | | [removed: 2,270] [added: (856)] | | | | | | [removed: 1,943] [added: 2,270] | | | | | |
| | | | Income from Equity Method Investments | | | | | | [removed: 16] [added: 14] | | | | | | [removed: 14] [added: 16] | | | | | | 14 | | | | | |
| | | | Net Gains (Losses) on Trust Investments | | | | | | [removed: 194] [added: (265)] | | | | | | [removed: 253] [added: 194] | | | | | | [removed: 260] [added: 253] | | | | | |
| | | | Other Income (Deductions) | | | | | | [removed: 98] [added: 124] | | | | | | [removed: 115] [added: 98] | | | | | | [removed: 125] [added: 115] | | | | | |
| | | | Net Non-Operating Pension and Other Postretirement Benefit (OPEB) Credits (Costs) | | | | | | [removed: 328] [added: 376] | | | | | | [removed: 249] [added: 328] | | | | | | [removed: 177] [added: 249] | | | | | |
| | | | Loss on Extinguishment of Debt | | | | | | [removed: (298)] [added: —] | | | | | | [removed: —] [added: (298)] | | | | | | — | | | | | |
| | | | Interest Expense | | | | | | [removed: (571)] [added: (628)] | | | | | | [removed: (600)] [added: (571)] | | | | | | [removed: (569)] [added: (600)] | | | | | |
| | | | INCOME (LOSS) BEFORE INCOME TAXES | | | | | | [removed: (1,089)] [added: 1,002] | | | | | | [removed: 2,301] [added: (1,089)] | | | | | | [removed: 1,950] [added: 2,301] | | | | | |
| | | | Income Tax Benefit (Expense) | | | | | | [removed: 441] [added: 29] | | | | | | [removed: (396)] [added: 441] | | | | | | [removed: (257)] [added: (396)] | | | | | |
| | | | NET INCOME (LOSS) | | | | | | $ | [removed: (648)] [added: 1,031] | | | | | $ | [removed: 1,905] [added: (648)] | | | | | $ | [removed: 1,693] [added: 1,905] | | | | |
| | | | BASIC | | | | | | [removed: 504] [added: 498] | | | | | | 504 | | | | | | 504 | | | | | |
As a utility subject to cost-based rate regulation, PSE&G is required to defer the recognition of costs as a regulatory asset or recognize obligations as a regulatory liability if the rates established are designed to recover the costs and if it is probable that such rates can be charged or collected in future periods.
This accounting can result in the recognition of revenues and expenses in different time periods than that of enterprises that are not regulated.
Further, regulatory assets and other investments and costs incurred under various filings and clause mechanisms are subject to prudence reviews and can be disallowed in the future by regulatory authorities.
To the extent that collection of revenue or regulatory assets or payments of regulatory liabilities is no
longer probable, the amounts would be charged or credited to income.
Significant judgment can be required to determine if otherwise recognizable revenues and incurred costs qualify to be presented as a regulatory asset or liability.
As of December 31, 2022, PSE&G has approximately $4.8 billion and $2.6 billion recorded as regulatory assets and regulatory liabilities, respectively.
We identified the accounting for the effects of rate regulation as a critical audit matter due to the significant judgments made by management in assessing the probable recovery of regulatory assets and incurred costs or the likelihood of refunds of regulatory liabilities.
These judgments include assumptions regarding the outcome of future decisions by the BPU or FERC.
Auditing these judgments required specialized knowledge of accounting for rate regulation and the ratemaking process due to its inherent complexities.
- We tested the effectiveness of management's controls over the evaluation of the likelihood of (1) the recovery in future rates of costs deferred as regulatory assets, and (2) a refund or a future reduction in rates that should be reported as regulatory liabilities.
- We obtained and read relevant regulatory orders issued by the BPU and FERC for PSE&G and other publicly available information to assess the likelihood of recovery in future rates or of a future reduction in rates based on precedents of the treatment of similar costs under similar circumstances.
We evaluated the external information and compared it to management’s recorded regulatory asset and liability balances for completeness.
- For regulatory matters in process, we inspected associated documents and testimony filed with the BPU or FERC for any evidence that might contradict management's assertions.
As a utility subject to cost-based rate regulation, PSE&G is required to defer the recognition of costs as a regulatory asset or recognize obligations as a regulatory liability if the rates established are designed to recover the costs and if it is probable that such rates can be charged or collected in future periods.
This accounting can result in the recognition of revenues and expenses in different time periods than that of enterprises that are not regulated.
Further, regulatory assets and other investments and costs incurred under various filings and clause mechanisms are subject to prudence reviews and can be disallowed in the future by regulatory authorities.
To the extent that collection of revenue or regulatory assets or payments of regulatory liabilities is no longer probable, the amounts would be charged or credited to income.
Significant judgment can be required to determine if
otherwise recognizable revenues and incurred costs qualify to be presented as a regulatory asset or liability.
As of December 31, 2022, PSE&G has approximately $4.8 billion and $2.6 billion recorded as regulatory assets and regulatory liabilities, respectively.
We identified the accounting for the effects of rate regulation as a critical audit matter due to the significant judgments made by management in assessing the probable recovery of regulatory assets and incurred costs or the likelihood of refunds of regulatory liabilities.
These judgments include assumptions regarding the outcome of future decisions by the BPU or FERC.
Auditing these judgments required specialized knowledge of accounting for rate regulation and the ratemaking process due to its inherent complexities.
- We tested the effectiveness of management's controls over the evaluation of the likelihood of (1) the recovery in future rates of costs deferred as regulatory assets, and (2) a refund or a future reduction in rates that should be reported as regulatory liabilities.
- We obtained and read relevant regulatory orders issued by the BPU and FERC for PSE&G and other publicly available information to assess the likelihood of recovery in future rates or of a future reduction in rates based on precedents of the treatment of similar costs under similar circumstances.
We evaluated the external information and compared it to management’s recorded regulatory asset and liability balances for completeness.
