Public Service Enterprise Group (PEG) 10-K risk factor changes: FY2023 vs FY2022
The 2023-12-31 10-K against the 2022-12-31 one, compared heading by heading and sentence by sentence.
Item 1A86 rewritten56 added46 removed284 unchanged
All filing items1,843 rewritten724 added913 removed3,099 unchanged
Sentence counts leave out repeated page headers and footers. 170 of those lines differ and are listed apart under each item.
Summary
counted, not written
- Item 1A lists 27 risk factor headings: 2 new, 7 reworded and 18 unchanged since FY2022. 2 headings from FY2022 no longer appear.
- Sentence by sentence, 724 added, 913 removed, 1,843 rewritten and 3,099 unchanged across 19 items that differ.
- Not counted above: 170 repeated page header or footer lines also differ. They are listed apart under each item.
- New this year: Item 1C. CYBERSECURITY.
New Item 1A headings (2)
- If we are unable to extend certain significant contracts on terms acceptable to us, this may negatively affect our financial condition and operating results
- Artificial Intelligence is an emerging area of technology that has the potential to impact various aspects of our business operations and customer interactions.AI
Removed Item 1A headings (2)
- Our financial condition and results of operations could be adversely affected by the coronavirus pandemic.
- Certain of our generation facilities rely on transmission facilities that we do not own or control and that may be subject to transmission constraints. Transmission facility owners’ inability to maintain adequate transmission capacity could restrict our ability to deliver wholesale electric power to our customers and we may either incur additional costs or forgo revenues.
Reworded Item 1A headings (7)
- Inability to successfully develop, obtain regulatory approval for, or construct T&D, and
[removed: other][added: our nuclear] generation projects could adversely impact our businesses. - We may be adversely affected by asset and equipment failures, [added: accidents,] critical operating technology or business system failures,
[removed: accidents,]natural disasters, severe weather events, acts of war or terrorism or other acts of violence, sabotage, physical attacks or security breaches, cyberattacks, or other incidents, including pandemics such as the coronavirus pandemic, that impact our ability to provide safe and reliable service to our customers and remain competitive and could result in substantial financial losses. - A material shift away from natural gas toward increased electrification and a reduction in the use of natural gas as a result of
[removed: economic]decarbonization measures could adversely impact our[removed: business.][added: gas business and ability to execute on our overall PSE&G business strategy.] - We may be unable to obtain an adequate [added: nuclear] fuel supply in the future.
- There may be periods when PSEG Power generation
[removed: output]may not [added: operate and/or may not] be able to meet its commitments under forward sale obligations and PJM rules at a reasonable cost or at all. - PSE&G’s proposed investment [added: projects or] programs may not be fully approved by
[removed: regulators, which could result in lower than desired service levels to customers,][added: regulators] and actual capital investment by PSE&G may be lower than planned, which would cause lower than anticipated rate base. - The markets, PTC and/or ZEC program may not provide sufficient
[removed: revenue][added: financial support] for our New Jersey nuclear plants[removed: or the PTC and/or ZEC program could be materially adversely modified through legal proceedings, either of]which could result in the retirement of all of these nuclear plants.
A heading is new when no FY2022 heading matches it after ignoring case and punctuation, and reworded when it shares at least 60 percent of its words with one that went away. All current risk factor headings.
Sentences by item
23 items, with every count and a link to each item that changed
Underlined words on a shaded ground are new in FY2023; struck-through words were in FY2022. Sentences that are wholly new or wholly gone are labelled rather than marked.
Item 1A. RISK FACTORS
86 rewritten, 56 added, 46 removed, 284 unchanged
Read the full itemFY2023 item · filed February 26, 2024FY2022 item · filed February 22, 2023
Inability to successfully develop, obtain regulatory approval for, or construct T&D, and [removed: other] [added: our nuclear] generation projects could adversely impact our businesses.
Our business plan calls for extensive investment in capital improvements and additions, including the construction of T&D facilities, modernizing [added: and expanding] existing infrastructure pursuant to investment programs that provide for current recovery in rates, and our CEF programs, which include providing incentives for customers to install high-efficiency equipment at their premises, constructing EV infrastructure, and implementing our smart meter program.
- ensure that contracting parties, including suppliers, perform under their contracts in a timely and [removed: cost effective] [added: cost-effective] manner; and
[removed: Any] [added: Failure to obtain regulatory or other approvals,] delays, cost escalations or otherwise unsuccessful construction and development could materially affect our financial position, results of operations and cash flows.
Any of these risks could cause [added: the amounts of] our [added: investments and/or our] return on these investments to be lower than [removed: expected or they could cause these facilities to operate below intended targets,] [added: expected,] which could adversely impact our financial condition and results of operations through [removed: lost revenue] [added: lower investment opportunities] and/or [removed: increased expenses.][added: lower returns.]
While the CIP protects [added: PSE&G’s] margin variances against changes in customer usage of gas and electricity, customer demand for natural gas could decrease as a result of changing customer preferences favoring electrification and advanced technologies that offer energy efficient options.
Electric usage could also be impacted by greater adoption of EVs, installation of distributed energy resources, such as behind the meter solar, [removed: installation of]
[added: installation of] more energy efficient equipment, flexible load and/or energy storage, and other advances in technology.
Severe weather or acts of nature, including hurricanes, winter storms, earthquakes, [removed: floods] [added: floods, wildfires] and other natural disasters can stress systems, disrupt operation of our facilities and cause service outages, [removed: production delays] and property damage that require incurring additional expenses.
Increased regulation of GHG emissions could impose significant additional costs on our electric and natural gas operations, [added: our suppliers] and [added: ultimately,] our [removed: suppliers.][added: customers.]
If our regulators do not allow us to recover all or a part of the cost of capital investment or the O&M costs incurred to comply [added: with] increasingly rigorous regulatory mandates, it could have a material adverse effect on our results of operations, financial condition or cash flows.
We may be subject to climate change lawsuits that may seek injunctive relief, monetary compensation, [added: penalties,] and punitive damages, including but not limited to, for liabilities for [removed: personal injuries and property damage] [added: damages related to mitigate harm] caused by climate change.
Further, our business is subject to policy, regulatory, technology and economic uncertainties and contingencies, including regulatory approvals required for various of our clean energy initiatives, many of which are beyond our control and may affect our ability to implement our clean energy strategy and initiatives and achieve our goal of net zero GHG emissions by [removed: 2030,] [added: 2030 for Scopes 1 and 2 emissions,] or other GHG emissions reduction or climate-related goals that we may set from time to time, in a cost-effective manner or at all.
We may be adversely affected by asset and equipment failures, [added: accidents,] critical operating technology or business system failures, [removed: accidents,] natural disasters, severe weather events, acts of war or terrorism or other acts of violence, sabotage, physical attacks or security breaches, cyberattacks, or other incidents, including pandemics such as the coronavirus pandemic, that impact our ability to provide safe and reliable service to our customers and remain competitive and could result in substantial financial losses.
We are exposed to the risk of asset and equipment failures, gas explosions, accidents, natural disasters, severe weather events, acts of war or terrorism or other acts of violence, including active shooter [removed: situations (such as the shooting incident involving an employee and a former employee which occurred in February 2023 outside of a PSE&G field facility in Somerset County, New Jersey),] [added: situations,] sabotage, physical attacks or security [removed: breaches (as have been experienced recently by certain other utilities),] [added: breaches,] cyberattacks or other incidents, which could result in damage to or destruction of our substations or other facilities or infrastructure, or damage to persons or property and to electric and gas supply interruptions.
[added: There is no] guarantee that we will have continued access to mutual aid as the utility industry consolidates and the frequency of severe weather events rises.
We are also exposed to the risk of pandemics, such as the coronavirus pandemic, which could result in service disruptions and [removed: delay] [added: delays] or otherwise impair our ability to timely provide service to our customers or complete our investment projects.
These events could result in increased political, economic, financial and insurance market [removed: instability] [added: instability, a lack of available insurance] and volatility in power and fuel markets, which could materially adversely affect our business and results of operations, including our ability to access capital on terms and conditions acceptable to us.
Any of the issues described above, if experienced at our [removed: facilities,] [added: facilities] or [added: otherwise in our business, or] by others in our industry, could adversely impact our revenues; increase costs to repair and maintain our systems; subject us to potential litigation and/or damage claims, fines or penalties; and increase the level of oversight of our utility and generation operations and infrastructure through investigations or through the imposition of additional regulatory or legislative requirements.
Long-lived assets represent approximately [removed: 74%] [added: 75%] and 82% of the total assets of PSEG and PSE&G, respectively, as of December 31, [removed: 2022.][added: 2023.]
Management evaluates long-lived assets for impairment whenever events or changes in circumstances, such as significant adverse changes in regulation, including a disallowance of certain costs, [added: a potential sale or disposition of an asset significantly before the end of its useful life,] business climate or market conditions, including prolonged periods of adverse commodity and capacity prices, could potentially indicate an asset’s or group of assets’ carrying amount may not be recoverable.
Cybersecurity threats to the energy market infrastructure are increasing in sophistication, magnitude and frequency, particularly [removed: since the coronavirus pandemic and] [added: with] the [removed: resulting shift to] [added: regularity of] virtual [removed: operations began.][added: operations.]
[removed: While there has been no material impact on our business or operations from these attacks to date,] [added: However,] we may be unable to prevent all such attacks in the future from having such a material impact as such attacks continue to increase in sophistication and frequency.
Moreover, new or updated security laws or [added: regulations, including laws and] regulations [added: that respond to evolving application of AI,] or unforeseen threat sources could require changes in current measures taken by us and our business operations, which could result in increased costs and [removed: adversely affect our financial statements.]
For a discussion of state and federal cybersecurity regulatory requirements and information regarding our cybersecurity program, see Item [removed: 1.][added: 1C.]
A material shift away from natural gas toward increased electrification and a reduction in the use of natural gas as a result of [removed: economic] decarbonization measures could adversely impact our [removed: business.][added: gas business and ability to execute on our overall PSE&G business strategy.]
If these changes [removed: progressed] [added: progress rapidly] in the near-term, our business model and our ability to execute on our [added: overall PSE&G business] strategy could be materially impacted.
Various jurisdictions outside of New Jersey have enacted prohibitions or restrictions on the use and consumption of natural gas [removed: that will reduce] [added: and] the [removed: use] [added: BPU has commenced stakeholder proceedings regarding the Future] of [removed: natural gas.][added: Natural Gas as required by the New Jersey governor’s EO issued in 2023.]
[removed: Further,] [added: In response to the coronavirus pandemic, New Jersey and the BPU implemented] a number of expanded customer protection [removed: measures have been implemented by the State and the BPU,] [added: measures,] such as an extended moratorium on shut-offs of residential service for non-payment, and more extensive processes to be taken prior to any shut-off of service.
These actions [removed: have] negatively affected customer payment patterns, leading to an elevated aged accounts receivable balance.
Our ability to manage our accounts receivable balance, [removed: recover its] [added: and obtain recovery in rates for our] carrying costs and any associated bad debts could have a material impact on our business.
Certain events such as an aging workforce looking to retire without an opportunity to transfer knowledge to a successor, inadequate workforce plans and replacements, lack of skill set to meet current and evolving business needs, a culture that does not foster inclusion leading to turnover, [removed: a workforce strike resulting from a failure to successfully negotiate new collective bargaining agreements with our labor unions on mutually acceptable terms or at all, unavailability of resources due to the coronavirus pandemic,] acts of violence in the [removed: workplace] [added: workplace, inadequate training] and a workforce that is not engaged may lead to operating [removed: challenges] [added: challenges, safety concerns] and increased costs.
Higher costs from suppliers of equipment and materials, fuel, services and labor costs to attract and retain our workforce, could lead to increased costs, which [added: could reduce our earnings.]
Also, seeking recovery of higher costs in future [added: distribution base] rate cases could pressure customer rates, resulting in a potentially adverse outcome of such proceedings, or in other proceedings, including the proposal of certain investment programs or other proceedings that impact customer rates.
PSEG’s and PSE&G’s [removed: fixed income] debt instruments contain events of default customary for financings of their type, including cross accelerations to other debt of that entity.
[removed: PSEG’s] [added: PSEG’s,] PSE&G’s and PSEG Power’s bank credit agreements, contain certain limitations on the incurrence of liens and PSEG Power’s bank credit agreements also contain limitations on the incurrence of certain subsidiary debt.
We may not be able to obtain waivers, amendments or alternative financing, or if obtainable, it could be on terms that [removed: are not acceptable to us.]
Changes in prevailing market prices [added: below the PTC threshold] could have a material adverse effect on our financial condition and results of operations.
- climate [removed: change] [added: change,] and weather conditions, particularly unusually mild summers or warm winters in our market areas;
- economic and political conditions that could negatively impact the demand for [removed: power;][added: power or PTCs on our nuclear generation units;]
- complete supporting information technology (IT), cybersecurity and physical security upgrades;
- timely recovery of these investments through rates.