- For regulatory matters in process, we inspected associated documents and testimony filed with the BPU or FERC for any evidence that might contradict management's assertions.
| February 21, 2023 | | |
| | | | Obligation to Return Cash Collateral | | | | | | 111 | | | | | | 81 | | | | | | (21) | | | | | |
| | | | Payments for Share Repurchase Program | | | | | | (500) | | | | | | — | | | | | | — | | | | | |
| | | | Payments for Share Repurchase Program | | | | | | — | | | | | | — | | | | | | (7) | | | | | | (500) | | | | | | — | | | | | | — | | | | | | (500) | | | | | |
| | | | Balance as of December 31, 2022 | | | | | | 534 | | | | | | $ | 5,065 | | | | | (37) | | | | | | $ | (1,377) | | | | | $ | 10,591 | | | | | $ | (550) | | | | | $ | 13,729 | | | | |
| | | | Obligation to Return Cash Collateral | | | | | | 111 | | | | | | 81 | | | | | | (21) | | | | | |
| | | | Balance as of December 31, 2022 | | | | | | $ | 892 | | | | | $ | 1,170 | | | | | $ | 986 | | | | | $ | 12,639 | | | | | $ | (5) | | | | | $ | 15,682 | | | | |
Organization
Public Service Enterprise Group Incorporated (PSEG) is a public utility holding company that, acting through its wholly owned subsidiaries, is a predominantly regulated electric and gas utility and a nuclear generation business.
PSEG’s principal operating subsidiaries are:
periods.
| | | | As of December 31, 2022 | | | | | | | | | | | | | | | | | | | | |
Asset Retirement Obligations (“AROs”) - Nuclear Decommissioning- Refer to Notes 4 and 13 to the financial statements
PSEG’s wholly-owned subsidiary PSEG Power LLC (PSEG Power) owns and operates nuclear plants and has recorded associated asset retirement obligations (AROs) for their eventual decommissioning.
In estimating its AROs for the nuclear plants, PSEG Power develops probability-weighted cash flow scenarios which, on a unit-by-unit basis, consider multiple outcome scenarios that include significant estimates and assumptions, and are based on third-party decommissioning cost estimates, cost escalation rates, inflation rates, and discount rates.
Management updates its cost studies triennially unless circumstances warrant more frequent updates.
The most recent cost study was performed in 2021.
We identified nuclear decommissioning AROs as a critical audit matter because of the significant estimates and assumptions made by management and management’s specialist in determining the recorded AROs.
Auditing each of these assumptions required a high degree of auditor judgment and, for certain assumptions and cost studies, the use of environmental and fair value specialists.
How the Critical Audit Matter Was Addressed in the Audit
Our audit procedures related to the nuclear decommissioning ARO included the following, among others:
- We tested the effectiveness of controls over assumptions used in the calculation, including the evaluation of retirement date assumptions, cost estimates, and the probability weighting of the various cash flow scenarios.
- We evaluated management’s assumptions used in calculating the recorded nuclear decommissioning ARO balance including estimates of spent fuel cost reimbursements and weighted probabilities of various cash flow scenarios considering potential early retirement of the New Jersey nuclear plants and decommissioning methods.
- With the assistance of our environmental specialists and internal fair value specialists, we evaluated management’s judgments related to significant assumptions used in calculating the ARO including estimated decommissioning costs, discount rate, and inflation rate by:
◦Evaluating the experience, qualifications, and objectivity of management’s specialist;
◦Understanding the methodology used by management in developing estimates of the nuclear ARO;
◦Assessing the basis of and supporting evidence for information used in the determination of significant ARO assumptions;
◦Testing the mathematic accuracy of the models used to calculate the ARO;
- We evaluated the disclosures related to the estimated nuclear decommissioning costs, including the balances recorded.
Asset Dispositions –Sale of Fossil Assets — Refer to Note 4 to the financial statements
*Critical Audit Matter Description*
As disclosed in Note 4, in August 2021, PSEG entered into agreements to sell PSEG Power’s entire portfolio of fossil generating assets to newly formed subsidiaries of ArcLight Energy Partners Fund VII, L.P. As a result of the Board of Directors’ approval of the transactions, PSEG fossil generating assets and liabilities to be disposed were reclassified to Assets and Liabilities Held for Sale.
During 2021, PSEG recorded impairment losses of approximately $2,691 million associated with the planned disposition of the fossil assets.
We identified the accounting for the sale of the fossil assets as a critical audit matter because the transaction relates to accounts and disclosures that are material to the financial statements and the evaluation of the applicable accounting guidance was complex.
Further, auditing the transactions involved extensive audit effort, including the use of professionals with specialized skill and knowledge to assist in performing procedures related to the timing of recognition of the impairments and in the evaluation of the presentation and disclosure in the financial statements.
*How the Critical Audit Matter Was Addressed in the Audit*
- We tested the effectiveness of controls over management’s impairment tests, including considerations of asset groupings, the timing of impairment charges recorded, the significant inputs utilized to determine estimated undiscounted cash flows, and the weighted probabilities assigned to the outcome of various scenarios.
- We tested the effectiveness of controls over management’s evaluation for the accounting for sale of the assets, including considerations as to the timing of meeting the classification of assets and liabilities held for sale, the amounts recorded as assets and liabilities held for sale, impairment charges recorded, and evaluation of the presentation and disclosure in the financial statements.
- For impairment tests performed prior to the signing of the sale agreements, we evaluated the weighted probabilities assigned to the outcomes of various cash flow scenarios.
Additionally, with the assistance of our fair value specialists, we evaluated the significant inputs and assumptions utilized within management’s impairment tests, including forward power prices, fuel costs, dispatch rates and estimates of the fair value to be received upon any disposition of assets.
- We obtained and read the sale agreements and, with the assistance of professionals with specialized skills and knowledge, evaluated management’s conclusions on the accounting treatment for the sale agreements.
- We evaluated the disclosures related to the sale of fossil assets, including the balances recorded.
Through the rate-making process, PSE&G’s rates to customers also include the recovery of income tax expense associated with PSE&G’s electric and gas distribution and electric transmission operations.
PSE&G has recorded regulatory liabilities for excess accumulated deferred income taxes (ADIT) which will be refunded to customers in future periods.
PSE&G’s most recent electric and gas distribution base rate case, concluded in 2018, established the tax adjustment credit (TAC) that provides for the refund of these excess ADIT regulatory liabilities as well as the flow through to customers of historical and current accumulated deferred income taxes for tax-deductible repairs.
The flow through of the tax benefits results in lower revenues and lower income tax expense, as well as the recognition of a regulatory asset as management believes it is probable that the accumulated tax benefits treated as a flow-through item to PSE&G customers will be recovered from customers in the future.
We identified the accounting for the TAC as a critical audit matter due to the complexity in accounting for the impact of rate regulation on income tax expense.
Auditing management’s assertion that the TAC regulatory assets are probable of future recovery, and that the accounting for the TAC is accurately recorded and reported, requires auditor judgment and specialized knowledge of accounting matters specific to rate regulation.
Further, the determination of the estimated benefit of current tax-deductible repairs under the Internal Revenue Code, and the resulting impacts on the TAC regulatory asset and income tax expense recorded in the financial statements, is complex, and required a high degree of auditor judgment and the involvement of our income tax specialists.
- We evaluated management’s analysis over the assertion that the TAC regulatory assets are probable of recovery.
- We evaluated relevant regulatory orders related to the ratemaking treatment of income taxes.
- With the assistance of our income tax specialists, we tested the accuracy of income tax expense, regulatory assets and regulatory liabilities associated with the TAC.
An excerpt. Shown here: 40 of 1,180 rewritten, 40 of 392 added and 40 of 463 removed. The counts are complete. For every sentence, read Item 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA in the FY2022 filing and the FY2021 filing.
Page headers and footers: 100 lines differ, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of Contents](#i8f9ab1108fd247938596ceae8439dec7_7)
[Table of Contents](#i8f9ab1108fd247938596ceae8439dec7_7)
[Table of Contents](#i8f9ab1108fd247938596ceae8439dec7_7)
[Table of Contents](#i8f9ab1108fd247938596ceae8439dec7_7)
Shown here: 40 of 96 changed, all 0 added and all 4 removed.
Item 9. CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL DISCLOSURE
0 rewritten, 0 added, 1 removed, 1 unchanged
Read the full itemFY2022 item · filed February 22, 2023FY2021 item · filed February 24, 2022
ACCOUNTING AND FINANCIAL DISCLOSURE
Item 9A. CONTROLS AND PROCEDURES
4 rewritten, 0 added, 0 removed, 9 unchanged
Read the full itemFY2022 item · filed February 22, 2023FY2021 item · filed February 24, 2022
We have conducted assessments of our internal control over financial reporting as of December 31, [removed: 2021,] [added: 2022,] as required by Section 404 of the Sarbanes-Oxley Act, using the framework promulgated by the Committee of Sponsoring Organizations of the Treadway Commission, commonly referred to as “COSO.” Managements’ reports on PSEG’s and PSE&G’s internal control over financial reporting are included on pages [removed: 165] [added: 152] and [removed: 166,] [added: 153,] respectively.
The Independent Registered Public Accounting Firm’s report with respect to the effectiveness of PSEG’s internal control over financial reporting is included on page [removed: 167.][added: 154.]
Management has concluded that internal control over financial reporting is effective as of December 31, [removed: 2021.][added: 2022.]
There have been no changes in internal control over financial reporting that occurred during the fourth quarter of [removed: 2021] [added: 2022] that have materially affected, or are reasonably likely to materially affect, each registrant’s internal control over financial reporting.
Item 9C. DISCLOSURE REGARDING FOREIGN JURISDICTIONS THAT PREVENT INSPECTIONS
9 rewritten, 5 added, 5 removed, 44 unchanged
Read the full itemFY2022 item · filed February 22, 2023FY2021 item · filed February 24, 2022
Based on the assessment performed, management has concluded that PSEG’s internal control over financial reporting is effective and provides reasonable assurance regarding the reliability of PSEG’s financial reporting and the preparation of its financial statements as of December 31, [removed: 2021] [added: 2022] in accordance with generally accepted accounting principles.
Further, management has not identified any material weaknesses in internal control over financial reporting as of December 31, [removed: 2021.][added: 2022.]
PSEG’s external auditors, Deloitte & Touche LLP, have audited PSEG’s financial statements for the year ended December 31, [removed: 2021] [added: 2022] included in this annual report on Form 10-K and, as part of that audit, have issued a report on the effectiveness of PSEG’s internal control over financial reporting, a copy of which is included in this annual report on Form 10-K.
Based on the assessment performed, management has concluded that PSE&G’s internal control over financial reporting is effective and provides reasonable assurance regarding the reliability of PSE&G’s financial reporting and the preparation of its financial statements as of December 31, [removed: 2021] [added: 2022] in accordance with generally accepted accounting principles.
Further, management has not identified any material weaknesses in internal control over financial reporting as of December 31, [removed: 2021.][added: 2022.]
We have audited the internal control over financial reporting of Public Service Enterprise Group Incorporated and subsidiaries (the [removed: “Company”)] [added: “Company” or “PSEG”)] as of December 31, [removed: 2021,] [added: 2022,] based on criteria established in *Internal Control — Integrated Framework (2013)* issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO).
In our opinion, the Company maintained, in all material respects, effective internal control over financial reporting as of December 31, [removed: 2021,] [added: 2022,] based on criteria established in Internal Control — Integrated Framework (2013) issued by COSO.
We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States) (PCAOB), the consolidated financial statements and the consolidated financial statement schedule listed in the Index at Item 15(B)(a) as of and for the year ended December 31, [removed: 2021] [added: 2022] of the Company and our report dated February [removed: 24, 2022] [added: 21, 2023] expressed an unqualified opinion on those financial statements.