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
Further, new types of cyberattacks, whether directed at our own infrastructure and technology and operational systems or that of third parties, may be generated or enhanced through the use of Artificial Intelligence (AI).
To date, there has been no material impact or reasonably likely material impact on our business strategy, results of operations or financial condition from these attacks or other cybersecurity incidents, including as a result of prior cybersecurity incidents.
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
Cybersecurity.
The CIP protects PSE&G’s margin variances against changes in customer usage of gas and electricity, but not against a decrease in the gas customer base (number of customers on the system).
If the above changes occurred, that would also require investment in the electric T&D system to accommodate higher loads.
In addition, in order to enable the New Jersey clean energy economy, sustained grid modernization will be required to accommodate increased EE, EV infrastructure, increased penetration of distributed energy resources on the electric system, such as on-site solar generation and also anticipated increased deployment of energy storage, fuel cells, and DR technologies.
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
are not acceptable to us.
If we are unable to extend certain significant contracts on terms acceptable to us, this may negatively affect our financial condition and operating results
We are party to several contracts from which we derive significant revenues.
PSEG Power sells wholesale natural gas, primarily through a full-requirements BGSS contract with PSE&G to meet the needs of PSE&G’s default gas supply service customers.
In 2022, the BPU approved an extension of the long-term BGSS contract to March 31, 2027, and thereafter the contract remains in effect unless terminated by either party with a two-year notice.
PSEG LI has an OSA with LIPA to operate LIPA’s electric T&D system in Long Island.
The OSA continues through 2025, but can be extended by mutual agreement of the parties.
Further, PSEG Power provides fuel procurement and power management services to LIPA under separate agreements that expire at the end of 2025.
It is uncertain whether any of these contracts and agreements will be extended on terms acceptable to us or at all, which may negatively affect our financial condition and operating results.
For additional information, see Item 1.
Business—PSEG Power & Other.
Artificial Intelligence is an emerging area of technology that has the potential to impact various aspects of our business operations and customer interactions.
The development, adoption, and use for generative AI technologies are still in their early stages and ineffective or inadequate AI development or deployment practices by PSEG or third-party vendors could result in unintended consequences.
We contract third-party vendors that use AI in products and/or services they provide and we may not have full control or visibility over the quality, performance, security or compliance of the products and services that incorporate AI-related technology.
AI algorithms that we or our third-party vendors use may be flawed or may be based on datasets that are biased or insufficient.
These limitations or failures could result in reputational damage and legal liabilities.
Developing, testing, and deploying resource-intensive AI systems may require additional investment and increase our costs.
In addition, the evolving nature of AI may cause new laws and regulations to be enacted which may require significant resources to modify and maintain business practices to comply with the new laws and regulations, the nature of which cannot be determined at this time.
Further, inaccurate results generated as a result of our employees’, contractors’ or vendors’ use of generative AI technologies could lead to operational interruptions or reputational harm.
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
material needs over the next several years.
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
In addition, changing capacity performance rules and/or failure to follow existing rules – by PJM or market participants – creates regulatory uncertainty and reliability risk.
In December 2023, we filed a distribution base rate case, as required by the BPU.
Note 13.
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
- complete supporting IT upgrades;
- recover the related costs through rates.
There is no
Business—Regulatory Issues—Cybersecurity.
Technological advancements enabling customer choice and state climate policy supporting decarbonization are driving transformative change in the electric power industry.
New Jersey utilities are experiencing increased usage by customers and third parties of distributed energy resources, such as on-site solar generation, energy storage, fuel cells, EE, and demand response technologies.
These developments will require modernization of the electric distribution grid to, among other things, accommodate two-way flows of electricity, increase the grid’s capacity, and interconnect distributed energy resources.
In order to enable the New Jersey clean energy economy, sustained investments are required in grid modernization, renewable integration projects, EE programs, energy storage options, EV infrastructure and state infrastructure modernization.
Our financial condition and results of operations could be adversely affected by the coronavirus pandemic.
In response to the global coronavirus pandemic, we have implemented a comprehensive set of actions to help our customers, communities and employees, and will continue to closely monitor developments and adjust as needed to ensure reliable service while protecting the safety and health of our workforce and the communities we serve.
The pandemic’s potential impact will depend on a number of factors outside of our control, including the duration and severity of the outbreak as well as third-party actions, including governmental requirements.
Pursuant to a BPU order, we have deferred a significant amount of costs for future recovery.
Any inability to obtain timely recovery of these costs could have a material adverse effect on our business.
We currently cannot estimate the potential impact the coronavirus pandemic may have on our business, results of operations, financial condition, liquidity and cash flows.
The impacts of the pandemic and associated government and regulatory responses, including the long-term impact they may have on the economy, which could extend beyond the duration of the pandemic, could affect, among other things:
- PSE&G’s residential and C&I customer payment patterns, in part as residential customer non-safety related service disconnections for non-payment were temporarily suspended for an extended period, resulting in adverse impacts to accounts receivable and bad debt expense;
- the recovery of incremental costs incurred related to the pandemic, including higher bad debts; and
- the availability of materials and supplies due to supply chain interruptions.
Inflation has recently increased across the economy and is impacting portions of our business.
could reduce our earnings.
Certain of our other generation facilities also require fuel or other services that may only be available from one or a limited number of suppliers.
The availability and price of this fuel may vary due to supplier financial or operational disruptions, transportation disruptions, force majeure and other factors, including market conditions.
At times, such fuel may not be available at any price, or we may not be able to transport it to our facilities on a timely basis.
In this case, we may not be able to run those facilities even if it would be profitable.
If we had sold forward the power from such a facility, we could be required to supply or purchase power from alternate sources, perhaps at a loss.
operations.
While our generation runs on nuclear fuel, an increase in the cost of any particular fuel ultimately used by other generation facilities could impact our results of operations.
- transportation constraints;
earthquakes, explosions, floods, severe weather or other similar occurrences.
Certain of our generation facilities rely on transmission facilities that we do not own or control and that may be subject to transmission constraints.
Transmission facility owners’ inability to maintain adequate transmission capacity could restrict our ability to deliver wholesale electric power to our customers and we may either incur additional costs or forgo revenues.
We depend on transmission facilities owned and operated by others to deliver the wholesale power we sell from our generation facilities.
If transmission is disrupted or if the transmission capacity infrastructure is inadequate, our ability to sell and deliver wholesale power may be adversely impacted.
If a region’s power transmission infrastructure is inadequate, our recovery of wholesale costs and profits may be limited.
In addition, in PJM, energy transmission congestion risk and associated costs exist.
We may not be able to accurately predict and hedge this risk due to insufficient market data and liquidity.
Note 15.
unaffiliated competitors in those markets and could adversely affect retail rates received by PSE&G in an effort to offset any perceived benefit to PSEG Power from the affiliation.
If these programs are not approved, that could also adversely affect our service levels for customers.
We have implemented the terms of the agreement.
An excerpt. Shown here: 40 of 86 rewritten, 40 of 56 added and 40 of 46 removed. The counts are complete. For every sentence, read Item 1A. RISK FACTORS in the FY2023 filing and the FY2022 filing.
Page headers and footers: 12 lines differ, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
Item 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS (MD&A)
245 rewritten, 114 added, 169 removed, 321 unchanged
Read the full itemFY2023 item · filed February 26, 2024FY2022 item · filed February 22, 2023
PSE&G is subject to regulation by the New Jersey Board of Public Utilities [removed: (BPU) and] [added: (BPU),] the Federal Energy Regulatory Commission [removed: (FERC).][added: (FERC), and other federal and New Jersey state regulators.]
PSEG Power’s subsidiaries are subject to regulation by FERC, the Nuclear Regulatory Commission [removed: (NRC), the Environmental Protection Agency] [added: (NRC)] and [added: other federal regulators and state regulators in] the states in which they operate.
The PSEG Power & Other reportable segment also includes amounts related to the parent company as well as PSEG’s other direct wholly owned subsidiaries, which are: PSEG [removed: Energy Holdings L.L.C. (Energy Holdings), which holds our investments in legacy lease investments and investments in offshore wind ventures; PSEG] Long Island LLC (PSEG LI), which operates the Long Island Power Authority’s (LIPA) transmission and distribution (T&D) system under an Operations Services Agreement (OSA); [added: PSEG Energy Holdings L.L.C. (Energy Holdings), which primarily holds legacy lease investments] and [added: competitively bid, FERC regulated transmission; and] PSEG Services Corporation (Services), which provides certain management, administrative and general services to PSEG and its subsidiaries at cost.
The following discussion provides an overview of the significant events and business developments that have occurred during [removed: 2022] [added: 2023] and key factors that we expect may drive our future performance.
EXECUTIVE OVERVIEW OF [removed: 2022] [added: 2023] AND FUTURE OUTLOOK
In furtherance of these goals, [removed: over the past few years,] our investments [added: in PSE&G] have [removed: simplified] [added: adjusted] our business mix to reflect a higher percentage of earnings contribution by PSE&G.
See Item [removed: 8.][added: 7.]
Note [removed: 4.][added: 3.]
[removed: Early Plant Retirements/Asset] [added: Asset] Dispositions and Impairments for additional information.
In addition, the passage of the Inflation Reduction Act [added: of 2022] (IRA) established a [removed: Production Tax Credit] [added: production tax credit] (PTC) for [added: existing] nuclear [added: facilities] from 2024 through [removed: 2032 which is expected to provide downside price protection for our nuclear generation fleet.][added: 2032.]
The low end of [removed: this] [added: the] range includes an extension of our Gas System Modernization Program (GSMP) and Clean Energy Future (CEF)-EE program at their [added: current] average annual investment levels plus inflation, as these programs are expected to continue beyond their currently approved [removed: timeframe of 2023.][added: timeframes.]
A remaining component of our [removed: CEF-EV] [added: CEF-Electric Vehicle (EV)] program related to [removed: medium] [added: medium-] and [removed: heavy duty] [added: heavy-duty] charging infrastructure has been the subject of a stakeholder process that the BPU began in 2021 and we expect that this effort will result in PSE&G submitting a filing targeting infrastructure investments for the [removed: medium and heavy duty] [added: medium-and heavy-duty] EV market in [removed: 2023.][added: 2024.]
[removed: Our CEF-ES] [added: In the meantime, our CEF-Energy Storage (ES)] program is being held in abeyance.
In September 2022, the BPU released a draft Storage Incentive Program proposal and is currently undertaking a stakeholder process to [removed: receive comments.][added: determine the details of the program.]
Pursuant to our GSMP II and Energy Strong II programs, we [removed: are required to file] [added: filed] a distribution base rate case [removed: no later than] [added: as required by the BPU in] December [removed: 31,] 2023.
Among other things, the [added: distribution base] rate case will [added: seek to] recover capital expenditures associated with [removed: these programs,] [added: our infrastructure investment programs that are not already in rates,] as well as the Advanced Metering Infrastructure [added: (AMI)] and EV programs, [removed: and] other investments that are not recovered through periodic rate [removed: roll-ins.][added: roll-ins, and several other cost and return factors.]
We expect to conclude the [added: distribution base rate] case [added: later] in [removed: the second half of] 2024.
At PSEG Power, we seek to produce [removed: low-cost] [added: low-cost, reliable and resilient] electricity by efficiently operating our nuclear generation assets, mitigate [added: earnings] volatility [removed: by contracting in advance for a significant portion of their output] [added: through the PTC mechanism] and [added: hedging, and] support public [removed: policy objectives] [added: policies] that preserve these existing [added: carbon-free base load] nuclear generating plants.
During [removed: 2022,] [added: 2023,] our nuclear units generated [removed: 31.3] [added: approximately 32] terawatt hours and operated at a capacity factor of [removed: 92.2%.][added: approximately 93%.]
We have established a net zero greenhouse gas (GHG) emissions by 2030 goal that includes direct GHG emissions (Scope 1) and indirect GHG emissions from operations (Scope 2) across our [added: business] operations, assuming advances in technology, public policy and customer behavior.
Scope 1 emissions include power generation, [added: fuel combustion at PSEG facilities,] methane leaks, vehicle fleet emissions, [removed: and] sulfur hexafluoride [added: emissions,] and refrigerant leaks.
Scope 2 emissions include [removed: both gas and electric] purchased [added: electric and steam] energy for our [removed: PSE&G] [added: PSEG] facilities and [added: emissions associated with] line losses.