[removed: Parsippany,] [added: Morristown,] New Jersey
| /s/ RALPH A. LAROSSA | | | | | |
| February 21, 2023 | | | | | |
| /s/ RALPH A. LAROSSA | | | | | |
| February 21, 2023 | | | | | |
February 21, 2023
| /s/ RALPH IZZO | | | | | |
| February 24, 2022 | | | | | |
| /s/ RALPH IZZO | | | | | |
| February 24, 2022 | | | | | |
February 24, 2022
Page headers and footers: 4 lines differ, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
Item 10. DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE
2 rewritten, 0 added, 0 removed, 28 unchanged
Read the full itemFY2022 item · filed February 22, 2023FY2021 item · filed February 24, 2022
The information required by Item 10 of Form 10-K with respect to (i) present directors of PSEG who are nominees for election as directors at PSEG’s [removed: 2022] [added: 2023] Annual Meeting of Stockholders, (ii) the director nomination process, and (iii) the composition of the Audit Committee of the Board, is set forth under the headings “Nominees For Director-Biographical Information,” “Overview of Board Nominees-Board Refreshment and Tenure,” and “-Board Membership Selection,” and “Corporate Governance-Board Committees,” respectively, in PSEG’s definitive Proxy Statement for such Annual Meeting of Stockholders, which definitive Proxy Statement is expected to be filed with the U.S. Securities and Exchange Commission (SEC) on or about March [removed: 10, 2022] [added: 9, 2023] and which information set forth under said heading is incorporated herein by this reference thereto.
In [removed: 2021,] [added: 2022,] we did not grant any waivers to the Standards.
Page headers and footers: 1 line differs, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
Item 11. EXECUTIVE COMPENSATION
1 rewritten, 0 added, 0 removed, 3 unchanged
Read the full itemFY2022 item · filed February 22, 2023FY2021 item · filed February 24, 2022
The information required by Item 11 of Form 10-K is set forth in PSEG’s definitive Proxy Statement for the [removed: 2022] [added: 2023] Annual Meeting of Stockholders which definitive Proxy Statement is expected to be filed with the SEC on or about March [removed: 10, 2022] [added: 9, 2023] and such information [added: that is responsive to this Item 11, except for information] set forth under [removed: such] [added: the] heading [added: “Pay Versus Performance,”] is incorporated herein by this reference thereto.
Item 12. SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS
1 rewritten, 0 added, 0 removed, 6 unchanged
Read the full itemFY2022 item · filed February 22, 2023FY2021 item · filed February 24, 2022
The information required by Item 12 of Form 10-K with respect to directors, executive officers and certain beneficial owners is set forth under the heading “Security Ownership of Directors, Management and Certain Beneficial Owners” in PSEG’s definitive Proxy Statement for the [removed: 2022] [added: 2023] Annual Meeting of Stockholders which definitive Proxy Statement is expected to be filed with the SEC on or about March [removed: 10, 2022] [added: 9, 2023] and such information set forth under such heading is incorporated herein by this reference thereto.
Item 13. CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND
1 rewritten, 0 added, 0 removed, 4 unchanged
Read the full itemFY2022 item · filed February 22, 2023FY2021 item · filed February 24, 2022
The information required by Item 13 of Form 10-K is set forth under the heading “Corporate Governance-Certain Relationships and Related Person Transactions” in PSEG’s definitive Proxy Statement for the [removed: 2022] [added: 2023] Annual Meeting of Stockholders which definitive Proxy Statement is expected to be filed with the SEC on or about March [removed: 10, 2022] [added: 9, 2023] and such information set forth under such heading is incorporated herein by this reference thereto.
Item 14. PRINCIPAL ACCOUNTANT FEES AND SERVICES
1 rewritten, 0 added, 0 removed, 2 unchanged
Read the full itemFY2022 item · filed February 22, 2023FY2021 item · filed February 24, 2022
The information required by Item 14 of Form 10-K is set forth under the heading “Oversight of the Independent Auditor-Fees Billed by Deloitte for [removed: 2021] [added: 2022] and [removed: 2020”] [added: 2021”] in PSEG’s definitive Proxy Statement for the [removed: 2022] [added: 2023] Annual Meeting of Stockholders which definitive Proxy Statement is expected to be filed with the SEC on or about March [removed: 10, 2022.][added: 9, 2023.]
Page headers and footers: 1 line differs, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
Item 15. EXHIBITS, FINANCIAL STATEMENT SCHEDULES
133 rewritten, 15 added, 10 removed, 117 unchanged
Read the full itemFY2022 item · filed February 22, 2023FY2021 item · filed February 24, 2022
a.Public Service Enterprise Group Incorporated’s Consolidated Balance Sheets as of December 31, [removed: 2021] [added: 2022] and [removed: 2020] [added: 2021] and the related Consolidated Statements of Operations, Comprehensive Income, Cash Flows and Stockholders’ Equity for the three years ended December 31, [removed: 2021] [added: 2022] on pages [removed: 70] [added: 60] through [removed: 75.][added: 65.]
b.Public Service Electric and Gas Company’s Consolidated Balance Sheets as of December 31, [removed: 2021] [added: 2022] and [removed: 2020] [added: 2021] and the related Consolidated Statements of Operations, Comprehensive Income, Cash Flows and Common Stockholder’s Equity for the three years ended December 31, [removed: 2021] [added: 2022] on pages [removed: 76] [added: 66] through [removed: 81.][added: 71.]
Schedule II—Valuation and Qualifying Accounts for each of the three years in the period ended December 31, [removed: 2021] [added: 2022] (page [removed: 175).][added: 162).]
Schedule II—Valuation and Qualifying Accounts for each of the three years in the period ended December 31, [removed: 2021] [added: 2022] (page [removed: 175).][added: 162).]
| [removed: [3d](http://www.sec.gov/Archives/edgar/data/788784/000119312515404982/d44592dex991.htm)] [added: [3d](http://www.sec.gov/Archives/edgar/data/788784/000119312523042013/d469440dex31.htm)] | | | | | | [By-Laws of Public Service Enterprise Group Incorporated [removed: effective December 15, 2015](http://www.sec.gov/Archives/edgar/data/788784/000119312515404982/d44592dex991.htm)(4)] [added: effective](http://www.sec.gov/Archives/edgar/data/788784/000119312523042013/d469440dex31.htm) [February 14, 2023](http://www.sec.gov/Archives/edgar/data/788784/000119312523042013/d469440dex31.htm)(4)] | | |
| [removed: [10a(6)](http://www.sec.gov/Archives/edgar/data/81033/000093041309001045/c56713_ex10a11.htm)] [added: [10a(6)](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex10a6micp2022.htm)] | | | | | | [removed: [Senior Management] [added: [Management] Incentive Compensation [removed: Plan](http://www.sec.gov/Archives/edgar/data/81033/000093041309001045/c56713_ex10a11.htm)(13)] [added: Plan](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex10a6micp2022.htm)] | | |
| [removed: [10a(7)](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex101keyexecutiveseverance.htm)] [added: [10a(7)](http://www.sec.gov/Archives/edgar/data/788784/000119312522200082/d841106dex101.htm)] | | | | | | [Key Executive Severance Plan of Public Service Enterprise Group Incorporated, amended [removed: effective](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex101keyexecutiveseverance.htm) [Ju](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex101keyexecutiveseverance.htm)[ne](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex101keyexecutiveseverance.htm) [](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex101keyexecutiveseverance.htm)[30](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex101keyexecutiveseverance.htm)[,](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex101keyexecutiveseverance.htm) [20](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex101keyexecutiveseverance.htm)[21](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex101keyexecutiveseverance.htm)(14)] [added: effective Ju](http://www.sec.gov/Archives/edgar/data/788784/000119312522200082/d841106dex101.htm)[ly](http://www.sec.gov/Archives/edgar/data/788784/000119312522200082/d841106dex101.htm) [](http://www.sec.gov/Archives/edgar/data/788784/000119312522200082/d841106dex101.htm)[18](http://www.sec.gov/Archives/edgar/data/788784/000119312522200082/d841106dex101.htm)[, 202](http://www.sec.gov/Archives/edgar/data/788784/000119312522200082/d841106dex101.htm)[2](http://www.sec.gov/Archives/edgar/data/788784/000119312522200082/d841106dex101.htm) [](http://www.sec.gov/Archives/edgar/data/788784/000119312522200082/d841106dex101.htm) [(1](http://www.sec.gov/Archives/edgar/data/788784/000119312522200082/d841106dex101.htm)[3](http://www.sec.gov/Archives/edgar/data/788784/000119312522200082/d841106dex101.htm)[)](http://www.sec.gov/Archives/edgar/data/788784/000119312522200082/d841106dex101.htm)] | | |
| [removed: [10a(8)](http://www.sec.gov/Archives/edgar/data/81033/000093041308007334/c56057_ex99.htm)] [added: [10a(8)](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex101.htm)] | | | | | | [removed: [Severance Agreement] [added: [Agreement] with Ralph Izzo [removed: dated December 16, 2008](http://www.sec.gov/Archives/edgar/data/81033/000093041308007334/c56057_ex99.htm)(15)] [added: dated](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex101.htm) [April 18, 2022](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex101.htm)[(](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex101.htm)[14](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex101.htm)[)](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex101.htm)] | | |
| [10a(9)](http://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a17.txt) | | | | | | [Stock Plan for Outside Directors, as [removed: amended](http://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a17.txt)(16)] [added: amended](http://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a17.txt)(15)] | | |
| [10a(10)](http://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a20.txt) | | | | | | [Compensation Plan for Outside [removed: Directors](http://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a20.txt)(17)] [added: Directors](http://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a20.txt)(16)] | | |
| [10a(11)](http://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm) | | | | | | [removed: [20](http://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm)[04](http://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm) [Long-Term] [added: [2004 Long-Term] Incentive [removed: Plan,](http://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm) [amende](http://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm)[d](http://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm) [and restate](http://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm)[d] [added: Plan, amended and restated] as [removed: of](http://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm) [A](http://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm)[pril 16,2013](http://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm)(18)] [added: of April 16,](http://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm) [](http://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm)[2013](http://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm)(17)] | | |
| [10a(12)](http://www.sec.gov/Archives/edgar/data/81033/000093041309000939/c56702_ex10-1.htm) | | | | | | [Form of Agreement for Advancement of Expenses with Outside [removed: Directors](http://www.sec.gov/Archives/edgar/data/81033/000093041309000939/c56702_ex10-1.htm)(19)] [added: Directors](http://www.sec.gov/Archives/edgar/data/81033/000093041309000939/c56702_ex10-1.htm)(18)] | | |