PSE&G’s approved CEF-EE, CEF-Energy Cloud and CEF-EV programs and the proposed CEF-ES [removed: program] [added: and CEF-EE II programs] are intended to support New Jersey’s Energy Master Plan [added: and recent Gubernatorial Executive Orders] through programs designed to help customers [removed: increase their EE,] [added: use energy more efficiently, reduce GHG emissions,] support the expansion of the EV infrastructure in [removed: the State,] [added: New Jersey,] install energy storage capacity to supplement solar generation and enhance grid resiliency, install smart meters and supporting infrastructure to allow for the integration of other clean energy technologies and to more efficiently respond to weather and other outage events.
The first phase of our GSMP replaced approximately 450 miles of cast-iron and unprotected steel gas main infrastructure, and the second phase of this program [removed: is expected to replace] [added: replaced] an additional [removed: 875] [added: 1,090] miles of gas pipes [removed: through] [added: and was completed in the first quarter of] 2023.
Through GSMP II, from 2018 through 2023 we [removed: expect to reduce] [added: reduced] methane leaks by approximately 22% system wide and assuming [removed: a] continuation of GSMP, we expect to achieve an overall reduction in methane emissions of [removed: approximately] [added: at least] 60% over the 2011 [added: baseline] through 2030 period.
We also continue to assess physical risks of climate change and adapt our capital investment program to improve the reliability and resiliency of our system in an environment of increasing frequency and severity of weather events, notably through our investments in our Energy Strong program and Infrastructure Advancement [removed: Program.][added: Program and our investments in transmission infrastructure upgrades.]
These investments have shown benefits in recent severe weather events, including Tropical Storm Ida in [removed: August] 2021, which brought significant flooding to our service territory but did not result in the loss of any of our electric distribution substations.
In February 2023, [added: the governor of] New Jersey [removed: Governor Murphy] issued [removed: three] executive orders [added: (EOs)] that establish [removed: targets,] or accelerate previously established 2050 [removed: targets,] [added: targets] for clean-sourced energy, building [removed: electrification,] [added: decarbonization,] and EV adoption goals, with new target dates of 2030 or 2035, as applicable.
The [removed: executive orders] [added: EOs] direct the BPU and other state agencies to collaborate with stakeholders to develop [removed: plans, including the new 2024 Energy Master Plan,] [added: plans] to reach the targets and [removed: convene] [added: the BPU has convened] a stakeholder proceeding to develop a [removed: new] plan for gas distribution utilities to reach the [removed: target, previously established in a 2021 executive order,] [added: target] of 50% natural gas emissions reductions over 2006 levels by 2030.
[added: We are unable to predict the] outcomes of [removed: the various proceedings,] [added: this proceeding,] but [removed: they] [added: it] could have a material impact on our business, results of operations and cash flows.
[added: In May 2023,] PSEG [removed: holds a 25% equity interest in] [added: sold to] Ørsted North America [removed: Inc.’s] [added: Inc.] (Ørsted) [added: its 25% equity interest in] Ocean Wind [removed: 1 project which is currently in development.][added: JV HoldCo, LLC.]
The sale proceeds [removed: approximate] [added: approximated] PSEG’s carrying value of the [removed: investment and] [added: investment; therefore,] no material gain or loss [removed: is expected] [added: was recognized] upon disposition.
In [removed: 2021-2022,] [added: April 2023,the BPU issued an order requesting that] PJM [removed: Interconnection, L.L.C. (PJM) conducted its first-ever] [added: conduct a second] public policy [removed: Order 1000] transmission solicitation process utilizing the [removed: state agreement approach] [added: State Agreement Approach] for transmission projects to support New Jersey’s [removed: planned] [added: expanded] offshore wind [removed: generation.][added: goal.]
The financial results for PSEG, PSE&G and PSEG Power [added: & Other] for the years ended December 31, [removed: 2022] [added: 2023] and [removed: 2021] [added: 2022] are presented as follows:
| | | | | | | | | | [added: 2023 | | | | | |] 2022 | | | | | | 2021 | | | | | |
| | | | PSE&G | | | | | | $ | [added: 1,515 | | | | | $ |] 1,565 | | | | | $ | 1,446 | | | | |
| | | | PSEG Power & Other [added: (A)(B)] | | | | | | [added: 1,048 | | | | | |] (534) | | | | | | (2,094) | | | | | |
| | | | PSEG Net Income (Loss) | | | | | | $ | [added: 2,563 | | | | | $ |] 1,031 | | | | | $ | (648) | | | | |
| | | | PSEG Net Income (Loss) Per Share (Diluted) | | | | | | $ | [added: 5.13 | | | | | $ |] 2.06 | | | | | $ | (1.29) | | | | |
Under current FERC rules, [removed: we continue] [added: PSE&G continues] to earn a 50 basis point adder to [removed: that] [added: its] base ROE for [removed: our] [added: its] membership in [removed: PJM.][added: PJM as a transmission owner.]
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
The PTC is expected to provide downside price protection for our nuclear generation fleet as the tax credit value is directly linked to a nuclear facility’s gross receipts.
For the years 2024-2028, our regulated capital investment program is estimated to be in a range of $18 billion to $21 billion.
We expect these capital investments to result in a compound annual growth rate in our regulated rate base in a range of 6% to 7.5% from year-end 2023 to year-end 2028.
The regulated capital investments represent the majority of PSEG’s total capital investment program of $19 billion to $22.5 billion.
The upper end of our capital investment range includes incremental investments, particularly for an expansion of our current EE programs as well as other clean energy and infrastructure investments.
During 2023, the BPU approved a $280 million nine-month extension of our CEF-EE program through June 2024 and a two-year extension of our current GSMP program to replace at least 400 miles of cast iron and unprotected steel mains and services in our gas system.
The GSMP program extension provides for main replacement through December 2025 plus trailing services replacement and paving costs into 2026 and totals approximately $900 million of investment.
Of the $900 million, $750 million is recovered through three periodic rate updates with the balance recovered through a future distribution base rate case.
Our broader GSMP III, which also included projects to introduce renewable natural gas and hydrogen blending into our existing distribution system is being held in abeyance, with negotiations reinitiated by January 2025 with the intent of beginning the work in January 2026.
In November 2023, we filed for a second extension of our CEF-EE program, which would cover a commitment period of six months from July 2024 through December 2024 for approximately $300 million.
In December 2023, we filed for our CEF-EE II program, which proposed a $3.1 billion investment for a second program cycle covering commitments from January 2025 through June 2027, with investments being made over a six-year period.
This EE filing is a significant increase from our prior filings, driven by an increase in the savings targets required under the BPU Energy Efficiency Framework and higher costs to achieve those targeted savings.
The filing also includes demand response programs and building decarbonization programs.
The CEF-EE extension filing is expected to be resolved in the first half of 2024 and the EE II filing is expected to be resolved in the second half of 2024.
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
The filing proposes an overall revenue increase of 9% with a 12% increase for the combined typical residential electric and gas customer.
As of the end of 2023, PSEG Power has hedged approximately 90% to 95% of its expected generation output for 2024.
Beginning in 2024, our hedging strategy will incorporate an estimated range of risk reduction impacts from the PTCs on our nuclear generation portfolio.
This is expected to result in changes to our current approach given PTC guidance uncertainty, and potential incremental changes upon final U.S. Treasury guidance.
Consistent with our commitment to the United Nations-backed Race to Zero campaign, we had submitted proposed targets encompassing Scopes 1, 2 and 3 emissions to the Science-Based Targets initiative (SBTi).
SBTi recently informed us that they have rejected our submittal because, while our Scope 1 and 2 and Scope 3 electric targets meet requirements to proceed to the validation process, our Scope 3 natural gas target aligns with a Well Below 2C temperature scenario, rather than a more ambitious 1.5C scenario.
As mentioned above, the BPU approved a two-year extension of GSMP in October 2023.
We also continue to focus on providing cleaner energy for our customers by working to preserve the economic viability of our nuclear units, which provide over 85% of the carbon-free energy in New Jersey.
These efforts include reducing market risk by advocating for state and federal policies, such as the PTC established by the IRA, and capacity market reform at PJM that recognize the value of our nuclear fleet’s carbon-free generation and its contribution to grid reliability.
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
Competitively Bid, FERC Regulated Transmission Projects
PSEG continues to evaluate investment opportunities in regulated transmission beyond PSE&G.
In December 2023, PJM awarded a subsidiary of Energy Holdings an approximately $424 million project to address increasing load and reliability issues in Maryland as part of its 2022 Window 3 competitive solicitation.
The project has an expected in-service date of 2027.
We also continue to evaluate regulated transmission opportunities to support offshore wind development in the New Jersey area.
The solicitation will seek to procure both onshore and offshore transmission solutions.
PJM stated that the solicitation process is tentatively expected to commence in 2024.
In November 2023, the BPU issued an order directing its staff to conduct a solicitation for “pre-build infrastructure” to support landing and routing of underground transmission cables of future offshore wind projects.
PSEG is evaluating this opportunity and may submit a bid or bids into the solicitation.
| | | | | | | | | | 2023 | | | | | | 2022 | | | | | |
In April 2021, FERC proposed eliminating this ROE adder for Regional Transmission Owner participation.
FERC has not acted on the proposal.
New Jersey Stakeholder Proceedings
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
We have further proactively changed our business mix through the sale of our fossil generation portfolio which closed in 2022.
For the years 2023-2027, PSE&G’s capital investment program is estimated to be in a range of $15.5 billion to $18 billion, resulting in an expected compound annual growth in rate base of 6% to 7.5% from year-end 2022 to year-end 2027.
The upper end of our capital investment range includes an extension of our Energy Strong program, which otherwise concludes in 2024, as well as the remaining portion of our CEF proposal (portion of Electric Vehicle (EV) and Energy Storage (ES) programs) and a potentially higher amount of investments for GSMP and CEF-EE beyond current levels.
We filed for a $320 million short-term extension of our CEF-EE program in September 2022, which we expect will be resolved in 2023.
PSE&G is active in the proceeding.
We recently closed the sale of our Solar generation and Fossil generation businesses in 2021 and 2022, respectively.
These transformative transactions reduced our overall business risk and earnings volatility.
PSEG Power’s hedging practices help to mitigate a significant amount of the earnings volatility of the merchant nuclear power business.
More than 90% of PSEG Power’s expected gross margin in 2023 relates to hedging of our energy margin, our expected revenues from the capacity market mechanism, Zero Emission Certificate (ZEC) revenues and, certain gas operations
and ancillary service payments such as reactive power.
While this limits our exposure to decreasing prices, our ability to realize benefits from rising market prices is also limited.
During the second half of 2021 and continuing throughout 2022, forward energy prices have demonstrated considerable price volatility and have increased dramatically.
This has led to significantly higher variation in our collateral requirements, which have also increased substantially over that time period for hedge positions that are out-of-the money.
PSEG Power’s net cash collateral postings related to these hedge positions increased from $343 million at the end of June 2021 to $1.5 billion at the end of December 2022.
Subsequent to December 2022, collateral postings continued to experience significant fluctuations in our daily collateral requirements.
Net cash collateral postings were approximately $700 million as of February 17, 2023.
While currently off their highs experienced during 2022, collateral postings could remain volatile into 2023.
However, as historical lower-priced trades continue to settle through 2024, collateral is expected to be returned as we satisfy our obligations under those contracts.
PSEG continues to maintain sufficient liquidity as described in Liquidity and Capital Resources.
We have also committed to the United Nations-backed Race to Zero campaign.
We continue to evaluate and are working toward developing and submitting science-based emission reduction targets following the criteria and recommendations of the Science Based Targets initiative (SBTi) by September 2023 which encompass Scopes 1, 2, and 3 (the majority of which are associated with the downstream use of energy products) and seek to be in line with 1.5oC emissions scenarios in order to be validated by the SBTi.
We also continue to focus on providing cleaner energy for our customers.
Our priority is to preserve the economic viability of our nuclear units, which provide over 85% of the carbon-free energy in New Jersey, by advocating for state and federal policies, such as the IRA discussed below, that recognize the value of carbon-free generation and reduce market risk.
Such proceeding is to consider competitive market mechanisms including adoption of a “clean heat” standard, policies to minimize investment in new gas infrastructure, and alternative programs that could provide natural gas utilities with new revenue streams, such as conversion of existing pipeline infrastructure to provide decarbonized heating and cooling (for example, district geothermal).
We are unable to predict the
In January 2023, PSEG agreed to sell to Ørsted its 25% equity interest in Ocean Wind JV HoldCo, LLC.
The sale is contingent upon finalization of a purchase and sale agreement with Ørsted and other closing conditions as well as potential state regulatory approval that may be required to close on the transaction.
The sale is expected to close in the first half of 2023.
PSEG has no further obligation to make any capital contributions to the project prior to closing on the transaction.
PSEG will continue to provide construction management and environmental permitting services for the onshore substations and transmission cable installation scope of the project.
PSEG has decided not to exercise its option to purchase 50% of Ørsted’s Skipjack projects in Maryland (one of which would utilize a portion of the GSOE lease area) or pursue an ownership interest in Ørsted’s Ocean Wind 2 offshore wind project or other offshore wind generation projects.