| [removed: [10a(13)](http://www.sec.gov/Archives/edgar/data/788784/000162828021021195/ex10equitydeferralplan.htm)] [added: [10a(13)](http://www.sec.gov/Archives/edgar/data/788784/000162828022027422/ex10equitydeferralplanamen.htm)] | | | | | | [Equity Deferral [removed: Plan,](http://www.sec.gov/Archives/edgar/data/788784/000162828021021195/ex10equitydeferralplan.htm) [amended](http://www.sec.gov/Archives/edgar/data/788784/000162828021021195/ex10equitydeferralplan.htm) [effective](http://www.sec.gov/Archives/edgar/data/788784/000162828021021195/ex10equitydeferralplan.htm) [Oct](http://www.sec.gov/Archives/edgar/data/788784/000162828021021195/ex10equitydeferralplan.htm)[ober 21, 2021](http://www.sec.gov/Archives/edgar/data/788784/000162828021021195/ex10equitydeferralplan.htm)(20)] [added: Plan, amended effective October 19, 2022](http://www.sec.gov/Archives/edgar/data/788784/000162828022027422/ex10equitydeferralplanamen.htm) [(](http://www.sec.gov/Archives/edgar/data/788784/000162828022027422/ex10equitydeferralplanamen.htm)[19](http://www.sec.gov/Archives/edgar/data/788784/000162828022027422/ex10equitydeferralplanamen.htm)[)](http://www.sec.gov/Archives/edgar/data/788784/000162828022027422/ex10equitydeferralplanamen.htm)] | | |
| [10a(14)](http://www.sec.gov/Archives/edgar/data/81033/000078878415000002/pseg-12312014xq4ex10a.htm) | | | | | | [Agreement with Tamara L. Linde dated June 18, [removed: 2014](http://www.sec.gov/Archives/edgar/data/81033/000078878415000002/pseg-12312014xq4ex10a.htm)(21)] [added: 2014](http://www.sec.gov/Archives/edgar/data/81033/000078878415000002/pseg-12312014xq4ex10a.htm)(20)] | | |
| [10a(15)](http://www.sec.gov/Archives/edgar/data/81033/000078878415000011/pseg-9302015xq3ex10.htm) | | | | | | [Agreement with Daniel J. Cregg dated September 22, [removed: 2015](http://www.sec.gov/Archives/edgar/data/81033/000078878415000011/pseg-9302015xq3ex10.htm)(22)] [added: 2015](http://www.sec.gov/Archives/edgar/data/81033/000078878415000011/pseg-9302015xq3ex10.htm)(21)] | | |
| [10a(16)](http://www.sec.gov/Archives/edgar/data/81033/000078878418000004/ex10a20clawbackpractice.htm) | | | | | | [Clawback Practice, effective February 20, [removed: 2018](http://www.sec.gov/Archives/edgar/data/81033/000078878418000004/ex10a20clawbackpractice.htm)(23)] [added: 2018](http://www.sec.gov/Archives/edgar/data/81033/000078878418000004/ex10a20clawbackpractice.htm)(22)] | | |
| [removed: [10a(17)](http://www.sec.gov/Archives/edgar/data/81033/000078878420000004/ex-10a19larossaagreeme.htm)] [added: [4a(14)](http://www.sec.gov/Archives/edgar/data/81033/000078878420000004/ex-4a15xsuppindentures.htm)] | | | | | | [removed: [Agreement with Ralph A. LaRossa dated December 16, 2019](http://www.sec.gov/Archives/edgar/data/81033/000078878420000004/ex-10a19larossaagreeme.htm)(24)] [added: [December 1, 2019](http://www.sec.gov/Archives/edgar/data/81033/000078878420000004/ex-4a15xsuppindentures.htm)[(](http://www.sec.gov/Archives/edgar/data/81033/000078878420000004/ex-4a15xsuppindentures.htm)[4](http://www.sec.gov/Archives/edgar/data/81033/000078878420000004/ex-4a15xsuppindentures.htm)[6](http://www.sec.gov/Archives/edgar/data/81033/000078878420000004/ex-4a15xsuppindentures.htm)[)](http://www.sec.gov/Archives/edgar/data/81033/000078878420000004/ex-4a15xsuppindentures.htm)] | | |
| [10a(18)](http://www.sec.gov/Archives/edgar/data/788784/000119312521126797/d162501dex991.htm) | | | | | | [2021 Long-Term Incentive Plan, effective April 20, [removed: 2021](https://www.sec.gov/Archives/edgar/data/788784/000119312521126797/d162501dex991.htm)(25)] [added: 202](https://www.sec.gov/Archives/edgar/data/788784/000119312521126797/d162501dex991.htm)[1](https://www.sec.gov/Archives/edgar/data/788784/000119312521126797/d162501dex991.htm)(24)] | | |
| [10a(19)](http://www.sec.gov/Archives/edgar/data/788784/000119312521129266/d162521dex46.htm) | | | | | | [2021 Equity Compensation Plan for Outside Directors, effective April 20, [removed: 2021](http://www.sec.gov/Archives/edgar/data/788784/000119312521129266/d162521dex46.htm)[(26)](http://www.sec.gov/Archives/edgar/data/788784/000119312521129266/d162521dex46.htm)[](http://www.sec.gov/Archives/edgar/data/788784/000119312521129266/d162521dex46.htm)] [added: 2021](http://www.sec.gov/Archives/edgar/data/788784/000119312521129266/d162521dex46.htm)[(](http://www.sec.gov/Archives/edgar/data/788784/000119312521129266/d162521dex46.htm)[2](http://www.sec.gov/Archives/edgar/data/788784/000119312521129266/d162521dex46.htm)[5](http://www.sec.gov/Archives/edgar/data/788784/000119312521129266/d162521dex46.htm)[)](http://www.sec.gov/Archives/edgar/data/788784/000119312521129266/d162521dex46.htm)[](http://www.sec.gov/Archives/edgar/data/788784/000119312521129266/d162521dex46.htm)] | | |
| [10a(20)](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex104hanemannagreement.htm) | | | | | | [Agreement with Kim C. Hanemann dated May 21, [removed: 2021](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex104hanemannagreement.htm)[(27)](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex104hanemannagreement.htm)] [added: 2021](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex104hanemannagreement.htm)[(](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex104hanemannagreement.htm)[2](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex104hanemannagreement.htm)[6](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex104hanemannagreement.htm)[)](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex104hanemannagreement.htm)] | | |
| [removed: [10a(](https://www.sec.gov/Archives/edgar/data/788784/000162828022003860/ex10a21dalyagreement.htm)[21](https://www.sec.gov/Archives/edgar/data/788784/000162828022003860/ex10a21dalyagreement.htm)[)](https://www.sec.gov/Archives/edgar/data/788784/000162828022003860/ex10a21dalyagreement.htm)] [added: [10a(21)](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex10a21ericcarragreement.htm)] | | | | | | [Agreement with [removed: David M. Daly dated](https://www.sec.gov/Archives/edgar/data/788784/000162828022003860/ex10a21dalyagreement.htm) [Jan](https://www.sec.gov/Archives/edgar/data/788784/000162828022003860/ex10a21dalyagreement.htm)[uary 3](https://www.sec.gov/Archives/edgar/data/788784/000162828022003860/ex10a21dalyagreement.htm)[, 202](https://www.sec.gov/Archives/edgar/data/788784/000162828022003860/ex10a21dalyagreement.htm)[2](https://www.sec.gov/Archives/edgar/data/788784/000162828022003860/ex10a21dalyagreement.htm)] [added: Eric Carr dated July 15, 2019](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex10a21ericcarragreement.htm)] | | |