The state agreement approach requires customers in the requesting state - in this case New Jersey - to pay for the costs of these public policy transmission projects.
PSEG and Ørsted jointly submitted several proposals in response to the solicitation, including multi-spur options and an offshore network proposal.
The BPU completed its review of offshore wind transmission in October 2022 and awarded several on-shore, though no offshore, solutions.
PSE&G was awarded $40 million for transmission upgrades.
The BPU also indicated that it would consider conducting an additional solicitation to address the State’s increased offshore wind generation targets.
Distribution investment needs and scope and transmission planning and rates rules, as well as wholesale power market design, including clarification from the U.S. Treasury on PTCs for electricity generation using nuclear energy, are of particular importance to our results and we continue to advocate for policies and rules that promote fair and efficient electricity markets.
For additional information about regulatory, legislative and other developments that may affect us, see Item 1.
Business—Regulatory Issues.
In October 2021, FERC approved a settlement agreement effective August 1, 2021 that we reached with the BPU and the New Jersey Division of Rate Counsel about the level of PSE&G’s base transmission ROE and other formula rate matters.
An excerpt. Shown here: 40 of 245 rewritten, 40 of 114 added and 40 of 169 removed. The counts are complete. For every sentence, read Item 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS (MD&A) in the FY2023 filing and the FY2022 filing.
Page headers and footers: 21 lines differ, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
Item 7A. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT
16 rewritten, 3 added, 2 removed, 37 unchanged
Read the full itemFY2023 item · filed February 26, 2024FY2022 item · filed February 22, 2023
To reduce price risk caused by market fluctuations, we enter into supply contracts and derivative contracts, including forwards, futures, [removed: swaps] [added: swaps, treasury locks,] and options with approved counterparties.
The [removed: MTM VaR] calculation does not include market risks associated with activities that are subject to accrual accounting, primarily our generating facilities and some load-serving activities.
| | | | Period End | | | | | | $ | [removed: 122] [added: 48] | | | | | $ | [removed: 71] [added: 122] | | | | |
| | | | Average for the Period | | | | | | $ | [removed: 152] [added: 56] | | | | | $ | [removed: 36] [added: 152] | | | | |
| | | | High | | | | | | $ | [removed: 365] [added: 127] | | | | | $ | [removed: 113] [added: 365] | | | | |
| | | | Low | | | | | | $ | [removed: 70] [added: 24] | | | | | $ | [removed: 7] [added: 70] | | | | |
| | | | Period End | | | | | | $ | [removed: 191] [added: 75] | | | | | $ | [removed: 112] [added: 191] | | | | |
| | | | Average for the Period | | | | | | $ | [removed: 239] [added: 87] | | | | | $ | [removed: 57] [added: 239] | | | | |
| | | | High | | | | | | $ | [removed: 572] [added: 198] | | | | | $ | [removed: 178] [added: 572] | | | | |
| | | | Low | | | | | | $ | [removed: 110] [added: 38] | | | | | $ | [removed: 11] [added: 110] | | | | |
As of December 31, [removed: 2022,] [added: 2023,] a hypothetical 10% increase in market interest rates would result in an additional [removed: $6] [added: $2] million in pre-tax annual interest costs related to either the current or the long-term portion of long-term debt, and term loan agreements.
As of December 31, [removed: 2022,] [added: 2023,] we had [removed: $5.3] [added: $4.6] billion of net assets in trust for our pension and OPEB plans.
As of December 31, [removed: 2022,] [added: 2023,] the portfolio included [removed: $1.1] [added: $1.3] billion of equity securities [added: inclusive of $0.3 billion of investments in listed real assets,] and [removed: $1.1] [added: $1.2] billion in fixed income securities.
As of December 31, [removed: 2022,] [added: 2023,] a hypothetical 10% change in the equity market would impact the value of the equity securities in the NDT Fund by approximately [removed: $110] [added: $131] million.
The benchmark for the fixed income component of the NDT Fund currently has a duration of [removed: 6.17] [added: 6.24] years and a yield of [removed: 4.68%.][added: 4.53%.]
As of December 31, [removed: 2022,] [added: 2023,] a hypothetical 1% increase in interest rates would result in a decline in the market value for the fixed income portfolio of approximately [removed: $71] [added: $76] million.
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
| | | | | | | | | | 2023 | | | | | | 2022 | | | | | |
Note 16.
| | | | | | | | | | 2022 | | | | | | 2021 | | | | | |
Note 18.
Page headers and footers: 1 line differs, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
Item 1. BUSINESS
118 rewritten, 130 added, 161 removed, 307 unchanged
Read the full itemFY2023 item · filed February 26, 2024FY2022 item · filed February 22, 2023
We are [removed: an energy] [added: a public utility holding] company consisting primarily of a regulated electric and gas utility and a nuclear generation business.
Over the past [removed: few] [added: several] years, our investments resulted in a higher percentage of earnings contribution by PSE&G.
The sale of the fossil generating portfolio [added: in 2022] further simplified our business mix, resulting in an even higher percentage of earnings contribution by PSE&G going forward and provides more financial flexibility.
Note [removed: 4.][added: 2.]
[removed: Early Plant Retirements/Asset] [added: Asset] Dispositions and Impairments for additional information.
Our other direct wholly owned subsidiaries are: PSEG [removed: Energy Holdings L.L.C. (Energy Holdings), which holds our legacy portfolio of lease investments and interests in offshore wind ventures; PSEG] Long Island LLC (PSEG LI), which operates the Long Island Power Authority’s (LIPA) electric transmission and distribution (T&D) system under a contractual agreement; [added: PSEG Energy Holdings L.L.C. (Energy Holdings), which primarily holds our legacy lease investments] and [added: competitively bid, FERC regulated transmission; and] PSEG Services Corporation (Services), which provides us and our operating subsidiaries with certain management, administrative and general services at cost.
Our regulated T&D public utility, PSE&G, distributes electric energy and natural gas to customers within a designated service territory running diagonally across New Jersey where approximately [removed: 6.5] [added: 6.8] million people, or about [removed: 70%] [added: 74%] of New Jersey’s population resides.
[removed: ][added: ]
We provide distribution service to [removed: 2.3] [added: 2.4] million electric customers and 1.9 million gas customers in a service area that covers approximately 2,600 square miles running diagonally across New Jersey.
Formula rates provide a method of rate recovery where the transmission owner annually determines its revenue requirements through a fixed formula that provides for a recovery of our operating costs and a return of and on our capital investments in the system, net of [added: accumulated] depreciation [removed: expense] and deferred [removed: taxes] [added: tax liabilities] (also known as rate base) using an approved return on equity (ROE) in developing the weighted average cost of capital.
Our current approved [added: transmission] rates provide for a base ROE of 9.90% and a 50 basis point adder for our membership in PJM as an RTO.
MD&A—Executive Overview of [removed: 2022] [added: 2023] and Future Outlook.
For a discussion of proposed and approved programs, see Investment Clause Programs [removed: below] [added: as follows] and Item 7.
MD&A—Executive Overview of [removed: 2022] [added: 2023] and Future Outlook.
Our load requirements are split among residential, C&I customers, as described in the following table for [removed: 2022:][added: 2023:]
Our customer base has modestly increased since [removed: 2018,] [added: 2019,] with electric and gas loads changing as illustrated in the following table:
| | | | | | | Number of Customers as of December 31, [removed: 2022] [added: 2023] | | | | | | | | | Historical Annual Customer Growth [removed: 2018-2022] [added: 2019-2023] | | | | | | Electric Sales and Firm Gas Sales as of December 31, [removed: 2022] [added: 2023] (A) | | | | | | | | | Historical Annual Load [removed: Growth 2018-2022] [added: Decline 2019-2023] | | | | | |
| | | | Electric | | | [removed: 2.3] [added: 2.4] | | | Million | | | | | | 0.9 | | % | | | | [removed: 40,816] [added: 39,085] | | | Gigawatt hours | | | | | | [removed: —%] [added: (1.4)%] | | | | | |
| | | | Gas | | | 1.9 | | | Million | | | | | | [removed: 0.7] [added: 0.6] | | % | | | | [removed: 2,567] [added: 2,282] | | | Million Therms | | | | | | [removed: 1.4%] [added: (2.8)%] | | | | | |
Effective June 1 and October 1, 2021 for electric and gas, respectively, as part of the BPU’s approval of the Clean Energy Future-Energy Efficiency (CEF-EE) filing, we implemented the Conservation Incentive Program (CIP) that trues up PSE&G’s margin to a baseline per customer from our 2018 [added: distribution] base rate case for the majority of our customers.
| | | | Gas System Modernization Program II (GSMP II) [added: Extension] | | | | | | [removed: $1.9 billion] [added: $902 million] | | | | | | [removed: 2018] [added: 2023] | | | | | | [removed: 5] [added: 2] years | | | [added: (A)] | | | | | | [removed: 2019] [added: 2024] | | | | | |
| | | | Energy Strong II [removed: (ES II)] Program | | | | | | $842 million | | | | | | 2019 | | | | | | 4 years | | | [removed: (A)] [added: (B)] | | | | | | 2019 | | | | | |
| | | | CEF-EE | | | | | | $1 billion | | | | | | 2020 | | | | | | [removed: 3] [added: 5] years | | | [removed: (B)] [added: (C)] | | | | | | 2020 | | | | | |
[removed: (A) The] [added: (A)The] program has a small amount of trailing costs expected to be spent in year [removed: 5.][added: 3.]
[removed: (B)Rolling] [added: (C)Rolling] three-year program with over 80% of spending within 5 years, with limited spending thereafter.
GSMP [removed: II—designed] [added: II Extension—designed] to replace [removed: approximately 875] [added: at least 400] miles of cast iron and unprotected steel mains [added: and services] in [removed: addition to other improvements to the] [added: our] gas system.
[removed: ES] [added: Energy Strong] II Program—structured to harden, modernize and improve the resiliency of our electric and gas distribution systems.
Our proposed [removed: Energy Storage] [added: ES] program is for a $109 million investment that encompasses solar smoothing, whereby a battery energy solar system is used to neutralize fluctuations in solar output to facilitate its entry into the grid, distribution investment deferral, outage management, microgrids and peak reduction for municipal facilities.
[removed: IAP—fashioned] [added: IAP—designed] to improve the reliability of the “last mile” of our electric distribution system and address aging substations and gas metering and regulation stations.
MD&A—Executive Overview of [removed: 2022] [added: 2023] and Future Outlook for additional information.
We have also undertaken solar initiatives at PSE&G, which primarily invest in utility-owned solar photovoltaic (PV) grid-connected solar systems installed on PSE&G property and [removed: third party] [added: third-party] sites with our economics driven by our net investment in solar, with a contemporaneous return on that rate base.
Note [removed: 15.][added: 8.]
Note [removed: 4.][added: 6.]
As a [removed: merchant generator,] [added: nuclear generation owner and operator,] our revenue [removed: is] [added: has been] derived primarily from energy, capacity and ancillary services [added: sold] to [removed: counterparties] [added: PJM] in the [removed: open] [added: spot] markets.
These products and services may [added: also] be transacted through exchange markets or bilaterally.
PSEG Power also sells wholesale natural gas, primarily through a full-requirements BGSS contract with PSE&G to meet the needs of PSE&G’s [added: default service] customers.
PSEG Power [removed: satisfies the remainder of] [added: supplies] PSE&G’s [added: peak daily gas] requirements [removed: from] [added: through its balanced portfolio of firm gas transportation capacity,] storage contracts, contract peaking supply, [added: and] liquefied natural gas and propane.
Based upon the availability of natural gas beyond PSE&G’s [added: actual] daily needs, PSEG Power sells gas to other customers and shares these proceeds with PSE&G’s customers.
As of December 31, [removed: 2022,] [added: 2023,] PSEG Power had [removed: 3,766] [added: 3,761] MW of nuclear generation capacity.
We expect to be able to meet the [added: nuclear] fuel supply demands of our [removed: customers and our] operations.
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
Our transmission revenues are not impacted by sales volumes.
Our distribution rates are subject to periodic rate cases approved by the BPU.
Our current approved
distribution base rates provide for an ROE of 9.6%.
In December 2023, we filed a distribution base rate case as required by the BPU.
For a discussion of our recent distribution base rate case filing, see Item 7.
MD&A—Executive Overview of 2023 and Future Outlook.
| | | | | | | | | | % of 2023 Sales | | | | | | | | | | | |
| | | | Commercial | | | | | | 58% | | | | | | 38% | | | | | |
| | | | Residential | | | | | | 33% | | | | | | 58% | | | | | |
While there has been a recent decrease in load due to a decline in larger industrial customers, greater EE and other factors, PJM’s most recent forecast indicates an increase in load over the next several years due to the increasing adoption of EVs, the expansion of data centers and other large users in our area, ongoing growth in the number of customers, other sources of electrification and other factors, which will collectively drive the need for increased system investment in the future.