| [removed: [21](https://www.sec.gov/Archives/edgar/data/788784/000162828022003860/ex21-12312021.htm)] [added: [21](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex21-12312022.htm)] | | | | | | [Subsidiaries of the [removed: Registrant](https://www.sec.gov/Archives/edgar/data/788784/000162828022003860/ex21-12312021.htm)] [added: Registrant](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex21-12312022.htm)] | | |
| [removed: [23](https://www.sec.gov/Archives/edgar/data/788784/000162828022003860/ex23-12312021.htm)] [added: [23](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex23-12312022.htm)] | | | | | | [Consent of Independent Registered Public Accounting [removed: Firm](https://www.sec.gov/Archives/edgar/data/788784/000162828022003860/ex23-12312021.htm)] [added: Firm](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex23-12312022.htm)] | | |
| [removed: [31](https://www.sec.gov/Archives/edgar/data/788784/000162828022003860/ex31-12312021.htm)] [added: [31](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex31-12312022.htm)] | | | | | | [Certification by [removed: Ralph Izzo,] [added: Ralph](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex31-12312022.htm) [A.](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex31-12312022.htm) [](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex31-12312022.htm)[L](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex31-12312022.htm)[aRossa](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex31-12312022.htm)[,] pursuant to Rules 13a-14 and 15d-14 of the Securities Exchange Act of 1934 (1934 [removed: Act)](https://www.sec.gov/Archives/edgar/data/788784/000162828022003860/ex31-12312021.htm)] [added: Act)](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex31-12312022.htm)] | | |
| [removed: [31a](https://www.sec.gov/Archives/edgar/data/788784/000162828022003860/ex31a-12312021.htm)] [added: [31a](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex31a-12312022.htm)] | | | | | | [Certification by Daniel J. Cregg, pursuant to Rules 13a-14 and 15d-14 of the 1934 [removed: Act](https://www.sec.gov/Archives/edgar/data/788784/000162828022003860/ex31a-12312021.htm)] [added: Act](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex31a-12312022.htm)] | | |
| [removed: [32](https://www.sec.gov/Archives/edgar/data/788784/000162828022003860/ex32-12312021.htm)] [added: [32](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex32-12312022.htm)] | | | | | | [Certification by [removed: Ralph Izzo,] [added: Ralph](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex32-12312022.htm) [A.](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex32-12312022.htm) [](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex32-12312022.htm)[LaRossa](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex32-12312022.htm)[,] pursuant to Section 1350 of Chapter 63 of Title 18 of the U.S. [removed: Code](https://www.sec.gov/Archives/edgar/data/788784/000162828022003860/ex32-12312021.htm)] [added: Code](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex32-12312022.htm)] | | |
| [removed: [32a](https://www.sec.gov/Archives/edgar/data/788784/000162828022003860/ex32a-12312021.htm)] [added: [32a](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex32a-12312022.htm)] | | | | | | [Certification by Daniel J. Cregg, pursuant to Section 1350 of Chapter 63 of Title 18 of the U.S. [removed: Code](https://www.sec.gov/Archives/edgar/data/788784/000162828022003860/ex32a-12312021.htm)] [added: Code](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex32a-12312022.htm)] | | |
| [3a(1)](http://www.sec.gov/Archives/edgar/data/81033/0000081033-94-000007.txt) | | | | | | [Restated Certificate of Incorporation of [removed: PSE&G](http://www.sec.gov/Archives/edgar/data/81033/0000081033-94-000007.txt)(28)] [added: PSE&G](http://www.sec.gov/Archives/edgar/data/81033/0000081033-94-000007.txt)(27)] | | |
| [3a(2)](http://www.sec.gov/Archives/edgar/data/81033/0000081033-94-000007.txt) | | | | | | [Certificate of Amendment of Certificate of Restated Certificate of Incorporation of PSE&G filed February 18, 1987 with the State of New Jersey adopting limitations of liability provisions in accordance with an amendment to New Jersey Business Corporation [removed: Act](http://www.sec.gov/Archives/edgar/data/81033/0000081033-94-000007.txt)(29)] [added: Act](http://www.sec.gov/Archives/edgar/data/81033/0000081033-94-000007.txt)(28)] | | |
| [3a(3)](http://www.sec.gov/Archives/edgar/data/81033/0000081033-94-000007.txt) | | | | | | [Certificate of Amendment of Restated Certificate of Incorporation of PSE&G filed June 17, 1992 with the State of New Jersey, establishing the 7.44% Cumulative Preferred Stock ($100 Par) as a series of Preferred [removed: Stock](http://www.sec.gov/Archives/edgar/data/81033/0000081033-94-000007.txt)(30)] [added: Stock](http://www.sec.gov/Archives/edgar/data/81033/0000081033-94-000007.txt)(29)] | | |
| [3a(4)](http://www.sec.gov/Archives/edgar/data/81033/0000081033-94-000007.txt) | | | | | | [Certificate of Amendment of Restated Certificate of Incorporation of PSE&G filed March 11, 1993 with the State of New Jersey, establishing the 5.97% Cumulative Preferred Stock ($100 Par) as a series of Preferred [removed: Stock](http://www.sec.gov/Archives/edgar/data/81033/0000081033-94-000007.txt)(31)] [added: Stock](http://www.sec.gov/Archives/edgar/data/81033/0000081033-94-000007.txt)(30)] | | |