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
| | | | CEF-EE Extension | | | | | | $280 million | | | | | | 2023 | | | | | | 9 months | | | | | | | | | 2023 | | | | | |
(B)The program has a small amount of trailing costs expected to be spent in year 5.
Our CEF-Energy Storage (ES) program, which was filed with the BPU in October 2018, is being held in abeyance.
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
PSEG Power & Other
PSEG Power & Other is predominantly comprised of its nuclear generation assets, its natural gas supply operations, the Operating Services Agreement (OSA) of PSEG LI with LIPA, and other legacy investments.
The expected PTC rate is up to $15 per megawatt hour (MWh) subject to adjustment based upon a facility’s gross receipts and meeting prevailing wage rules.
Until additional guidance is issued by the U.S. Treasury, we are unable to fully determine the impacts of the PTC.
All of our nuclear generation capacity is located in New Jersey and Pennsylvania.
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
The PTC is expected to mitigate our exposure to this volatility and provide support for the nuclear units.
The PTC is designed to increase with inflation, and therefore, future inflation levels will impact the financial support of the nuclear units.
In addition, market revenues in excess of the PTC threshold would provide incremental benefit.
The number of ZECs purchased by each EDC from a selected nuclear power plant for an energy year is expected to be reduced by the number of ZECs equal in value to the dollar amount of PTCs received by the same plants.
The PTC is intended to provide sufficient and stable support for nuclear units and is effective January 1, 2024.
As of the end of 2023, we have hedged approximately 90% to 95% of its expected generation output for 2024.
Beginning in 2024, our hedging strategy will incorporate an estimated range of risk reduction impacts from the PTCs on our nuclear generation portfolio.
This is expected to result in changes to our current approach given PTC guidance uncertainty, and potential incremental changes upon final U.S. Treasury guidance.
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
In December 2023, PJM awarded a subsidiary of Energy Holdings an approximately $424 million project to construct a 500 kV transmission line in Maryland.
PSEG’s project was part of a larger set of projects designed to address reliability issues driven by load growth and retirement of fossil generation.
Our project is expected to be placed in service in 2027.
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
thresholds established in our most recent distribution base rate proceeding.
Our competitors include but are not limited to merchant generators, utility generators, energy marketers, retailers, private equity firms, and other financial entities.
Our Core Commitments – safety, integrity, continuous improvement, customer service and diversity, equity and inclusion (DEI) – are at the center of our workplace culture.
Our operations are located primarily in the Mid-Atlantic United States.
See Item 8.
See Item 7.
We continue to invest in transmission projects as part of PJM’s FERC-approved transmission expansion planning process.
These projects focus on reliability improvements and replacement of aging infrastructure with planned capital spending of $1.8 billion for transmission in 2023-2025 as disclosed in Item 7.
MD&A—Capital Requirements.
In October 2018, the BPU issued an Order approving the settlement of our distribution base rate proceeding with new rates effective November 1, 2018.
The Order provides for a distribution rate base of $9.5 billion, a 9.60% ROE for our distribution business and a 54% equity component of our capitalization structure.
| | | | | | | | | | % of 2022 Sales | | | | | | | | | | | |
| | | | Commercial | | | | | | 57% | | | | | | 37% | | | | | |
| | | | Residential | | | | | | 34% | | | | | | 59% | | | | | |
A remaining component of our program related to medium and heavy duty charging infrastructure is the subject of a stakeholder process that began in 2021 at the BPU.
In December 2022, the BPU issued a revised straw proposal on medium and heavy duty vehicle support for public comment.
Our CEF-Energy Storage program is being held in abeyance pending future policy guidance from the BPU.
Markets and Market Pricing
Historically, there has been significant volatility in commodity prices.
A rising commodity price environment results in higher delivered electric and gas rates for customers, which could result in decreased demand for electricity and gas, increased regulatory pressures and greater working capital requirements as the collection of higher commodity costs from our customers may be deferred under our regulated rate structure.
A declining commodity price, on the other hand, would be expected to have the opposite effect.
Through PSEG Power, we have sought to produce low-cost electricity by efficiently operating our nuclear generation assets while balancing fuel requirements and natural gas supply obligations through energy portfolio management.
In June 2021, we completed the sale of PSEG Power’s solar portfolio.
In February 2022, we completed the sale of PSEG Power’s 6,750 MW fossil generating portfolio.
See Item 8.
Early Plant Retirements/Asset Dispositions and Impairments for further discussion.
Approximately 47% of PSE&G’s peak daily gas requirements is provided from PSEG Power’s firm gas transportation capacity.
PSEG Power also has a 50% ownership interest in a 208 MW generation facility in Hawaii.
All of our nuclear generation capacity is located in the Mid-Atlantic region of the United States in one of the country’s largest and most developed electricity markets.
Note 15.
Prior to the sale of its fossil generation assets, PSEG Power also had significant sales within the New York ISO (NYISO) and New England ISO (ISO-NE).
The price of electricity varies by location in the PJM RTO.
Over the long-term, the higher the forward energy prices are, the more attractive an environment exists for us to contract for the sale of our anticipated output.
However, a rising price environment, such as what has been experienced in the past year, also increases the cost of replacement power; thereby placing us at greater risk should our generating units fail to operate effectively or otherwise become unavailable.
MD&A—Executive Overview of 2022 and Future Outlook—Wholesale Power Market Design.
We have obtained price certainty for our PJM capacity through May 2024 through the RPM pricing mechanism.
However, there is currently regulatory and timing uncertainty regarding the June 2024 through May 2025 planning year as discussed in Regulatory Issues—Federal Regulation.
normally over a period of two to three years.
We believe this hedging strategy increases the stability of earnings.
Therefore, our realized prices in 2022 were significantly lower than market pricing due to forward sales contracts executed in prior years for delivery in 2022.
For this same reason, expected realized prices in forward periods will also be limited to when hedges were transacted and not based upon forward market prices.
More than 90% of PSEG Power’s expected gross margin in 2023 from the nuclear generation assets relates to our energy hedging strategy, our expected revenues from the capacity market mechanisms described above, ZEC revenues and certain gas operations and ancillary service payments such as reactive power.
The contracted percentages of our anticipated base load generation output for the next two years are as follows:
An excerpt. Shown here: 40 of 118 rewritten, 40 of 130 added and 40 of 161 removed. The counts are complete. For every sentence, read Item 1. BUSINESS in the FY2023 filing and the FY2022 filing.
Page headers and footers: 17 lines differ, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
Item 3. LEGAL PROCEEDINGS
0 rewritten, 2 added, 1 removed, 4 unchanged
Read the full itemFY2023 item · filed February 26, 2024FY2022 item · filed February 22, 2023
Note 13.
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
Note 15.
Page headers and footers: 1 line differs, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
Cover and table of contents
75 rewritten, 14 added, 6 removed, 115 unchanged
Read the full itemFY2023 item · filed February 26, 2024FY2022 item · filed February 22, 2023
FOR THE FISCAL YEAR ENDED December 31, [removed: 2022][added: 2023]
The aggregate market value of the Common Stock of Public Service Enterprise Group Incorporated held by non-affiliates as of June 30, [removed: 2022] [added: 2023] was [removed: $31,279,390,691] [added: $31,072,400,281] based upon the New York Stock Exchange Composite Transaction closing price.
The number of shares outstanding of Public Service Enterprise Group Incorporated’s sole class of Common Stock as of February [removed: 17, 2023] [added: 16, 2024] was [removed: 498,769,910.][added: 498,586,596.]
As of February [removed: 17, 2023,] [added: 16, 2024,] Public Service Electric and Gas Company had issued and outstanding 132,450,344 shares of Common Stock, without nominal or par value, all of which were held, beneficially and of record, by Public Service Enterprise Group Incorporated.
| III | | | | | | Portions of the definitive Proxy Statement for the [removed: 2023] [added: 2024] Annual Meeting of Stockholders of Public Service Enterprise Group Incorporated, which definitive Proxy Statement is expected to be filed with the Securities and Exchange Commission on or about March [removed: 9, 2023,] [added: 7, 2024,] as specified herein. | | |
| FORWARD-LOOKING STATEMENTS | | | | | | [removed: [iii](#i7aff0ae0d6a44232bab2ed60782f3ed2_10)] [added: [iii](#i48f6bb8a75fb4f4aac48c282f86546fa_10)] | | |
| FILING FORMAT | | | | | | [removed: [1](#i7aff0ae0d6a44232bab2ed60782f3ed2_13)] [added: [1](#i48f6bb8a75fb4f4aac48c282f86546fa_13)] | | |
| WHERE TO FIND MORE INFORMATION | | | | | | [removed: [1](#i7aff0ae0d6a44232bab2ed60782f3ed2_16)] [added: [1](#i48f6bb8a75fb4f4aac48c282f86546fa_16)] | | |
| Item 1. | | | Business | | | [removed: [1](#i7aff0ae0d6a44232bab2ed60782f3ed2_25)] [added: [1](#i48f6bb8a75fb4f4aac48c282f86546fa_25)] | | |
| | | | Operations and Strategy | | | [removed: [2](#i7aff0ae0d6a44232bab2ed60782f3ed2_28)] [added: [2](#i48f6bb8a75fb4f4aac48c282f86546fa_28)] | | |
| | | | Competitive Environment | | | [removed: [8](#i7aff0ae0d6a44232bab2ed60782f3ed2_37)] [added: [7](#i48f6bb8a75fb4f4aac48c282f86546fa_37)] | | |
| | | | Human Capital Management | | | [removed: [9](#i7aff0ae0d6a44232bab2ed60782f3ed2_40)] [added: [8](#i48f6bb8a75fb4f4aac48c282f86546fa_40)] | | |
| | | | Regulatory Issues | | | [removed: [10](#i7aff0ae0d6a44232bab2ed60782f3ed2_43)] [added: [9](#i48f6bb8a75fb4f4aac48c282f86546fa_43)] | | |
| | | | Environmental Matters | | | [removed: [15](#i7aff0ae0d6a44232bab2ed60782f3ed2_46)] [added: [14](#i48f6bb8a75fb4f4aac48c282f86546fa_46)] | | |
| | | | Information About Our Executive Officers (PSEG) | | | [removed: [17](#i7aff0ae0d6a44232bab2ed60782f3ed2_49)] [added: [16](#i48f6bb8a75fb4f4aac48c282f86546fa_49)] | | |
| Item 1A. | | | Risk Factors | | | [removed: [18](#i7aff0ae0d6a44232bab2ed60782f3ed2_55)] [added: [17](#i48f6bb8a75fb4f4aac48c282f86546fa_55)] | | |
| Item 1B. | | | Unresolved Staff Comments | | | [removed: [30](#i7aff0ae0d6a44232bab2ed60782f3ed2_61)] [added: [30](#i48f6bb8a75fb4f4aac48c282f86546fa_61)] | | |
| Item 2. | | | Properties | | | [removed: [31](#i7aff0ae0d6a44232bab2ed60782f3ed2_67)] [added: [33](#i48f6bb8a75fb4f4aac48c282f86546fa_67)] | | |
| Item 3. | | | Legal Proceedings | | | [removed: [31](#i7aff0ae0d6a44232bab2ed60782f3ed2_73)] [added: [33](#i48f6bb8a75fb4f4aac48c282f86546fa_73)] | | |
| Item 4. | | | Mine Safety Disclosures | | | [removed: [32](#i7aff0ae0d6a44232bab2ed60782f3ed2_79)] [added: [34](#i48f6bb8a75fb4f4aac48c282f86546fa_79)] | | |
| Item 5. | | | Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities | | | [removed: [32](#i7aff0ae0d6a44232bab2ed60782f3ed2_88)] [added: [34](#i48f6bb8a75fb4f4aac48c282f86546fa_88)] | | |
| Item 6. | | | \[Reserved\] | | | [removed: [33](#i7aff0ae0d6a44232bab2ed60782f3ed2_91)] [added: [35](#i48f6bb8a75fb4f4aac48c282f86546fa_91)] | | |
| Item 7. | | | Management’s Discussion and Analysis of Financial Condition and Results of Operations | | | [removed: [33](#i7aff0ae0d6a44232bab2ed60782f3ed2_100)] [added: [35](#i48f6bb8a75fb4f4aac48c282f86546fa_100)] | | |
| | | | Executive Overview of [removed: 2022] [added: 2023] and Future Outlook | | | [removed: [34](#i7aff0ae0d6a44232bab2ed60782f3ed2_103)] [added: [36](#i48f6bb8a75fb4f4aac48c282f86546fa_3107)] | | |
| | | | Results of Operations | | | [removed: [39](#i7aff0ae0d6a44232bab2ed60782f3ed2_109)] [added: [41](#i48f6bb8a75fb4f4aac48c282f86546fa_109)] | | |
| | | | Liquidity and Capital Resources | | | [removed: [45](#i7aff0ae0d6a44232bab2ed60782f3ed2_118)] [added: [45](#i48f6bb8a75fb4f4aac48c282f86546fa_118)] | | |
| | | | Capital Requirements | | | [removed: [49](#i7aff0ae0d6a44232bab2ed60782f3ed2_121)] [added: [49](#i48f6bb8a75fb4f4aac48c282f86546fa_121)] | | |
| | | | Critical Accounting Estimates | | | [removed: [50](#i7aff0ae0d6a44232bab2ed60782f3ed2_124)] [added: [50](#i48f6bb8a75fb4f4aac48c282f86546fa_124)] | | |
| Item 7A. | | | Quantitative and Qualitative Disclosures About Market Risk | | | [removed: [54](#i7aff0ae0d6a44232bab2ed60782f3ed2_130)] [added: [54](#i48f6bb8a75fb4f4aac48c282f86546fa_130)] | | |
| Item 8. | | | Financial Statements and Supplementary Data | | | [removed: [55](#i7aff0ae0d6a44232bab2ed60782f3ed2_136)] [added: [55](#i48f6bb8a75fb4f4aac48c282f86546fa_136)] | | |
| | | | Report of Independent Registered Public Accounting Firm (PCAOB ID No. 34) | | | [removed: [56](#i7aff0ae0d6a44232bab2ed60782f3ed2_139)] [added: [56](#i48f6bb8a75fb4f4aac48c282f86546fa_139)] | | |
| | | | Consolidated Financial Statements | | | [removed: [60](#i7aff0ae0d6a44232bab2ed60782f3ed2_145)] [added: [60](#i48f6bb8a75fb4f4aac48c282f86546fa_145)] | | |
| | | | Note 1. Organization, Basis of Presentation and Summary of Significant Accounting Policies | | | [removed: [72](#i7aff0ae0d6a44232bab2ed60782f3ed2_190)] [added: [72](#i48f6bb8a75fb4f4aac48c282f86546fa_190)] | | |
| | | | Note [removed: 3.] [added: 2.] Revenues | | | [removed: [79](#i7aff0ae0d6a44232bab2ed60782f3ed2_196)] [added: [77](#i48f6bb8a75fb4f4aac48c282f86546fa_196)] | | |
| | | | Note [removed: 4. Early Plant Retirements/Asset] [added: 3. Asset] Dispositions and Impairments | | | [removed: [84](#i7aff0ae0d6a44232bab2ed60782f3ed2_199)] [added: [82](#i48f6bb8a75fb4f4aac48c282f86546fa_199)] | | |
| | | | Note [removed: 5.] [added: 4.] Variable Interest [removed: Entities (VIEs)] [added: Entity (VIE)] | | | [removed: [85](#i7aff0ae0d6a44232bab2ed60782f3ed2_202)] [added: [82](#i48f6bb8a75fb4f4aac48c282f86546fa_202)] | | |
| | | | Note [removed: 6.] [added: 5.] Property, Plant and Equipment and Jointly-Owned Facilities | | | [removed: [86](#i7aff0ae0d6a44232bab2ed60782f3ed2_205)] [added: [83](#i48f6bb8a75fb4f4aac48c282f86546fa_205)] | | |
| | | | Note [removed: 7.] [added: 6.] Regulatory Assets and Liabilities | | | [removed: [87](#i7aff0ae0d6a44232bab2ed60782f3ed2_208)] [added: [84](#i48f6bb8a75fb4f4aac48c282f86546fa_208)] | | |
| | | | Note [removed: 8.] [added: 7.] Leases | | | [removed: [93](#i7aff0ae0d6a44232bab2ed60782f3ed2_211)] [added: [89](#i48f6bb8a75fb4f4aac48c282f86546fa_211)] | | |
| | | | Note [removed: 9.] [added: 8.] Long-Term Investments | | | [removed: [96](#i7aff0ae0d6a44232bab2ed60782f3ed2_214)] [added: [93](#i48f6bb8a75fb4f4aac48c282f86546fa_214)] | | |
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
If securities are registered pursuant to Section 12(b) of the Act, indicate by check mark whether the financial statements of the registrants included in the filing reflect the correction of an error to previously issued financial statements.
Indicate by check mark whether any of those error corrections are restatements that required a recovery analysis of incentive-based compensation received by any of the registrants’ executive officers during the relevant recovery period pursuant to §240.10D-1(b).
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
| Item 1C. | | | Cybersecurity | | | [30](#i48f6bb8a75fb4f4aac48c282f86546fa_3032) | | |
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
| | | | Signatures | | | [158](#i48f6bb8a75fb4f4aac48c282f86546fa_349) | | |
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
- any inability to extend certain significant contracts on terms acceptable to us;
- development, adoption and use of Artificial Intelligence by us and our third-party vendors;
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
- our ability to receive sufficient financial support for our New Jersey nuclear plants from the markets, production tax credit and/or zero emission certificates program;
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
| | | | Note 2. Recent Accounting Standards | | | [77](#i7aff0ae0d6a44232bab2ed60782f3ed2_193) | | |
| | | | Note 12. Intangibles | | | [104](#i7aff0ae0d6a44232bab2ed60782f3ed2_223) | | |
| | | | Signatures | | | [163](#i7aff0ae0d6a44232bab2ed60782f3ed2_349) | | |
- the impact of the coronavirus pandemic;
- reliance on transmission facilities to maintain adequate transmission capacity for our nuclear generation fleet;
- our ability to advocate for and our receipt of appropriate regulatory guidance to ensure long-term support for our nuclear fleet;
An excerpt. Shown here: 40 of 75 rewritten, all 14 added and all 6 removed. The counts are complete. For every sentence, read Cover and table of contents in the FY2023 filing and the FY2022 filing.
Page headers and footers: 7 lines differ, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
Item 1B. UNRESOLVED STAFF COMMENTS
0 rewritten, 0 added, 0 removed, 2 unchanged
Read the full itemFY2023 item · filed February 26, 2024FY2022 item · filed February 22, 2023
Page headers and footers: 1 line differs, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
Item 1C. CYBERSECURITY
0 rewritten, 74 added, 0 removed, 0 unchanged
New section this year
Read the full itemFY2023 item · filed February 26, 2024
In an effort to reduce the likelihood and severity of cybersecurity incidents, we have established a comprehensive cybersecurity program designed to protect and preserve the confidentiality, integrity and availability of our technology systems and our business operations more broadly.
For a discussion of the risks associated with cybersecurity threats, see Item 1A.
Risk Factors.
Risk Management and Strategy
Our processes for assessing, identifying, and managing material risks from cybersecurity threats include the following:
- Ongoing Assessment—The Cybersecurity Risk and Compliance department, led by the Managing Director, Chief Information Security Officer (CISO), and reporting to the SVP, Chief Information and Digital Officer (CIDO) is staffed with cyber professionals tasked with the day-to-day responsibility of assessing material risks from cybersecurity threats.
In addition, the Cyber Security Council, comprised of senior management, is kept apprised of the state of PSEG’s cybersecurity program, including any emerging risks, and provides guidance on the strategic directions of the program.
- Engagement of Third Parties—We engage third parties, such as security service providers, risk management firms and external legal counsels to assess material risks from cybersecurity threats and report on our internal incident response preparedness and cyber posture, support incident response, conduct tabletop exercises, and comply with applicable laws and regulations.
We also carry cybersecurity insurance that provides certain protection against losses from a cybersecurity incident.
Regulatory agencies, including but not limited to the NRC and Transportation Security Administration, as well as NERC, inspect applicable components of our cybersecurity program.
- Third-Party Service Provider Management—We maintain processes to oversee and identify risks from cybersecurity threats associated with our use of third-party service providers.
This includes a risk-based vendor management program, which incorporates robust security contractual provisions, vendor security assessments and, if appropriate, periodic audits.
- Technical Safeguards—We manage controls to protect our network perimeter, internal IT and Operational Technology (OT) environments, such as internal and external firewalls, network intrusion detection and prevention, penetration testing, vulnerability assessments, threat intelligence, anti-malware and access controls.
- Training and Awareness—We provide mandatory annual cybersecurity training for all personnel with network access, as well as additional education for personnel with access to industrial control systems or customer information systems; and conduct phishing exercises with progressive consequences for failures.
Employees also receive periodic cybersecurity awareness messages and each October, in recognition of Cybersecurity Awareness Month, are invited to presentations throughout the month from internal and external cyber experts covering diverse cyber topics.
These efforts better enable all employees to identify potential cybersecurity risks and escalate them appropriately.
- Incident Response Plans—We maintain and periodically update a cyber incident response plan that addresses the life cycle of a cybersecurity incident from a technical perspective (i.e., detection, response, and recovery), as well as a data breach response plan (with a focus on external communication/disclosure and legal compliance); and conduct regular tabletop exercises to test plan effectiveness (both internally and through external exercises).
- Mobile Security—We maintain controls to prevent loss of data through mobile device channels.
- Physical Security—We also maintain physical security measures to protect our OT systems, consistent with a defense in-depth and risk-tiered approach.
Such physical security measures may include access control systems, video surveillance, around-the-clock command center monitoring, and physical barriers (such as fencing, walls, and bollards).
Additional features of PSEG’s physical security program include threat intelligence, insider threat mitigation, background checks, a threat level advisory system, a business interruption management model, and active coordination with federal, state, and local law enforcement officials.
See Item 1.
Business.
Regulatory Issues—Federal Regulation for a discussion of Critical Infrastructure Protection standards that the NERC has promulgated that mitigate risk associated with both cybersecurity and physical security of PSEG’s critical facilities.
These processes are integral to our overall risk management system or processes and inform the identification and assessment
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
of risks and mitigations through our Enterprise Risk Management (ERM) program.
The ERM team, led by the SVP – Audit, Enterprise, Risk and Compliance (AERC) considers cybersecurity risks alongside other PSEG risks, and facilitates discussion with PSEG subject matter experts to identify cybersecurity risks, evaluate their potential severity and likelihood, identify mitigations, including those identified above, and assess the impact of those mitigations on residual risk.
In addition, PSEG maintains a Risk Management Committee (RMC), responsible for assessing exposure to and determining PSEG's overall risk management strategy, including with respect to cybersecurity.
The RMC, supported by the ERM function, is chaired by the SVP – AERC and consists of members of senior management including the CIDO and six other of the CEO’s direct reports.
In discharging its responsibilities related to cybersecurity threats, the RMC has received presentations from the CISO.
To date, there has been no material impact or reasonably likely material impact on our business strategy, results of operations or financial condition from these attacks or other cybersecurity incidents, including as a result of prior cybersecurity incidents.
Governance
–PSEG Board of Directors (Board) Oversight of Risks from Cybersecurity Threats:
- PSEG Board —The PSEG Board has ultimate responsibility for the oversight of risk management at PSEG, overseeing PSEG’s risk management program and reviewing the most significant risks facing PSEG, including cybersecurity risks.
The Governance, Nominating and Sustainability Committee of the PSEG Board reviews key enterprise risks, including cybersecurity risks, and recommends to the Board the mapping of each risk to an appropriate committee or the full Board, in accordance with the allocation of risk categories reflected in the charter of each committee.
Through this process, cybersecurity risk is mapped primarily to the Board’s Industrial Operations Committee (IOC), and also the Audit Committee.
In providing oversight of risks from cybersecurity threats, the Board is informed of cybersecurity incidents as appropriate, by way of updates from Senior Management, pursuant to PSEG’s Cybersecurity Event Escalation and Incident Response Practice, as administered by the CISO.
- IOC—At the PSEG Board level, the IOC holds the primary responsibility, as enumerated in its charter, of overseeing PSEG’s cybersecurity program and assessing overall compliance through active, independent and critical oversight.
The IOC is informed about cybersecurity risks by the CIDO and/or the CISO, during the IOC’s four regularly scheduled meetings a year, which each include cybersecurity as a standing agenda item.
An excerpt. Shown here: all 0 rewritten, 40 of 74 added and all 0 removed. The counts are complete. For every sentence, read Item 1C. CYBERSECURITY in the FY2023 filing.
Item 2. PROPERTIES
10 rewritten, 3 added, 4 removed, 20 unchanged
Read the full itemFY2023 item · filed February 26, 2024FY2022 item · filed February 22, 2023
As of December 31, [removed: 2022,] [added: 2023,] PSE&G’s electric T&D system included approximately 25,000 circuit miles, and [removed: 864,000] [added: 866,000] poles, of which 64% are jointly-owned.
In addition, PSE&G owns and operates [removed: 55] [added: 56] switching stations with an aggregate installed capacity of [removed: 39,653] [added: 39,953] megavolt-amperes (MVA) and 235 substations with an aggregate installed capacity of [removed: 9,735] [added: 10,382] MVA.