| [3a(5)](http://www.sec.gov/Archives/edgar/data/81033/0000081033-94-000007.txt) | | | | | | [Certificate of Amendment of Restated Certificate of Incorporation of PSE&G filed January 27, 1994 with the State of New Jersey, establishing the 6.92% Cumulative Preferred Stock ($100 Par) and the 6.75% Cumulative Preferred Stock ($25 Par) as a series of Preferred [removed: Stock](http://www.sec.gov/Archives/edgar/data/81033/0000081033-94-000007.txt)(32)] [added: Stock](http://www.sec.gov/Archives/edgar/data/81033/0000081033-94-000007.txt)(31)] | | |
| [3b(1)](http://www.sec.gov/Archives/edgar/data/81033/000093041307004140/ex_3-3.txt) | | | | | | [By-Laws of PSE&G as in effect April 17, [removed: 2007](http://www.sec.gov/Archives/edgar/data/81033/000093041307004140/ex_3-3.txt)(33)] [added: 2007](http://www.sec.gov/Archives/edgar/data/81033/000093041307004140/ex_3-3.txt)(32)] | | |
| 4a(1) | | | | | | Indenture between PSE&G and Fidelity Union Trust Company (now, Wachovia Bank, National Association), as Trustee, dated August 1, [removed: 1924(34),] [added: 1924(33),] securing First and Refunding Mortgage Bond and Supplemental Indentures between PSE&G and U.S. Bank National Association, successor, as Trustee, supplemental to Exhibit 4a(1), dated as follows: | | |
| 4a(2) | | | | | | June 1, [removed: 1937(35)] [added: 1937(34)] | | |
| 4a(3) | | | | | | July 1, [removed: 1937(36)] [added: 1937(35)] | | |
| 4a(4) | | | | | | June 1, 1991 (No. [removed: 1)(37)] [added: 1)(36)] | | |
| [4a(5)](http://www.sec.gov/Archives/edgar/data/81033/000095011705000790/ex4a28.txt) | | | | | | [August 1, 2004 (No. [removed: 4)](http://www.sec.gov/Archives/edgar/data/81033/000095011705000790/ex4a28.txt)(38)] [added: 4)](http://www.sec.gov/Archives/edgar/data/81033/000095011705000790/ex4a28.txt)(37)] | | |
| [4a(6)](http://www.sec.gov/Archives/edgar/data/81033/000093041308001260/c52299_ex4a-28.htm) | | | | | | [April 1, [removed: 2007](http://www.sec.gov/Archives/edgar/data/81033/000093041308001260/c52299_ex4a-28.htm)(39)] [added: 2007](http://www.sec.gov/Archives/edgar/data/81033/000093041308001260/c52299_ex4a-28.htm)(38)] | | |
| [4a(7)](http://www.sec.gov/Archives/edgar/data/81033/000119312510040508/dex4a30.htm) | | | | | | [November 1, [removed: 2009](http://www.sec.gov/Archives/edgar/data/81033/000119312510040508/dex4a30.htm)(40)] [added: 2009](http://www.sec.gov/Archives/edgar/data/81033/000119312510040508/dex4a30.htm)(39)] | | |
| [10a(8)](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex101.htm) | | | | | | [Agree](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex101.htm)[ment wi](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex101.htm)[th Ralph Izzo](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex101.htm) [dated April 18, 2022](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex101.htm) [(1](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex101.htm)[4](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex101.htm)[)](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex101.htm) | | |
| [4a(15)](http://www.sec.gov/Archives/edgar/data/788784/000162828022012019/ex4a15-suppind.htm) | | | | | | [March 1, 2022](http://www.sec.gov/Archives/edgar/data/788784/000162828022012019/ex4a15-suppind.htm)[(4](http://www.sec.gov/Archives/edgar/data/788784/000162828022012019/ex4a15-suppind.htm)[7](http://www.sec.gov/Archives/edgar/data/788784/000162828022012019/ex4a15-suppind.htm)[)](http://www.sec.gov/Archives/edgar/data/788784/000162828022012019/ex4a15-suppind.htm) | | |
| [10a(6)](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex10a6micp2022.htm) | | | | | | [M](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex10a6micp2022.htm)[anagement Incentive Compensation Plan](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex10a6micp2022.htm) | | |
| | | | 2022 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
Note 1.
| | | | 2022 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
Note 1.
| | | | | | | By: | | | /s/ RALPH A. LAROSSA | | |
| | | | | | | | | | Ralph A. LaRossa | | |
| /s/ JAMIE M. GENTOSO | | | | | | Director | | | | | | February 21, 2023 | | |
| Jamie M. Gentoso | | | | | | | | | | | | | | |
| /s/ VALERIE A. SMITH | | | | | | Director | | | | | | February 21, 2023 | | |
| Valerie A. Smith | | | | | | | | | | | | | | |
| /s/ ALFRED W. ZOLLAR | | | | | | Director | | | | | | February 21, 2023 | | |
| Alfred W. Zollar | | | | | | | | | | | | | | |
| [4a(14)](http://www.sec.gov/Archives/edgar/data/81033/000078878420000004/ex-4a15xsuppindentures.htm) | | | | | | [December 1, 2019](http://www.sec.gov/Archives/edgar/data/81033/000078878420000004/ex-4a15xsuppindentures.htm)[(4](http://www.sec.gov/Archives/edgar/data/81033/000078878420000004/ex-4a15xsuppindentures.htm)[7](http://www.sec.gov/Archives/edgar/data/81033/000078878420000004/ex-4a15xsuppindentures.htm)[)](http://www.sec.gov/Archives/edgar/data/81033/000078878420000004/ex-4a15xsuppindentures.htm) | | |
| [10a(19)](http://www.sec.gov/Archives/edgar/data/788784/000119312521129266/d162521dex46.htm) | | | | | | [2021 Equity Compensation Plan for Outside Directors, effective April 20, 2021](http://www.sec.gov/Archives/edgar/data/788784/000119312521129266/d162521dex46.htm)[(26)](http://www.sec.gov/Archives/edgar/data/788784/000119312521129266/d162521dex46.htm) | | |
| | | | 2019 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| | | | 2019 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| | | | | | | By: | | | /s/ RALPH IZZO | | |
| | | | | | | | | | Ralph Izzo | | |
| /s/ SHIRLEY ANN JACKSON | | | | | | Director | | | | | | February 24, 2022 | | |
| Shirley Ann Jackson | | | | | | | | | | | | | | |
| /s/ SHIRLEY ANN JACKSON | | | | | | Director | | | | | | February 24, 2022 | | |
| Shirley Ann Jackson | | | | | | | | | | | | | | |
An excerpt. Shown here: 40 of 133 rewritten, all 15 added and all 10 removed. The counts are complete. For every sentence, read Item 15. EXHIBITS, FINANCIAL STATEMENT SCHEDULES in the FY2022 filing and the FY2021 filing.
Page headers and footers: 7 lines differ, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]
[Table of [removed: Contents](#i8f9ab1108fd247938596ceae8439dec7_7)][added: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)]