As of December 31, [removed: 2022,] [added: 2023,] PSE&G’s gas system included approximately 18,000 miles of gas mains, 12 gas distribution headquarters, two sub-headquarters, and one meter shop serving all of its gas territory in New Jersey.
The daily gas capacity of these peaking facilities (the maximum daily gas delivery available during the three peak winter months) is approximately [removed: 2.8] [added: 2.9] million therms in the aggregate.
As of December 31, [removed: 2022,] [added: 2023,] PSE&G owned 158 MW dc of installed PV solar capacity throughout New Jersey.
As of December 31, [removed: 2022,] [added: 2023,] PSEG Power’s share of installed nuclear generating capacity is shown in the following
| | | | Name | | | | | | Location | | | | | | Total Capacity (MW) | | | | | | % Owned | | | | | | Owned Capacity (MW) | | | | | | [removed: Principal Fuels Used] | | | | | | [removed: | | | | | |]
| | | | Nuclear: | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | [removed: | | | | | |]
| | | | Hope Creek | | | | | | NJ | | | | | | [removed: 1,173] [added: 1,174] | | | | | | 100% | | | | | | [removed: 1,173 | | | | | | Nuclear] [added: 1,174] | | | | | | | | | | | |
| | | | Peach Bottom 2 & 3 (A) | | | | | | PA | | | | | | 2,549 | | | | | | 50% | | | | | | 1,275 | | | | | | [removed: Nuclear] | | | | | | [removed: | | | | | |]
Note 13.
| | | | Salem 1 & 2 | | | | | | NJ | | | | | | 2,287 | | | | | | 57% | | | | | | 1,312 | | | | | | | | | | | |
| | | | Total Nuclear | | | | | | | | | | | | 6,010 | | | | | | | | | | | | 3,761 | | | | | | | | | | | |
Note 15.
| | | | Salem 1 & 2 | | | | | | NJ | | | | | | 2,295 | | | | | | 57% | | | | | | 1,318 | | | | | | Nuclear | | | | | | | | | | | |
| | | | Total Nuclear | | | | | | | | | | | | 6,017 | | | | | | | | | | | | 3,766 | | | | | | | | | | | | | | | | | |
As of December 31, 2022, PSEG Power owned a 50% interest (104 MW) in a generation facility in Hawaii.
Item 5. MARKET FOR REGISTRANT’S COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES
9 rewritten, 7 added, 15 removed, 10 unchanged
Read the full itemFY2023 item · filed February 26, 2024FY2022 item · filed February 22, 2023
Our common stock is listed on the New York Stock Exchange, Inc. under the trading symbol “PEG.” As of February [removed: 17, 2023,] [added: 16, 2024,] there were [removed: 50,146] [added: 47,943] registered holders.
The following graph shows a comparison of the five-year cumulative return assuming $100 invested on December 31, [removed: 2017] [added: 2018] in our common stock and the subsequent reinvestment of quarterly dividends, the S&P Composite Stock Price Index, the Dow Jones Utilities Index and the S&P Electric Utilities Index.
| | | | | | | | | | [removed: 2017] [added: 2018] | | | | | | [removed: 2018] [added: 2019] | | | | | | [removed: 2019] [added: 2020] | | | | | | [removed: 2020] [added: 2021] | | | | | | [removed: 2021] [added: 2022] | | | | | | [removed: 2022] [added: 2023] | | | | | |
[removed: ][added: ]
On February [removed: 14, 2023,] [added: 13, 2024,] our Board of Directors approved a [removed: $0.57] [added: $0.60] per share common stock dividend for the first quarter of [removed: 2023.][added: 2024.]
This reflects an indicative annual dividend rate of [removed: $2.28] [added: $2.40] per share.
The following table indicates the securities authorized for issuance under equity compensation plans as of December 31, [removed: 2022:][added: 2023:]
| | | | Equity Compensation Plans Approved by Security Holders | | | | | | — | | | | | | $ | — | | | | | [removed: 9,085,980] [added: 8,162,450] | | | | | |
The number of shares available for future issuance includes amounts remaining under our 2021 Long-Term Incentive Plan (2021 LTIP) and 2021 Equity Compensation Plan for Outside Directors and [removed: ESPP] [added: the Employee Stock Purchase Plan] and reflect a reduction for non-vested restricted stock units and performance share units (PSUs) (assumed at target payout).
| | | | PSEG | | | | | | $ | 100.00 | | | | | $ | 117.08 | | | | | $ | 119.88 | | | | | $ | 141.85 | | | | | $ | 134.62 | | | | | $ | 139.49 | | | | |
| | | | S&P 500 | | | | | | $ | 100.00 | | | | | $ | 131.47 | | | | | $ | 155.65 | | | | | $ | 200.29 | | | | | $ | 163.98 | | | | | $ | 207.04 | | | | |
| | | | DJ Utilities | | | | | | $ | 100.00 | | | | | $ | 127.30 | | | | | $ | 129.44 | | | | | $ | 152.04 | | | | | $ | 155.15 | | | | | $ | 146.94 | | | | |
| | | | S&P Utilities | | | | | | $ | 100.00 | | | | | $ | 126.35 | | | | | $ | 127.01 | | | | | $ | 149.46 | | | | | $ | 151.79 | | | | | $ | 141.05 | | | | |
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
| | | | Total | | | | | | — | | | | | | $ | — | | | | | 8,162,450 | | | | | |
Note 18.
| | | | PSEG | | | | | | $ | 100.00 | | | | | $ | 104.67 | | | | | $ | 122.55 | | | | | $ | 125.47 | | | | | $ | 148.47 | | | | | $ | 140.91 | | | | |
| | | | S&P 500 | | | | | | $ | 100.00 | | | | | $ | 95.61 | | | | | $ | 125.70 | | | | | $ | 148.81 | | | | | $ | 191.48 | | | | | $ | 156.77 | | | | |
| | | | DJ Utilities | | | | | | $ | 100.00 | | | | | $ | 101.99 | | | | | $ | 129.82 | | | | | $ | 132.01 | | | | | $ | 155.06 | | | | | $ | 158.23 | | | | |
| | | | S&P Utilities | | | | | | $ | 100.00 | | | | | $ | 104.11 | | | | | $ | 131.54 | | | | | $ | 132.23 | | | | | $ | 155.60 | | | | | $ | 158.03 | | | | |
In September 2021, PSEG announced a $500 million share repurchase program authorized by the Board of Directors.
Under this authorization, during January and through mid-February 2022, PSEG purchased approximately 3.8 million shares of
common stock pursuant to an open market share repurchase plan and during March through mid-May, PSEG purchased an additional 3.6 million shares pursuant to an accelerated share repurchase agreement.
See Item 8.
Note 24.
Earnings Per Share (EPS) and Dividends for additional information.
From time to time, PSEG may repurchase shares to satisfy obligations under equity compensation awards and repurchase shares to satisfy purchases by employees under the Employee Stock Purchase Plan (ESPP).
In December 2022, for such purposes, we entered into a share repurchase plan that complies with Rule 10b5-1 under the Securities Exchange Act of 1934, as amended.
There were no common share repurchases in the open market during the fourth quarter of 2022.
| | | | Total | | | | | | — | | | | | | $ | — | | | | | 9,085,980 | | | | | |
Note 20.
Page headers and footers: 1 line differs, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
Item 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA
1,130 rewritten, 296 added, 489 removed, 1,784 unchanged
Read the full itemFY2023 item · filed February 26, 2024FY2022 item · filed February 22, 2023
We have audited the accompanying consolidated balance sheets of Public Service Enterprise Group Incorporated and subsidiaries (the “Company” or PSEG) as of December 31, [removed: 2022] [added: 2023] and [removed: 2021,] [added: 2022,] the related consolidated statements of operations, comprehensive income (loss), stockholders' equity, and cash flows, for each of the three years in the period ended December 31, [removed: 2022,] [added: 2023,] the related notes and the consolidated financial statement schedule listed in the Index at Item 15(B)(a) (collectively referred to as the “financial statements”).
In our opinion, the financial statements present fairly, in all material respects, the financial position of the Company as of December 31, [removed: 2022] [added: 2023] and [removed: 2021,] [added: 2022,] and the results of its operations and its cash flows for each of the three years in the period ended December 31, [removed: 2022,] [added: 2023,] in conformity with accounting principles generally accepted in the United States of America.
We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States) (PCAOB), the Company's internal control over financial reporting as of December 31, [removed: 2022,] [added: 2023,] based on criteria established in *Internal Control — Integrated Framework (2013)* issued by the Committee of Sponsoring Organizations of the Treadway Commission, and our report dated February [removed: 21, 2023,] [added: 26, 2024,] expressed an unqualified opinion on the Company's internal control over financial reporting.
Accounting for the Effects of Regulation – Refer to Notes 1 and [removed: 7] [added: 6] to the financial statements
[removed: PSEG’s subsidiary, Public Service Electric and Gas Company (PSE&G),] [added: PSE&G] is [removed: regulated] [added: subject to regulation] by the New Jersey Board of Public Utilities [removed: (BPU) and] [added: (BPU),] the Federal Energy Regulatory Commission [removed: (FERC), which have jurisdiction with respect to PSE&G’s electric] [added: (FERC)] and [removed: gas distribution] [added: other federal] and [removed: electric transmission businesses, respectively.][added: New Jersey state regulators.]
Management believes that PSE&G’s transmission and distribution businesses continue to meet the accounting requirements for rate-regulated entities, and PSE&G’s financial statements reflect the economic effects of [removed: cost-based rate] regulation.
This accounting [removed: can result] [added: results] in the recognition of revenues and expenses in different time periods than that of enterprises that are not regulated.
[removed: Further, regulatory] [added: Regulatory] assets and other investments and costs incurred under various [added: infrastructure] filings and clause mechanisms are subject to prudence reviews and can be disallowed in the future by regulatory authorities.
[added: collection of any infrastructure or clause mechanism revenue, regulatory assets or payments of regulatory liabilities is no] longer probable, the amounts would be charged or credited to income.
| [added: | | |] February [removed: 21,] [added: 14,] 2023 | | | [added: | | | 4.24% | | | | | | 25.09% | | | | | |]
We have audited the accompanying consolidated balance sheets of Public Service Electric and Gas Company and subsidiaries (the [removed: "Company"] [added: “Company”] or PSE&G) as of December 31, [removed: 2022] [added: 2023] and [removed: 2021,] [added: 2022,] the related consolidated statements of operations, comprehensive income, common stockholder’s equity, and cash flows, for each of the three years in the period ended December 31, [removed: 2022,] [added: 2023,] the related notes and the consolidated financial statement schedule listed in the Index at Item 15(B)(b) (collectively referred to as the [removed: "financial statements").][added: “financial statements”).]
In our opinion, the financial statements present fairly, in all material respects, the financial position of the Company as of December 31, [removed: 2022] [added: 2023] and [removed: 2021,] [added: 2022,] and the results of its operations and its cash flows for each of the three years in the period ended December 31, [removed: 2022,] [added: 2023,] in conformity with accounting principles generally accepted in the United States of America.
Accounting for the Effects of Regulation – Refer to Notes 1 and [removed: 7] [added: 6] to the financial statements
Management believes that PSE&G’s transmission and distribution businesses continue to meet the accounting requirements for rate-regulated entities, and PSE&G’s financial statements reflect the economic effects of [removed: cost-based rate] regulation.
This accounting [removed: can result] [added: results] in the recognition of revenues and expenses in different time periods than that of enterprises that are not regulated.
[removed: Further, regulatory] [added: Regulatory] assets and other investments and costs incurred under various [added: infrastructure] filings and clause mechanisms are subject to prudence reviews and can be disallowed in the future by regulatory authorities.
[removed: To the extent that] collection of [removed: revenue] [added: any infrastructure] or [added: clause mechanism revenue,] regulatory assets or payments of regulatory liabilities is no longer probable, the amounts would be charged or credited to income.
| | | | [added: Year Ended December 31, 2023] | | | | | | [removed: Years Ended December 31,] | | | | | | | | | | | | | | | | | | [added: | | |]
| | | | | | | | | | [removed: 2022] [added: 2023] | | | | | | [removed: 2021] [added: 2022] | | | | | | [removed: 2020] [added: 2021] | | | | | |
| | | | OPERATING REVENUES | | | | | | $ | [removed: 9,800] [added: 11,237] | | | | | $ | [removed: 9,722] [added: 9,800] | | | | | $ | [removed: 9,603] [added: 9,722] | | | | |
| | | | Energy Costs | | | | | | [removed: 4,018] [added: 3,260] | | | | | | [removed: 3,499] [added: 4,018] | | | | | | [removed: 3,056] [added: 3,499] | | | | | |
| | | | Operation and Maintenance | | | | | | [removed: 3,178] [added: 3,150] | | | | | | [removed: 3,226] [added: 3,178] | | | | | | [removed: 3,115] [added: 3,226] | | | | | |
| | | | Depreciation and Amortization | | | | | | [removed: 1,100] [added: 1,135] | | | | | | [removed: 1,216] [added: 1,100] | | | | | | [removed: 1,285] [added: 1,216] | | | | | |
| | | | (Gains) Losses on Asset Dispositions and Impairments | | | | | | [removed: 123] [added: 7] | | | | | | [removed: 2,637] [added: 123] | | | | | | [removed: (123)] [added: 2,637] | | | | | |
| | | | Total Operating Expenses | | | | | | [removed: 8,419] [added: 7,552] | | | | | | [removed: 10,578] [added: 8,419] | | | | | | [removed: 7,333] [added: 10,578] | | | | | |
| | | | OPERATING INCOME (LOSS) | | | | | | [removed: 1,381] [added: 3,685] | | | | | | [removed: (856)] [added: 1,381] | | | | | | [removed: 2,270] [added: (856)] | | | | | |
| | | | Income from Equity Method Investments | | | | | | [removed: 14] [added: 1] | | | | | | [removed: 16] [added: 14] | | | | | | [removed: 14] [added: 16] | | | | | |
| | | | Net Gains (Losses) on Trust Investments | | | | | | [removed: (265)] [added: 189] | | | | | | [removed: 194] [added: (265)] | | | | | | [removed: 253] [added: 194] | | | | | |
| | | | [added: Net] Other Income (Deductions) | | | | | | [removed: 124] [added: 172] | | | | | | [removed: 98] [added: 124] | | | | | | [removed: 115] [added: 98] | | | | | |
| | | | Net Non-Operating Pension and Other Postretirement Benefit (OPEB) [removed: Credits] (Costs) [added: Credits] | | | | | | [removed: 376] [added: (218)] | | | | | | [removed: 328] [added: 376] | | | | | | [removed: 249] [added: 328] | | | | | |
| | | | Loss on Extinguishment of Debt | | | | | | — | | | | | | [removed: (298)] [added: —] | | | | | | [removed: —] [added: (298)] | | | | | |
| | | | Interest Expense | | | | | | [removed: (628)] [added: (748)] | | | | | | [removed: (571)] [added: (628)] | | | | | | [removed: (600)] [added: (571)] | | | | | |
| | | | INCOME (LOSS) BEFORE INCOME TAXES | | | | | | [removed: 1,002] [added: 3,081] | | | | | | [removed: (1,089)] [added: 1,002] | | | | | | [removed: 2,301] [added: (1,089)] | | | | | |
| | | | Income Tax [removed: Benefit] (Expense) [added: Benefit] | | | | | | [removed: 29] [added: (518)] | | | | | | [removed: 441] [added: 29] | | | | | | [removed: (396)] [added: 441] | | | | | |
| | | | NET INCOME (LOSS) | | | | | | $ | [removed: 1,031] [added: 2,563] | | | | | $ | [removed: (648)] [added: 1,031] | | | | | $ | [removed: 1,905] [added: (648)] | | | | |
| | | | BASIC | | | | | | 498 | | | | | | [removed: 504] [added: 498] | | | | | | 504 | | | | | |
| | | | DILUTED | | | | | | [removed: 501] [added: 500] | | | | | | [removed: 504] [added: 501] | | | | | | [removed: 507] [added: 504] | | | | | |
| | | | BASIC | | | | | | $ | [removed: 2.07] [added: 5.15] | | | | | $ | [removed: (1.29)] [added: 2.07] | | | | | $ | [removed: 3.78] [added: (1.29)] | | | | |
| | | | DILUTED | | | | | | $ | [removed: 2.06] [added: 5.13] | | | | | $ | [removed: (1.29)] [added: 2.06] | | | | | $ | [removed: 3.76] [added: (1.29)] | | | | |
| | | | | | | | | | [removed: 2022] [added: 2023] | | | | | | [removed: 2021] [added: 2022] | | | | | | [removed: 2020] [added: 2021] | | | | | |
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
PSEG’s subsidiary, Public Service Electric and Gas Company (PSE&G), prepares its financial statements to comply with GAAP for rate-regulated enterprises, which differs in some respects from accounting for non-regulated businesses.
PSE&G defers the recognition of costs as a regulatory asset or records the recognition of obligations as a regulatory liability if it is probable that, through the rate-making process, there will be a corresponding increase or decrease in future rates.
To the extent that
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
PSE&G prepares its financial statements to comply with GAAP for rate-regulated enterprises, which differs in some respects from accounting for non-regulated businesses.
PSE&G has deferred certain costs based on rate orders issued by the New Jersey Board of Public Utilities (“BPU”) or Federal Energy Regulatory Commission (“FERC”) or based on PSE&G’s experience with prior rate proceedings.
PSE&G defers the recognition of costs as a regulatory asset or records the recognition of obligations as a regulatory liability if it is probable that, through the rate-making process, there will be a corresponding increase or decrease in future rates.
To the extent that
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
| February 26, 2024 | | |
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
| | | | Other | | | 342 | | | | | | 285 | | | | | |
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
| | | | Energy Efficiency Programs Regulatory Investment Expenditures | | | | | | (466) | | | | | | (286) | | | | | | (117) | | | | | |
| | | | Amortization of Energy Efficiency Programs Regulatory Investment Expenditures | | | | | | 82 | | | | | | 48 | | | | | | 31 | | | | | |
| | | | Proceeds from Sales of Equity Method Investments | | | | | | 291 | | | | | | — | | | | | | — | | | | | |
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
| | | | Balance as of December 31, 2023 | | | | | | 534 | | | | | | $ | 5,018 | | | | | (36) | | | | | | $ | (1,379) | | | | | $ | 12,017 | | | | | $ | (179) | | | | | $ | 15,477 | | | | |
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
| | | | Commercial Paper and Loans | | | 425 | | | | | | — | | | | | |
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
| | | | Energy Efficiency Programs Regulatory Investment Expenditures | | | | | | (466) | | | | | | (286) | | | | | | (117) | | | | | |
| | | | Amortization of Energy Efficiency Programs Regulatory Investment Expenditures | | | | | | 82 | | | | | | 48 | | | | | | 31 | | | | | |
[Table of Conte](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[n](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[t](#i48f6bb8a75fb4f4aac48c282f86546fa_7)[s](#i48f6bb8a75fb4f4aac48c282f86546fa_7)
| | | | Net Income | | | | | | — | | | | | | — | | | | | | | | | | | | 1,515 | | | | | | — | | | | | | 1,515 | | | | | |
| | | | Balance as of December 31, 2023 | | | | | | $ | 892 | | | | | $ | 2,156 | | | | | | | | | | | $ | 14,004 | | | | | $ | (4) | | | | | $ | 17,048 | | | | |
Certain reclassifications have been made to prior year financial statements to conform with current year presentation.
These reclassifications had no impact on PSEG’s or PSE&G’s results of operations, financial condition or cash flows.
Equity investments that do not qualify for consolidation or equity method accounting are recorded at fair value or, if fair value is not readily determinable, are initially recognized at cost and subsequently remeasured if there is an orderly transaction in an identical or similar investment of the same issuer or if the investment is impaired.
| | | | As of December 31, 2023 | | | | | | | | | | | | | | | | | | | | |
The unbilled revenue is estimated each month based on usage per day, the number
| | | | | | | | | | Average Rate | | | | | | | | | | | | | | | | | |
As a utility subject to cost-based rate regulation, PSE&G is required to defer the recognition of costs as a regulatory asset or recognize obligations as a regulatory liability if the rates established are designed to recover the costs and if it is probable that such rates can be charged or collected in future periods.
To the extent that collection of revenue or regulatory assets or payments of regulatory liabilities is no
Significant judgment can be required to determine if otherwise recognizable revenues and incurred costs qualify to be presented as a regulatory asset or liability.
As of December 31, 2022, PSE&G has approximately $4.8 billion and $2.6 billion recorded as regulatory assets and regulatory liabilities, respectively.
These judgments include assumptions regarding the outcome of future decisions by the BPU or FERC.
PSE&G is regulated by the New Jersey Board of Public Utilities (BPU) and the Federal Energy Regulatory Commission (FERC), which have jurisdiction with respect to PSE&G’s electric and gas distribution and electric transmission businesses, respectively.
As a utility subject to cost-based rate regulation, PSE&G is required to defer the recognition of costs as a regulatory asset or recognize obligations as a regulatory liability if the rates established are designed to recover the costs and if it is probable that such rates can be charged or collected in future periods.
Significant judgment can be required to determine if
otherwise recognizable revenues and incurred costs qualify to be presented as a regulatory asset or liability.
As of December 31, 2022, PSE&G has approximately $4.8 billion and $2.6 billion recorded as regulatory assets and regulatory liabilities, respectively.
These judgments include assumptions regarding the outcome of future decisions by the BPU or FERC.
| February 21, 2023 | | |
| | | | Intangibles | | | 14 | | | | | | 20 | | | | | |
| | | | Other | | | 271 | | | | | | 234 | | | | | |
| | | | Liabilities Held for Sale | | | — | | | | | | 144 | | | | | |
| | | | Leveraged Lease (Income), (Gains) and Losses, Adjusted for Rents Received and Deferred Taxes | | | | | | 15 | | | | | | (11) | | | | | | (135) | | | | | |
| | | | Balance as of December 31, 2019 | | | | | | 534 | | | | | | $ | 5,003 | | | | | (30) | | | | | | $ | (831) | | | | | $ | 11,406 | | | | | $ | (489) | | | | | $ | 15,089 | | | | |
| | | | Cumulative Effect Adjustment for Current Expected Credit Losses (CECL) | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | (2) | | | | | | — | | | | | | (2) | | | | | |
| | | | Basis Adjustment | | | 986 | | | | | | 986 | | | | | |
| | | | Contributed Capital | | | | | | — | | | | | | — | | | | | | 75 | | | | | |
| | | | Balance as of December 31, 2019 | | | | | | $ | 892 | | | | | $ | 1,095 | | | | | $ | 986 | | | | | $ | 8,928 | | | | | $ | 2 | | | | | $ | 11,903 | | | | |
| | | | Cumulative Effect Adjustment for CECL | | | | | | — | | | | | | — | | | | | | — | | | | | | (2) | | | | | | — | | | | | | (2) | | | | | |
| | | | Contributed Capital | | | | | | — | | | | | | 75 | | | | | | — | | | | | | — | | | | | | — | | | | | | 75 | | | | | |
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
The transaction closed in June 2021.
In August 2021, PSEG entered into two agreements to sell PSEG Power’s 6,750 megawatts (MW) fossil generating portfolio to newly formed subsidiaries of ArcLight Energy Partners Fund VII, L.P., a fund controlled by ArcLight Capital Partners, LLC.
In February 2022, PSEG completed the sale of this fossil generating portfolio.
Early Plant Retirements/Asset Dispositions and Impairments for more details on the transactions.
For investments in which significant influence does not exist and the investor is not the primary beneficiary, the cost method of accounting is applied.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
periods.
| | | | As of December 31, 2021 | | | | | | | | | | | | | | | | | | | | |
For fair value hedges, changes in fair values for both the derivative and the underlying hedged exposure are recognized in earnings each period.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
Contracts that qualify for, and are designated, as NPNS are accounted for upon settlement.
Contracts which qualify for NPNS are contracts for which physical delivery is probable, they will not be financially settled, and the quantities under contract are expected to be used or sold in the normal course of business over a reasonable period of time.
If a contract no longer meets the requirements for NPNS designation, the changes in fair value since inception, and ongoing changes, of the contract and similar contracts in that portfolio, are recorded in current period earnings.
| | | | | | | | | | Avg Rate | | | | | | Avg Rate | | | | | | Avg Rate | | | | | |
The
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
An excerpt. Shown here: 40 of 1,130 rewritten, 40 of 296 added and 40 of 489 removed. The counts are complete. For every sentence, read Item 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA in the FY2023 filing and the FY2022 filing.
Page headers and footers: 96 lines differ, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
[Table of Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)
Shown here: 40 of 75 changed, all 0 added and all 21 removed.
Item 9A. CONTROLS AND PROCEDURES
4 rewritten, 0 added, 0 removed, 9 unchanged
Read the full itemFY2023 item · filed February 26, 2024FY2022 item · filed February 22, 2023
We have conducted assessments of our internal control over financial reporting as of December 31, [removed: 2022,] [added: 2023,] as required by Section 404 of the Sarbanes-Oxley Act, using the framework promulgated by the Committee of Sponsoring Organizations of the Treadway Commission, commonly referred to as “COSO.” Managements’ reports on PSEG’s and PSE&G’s internal control over financial reporting are included on pages [removed: 152] [added: 147] and [removed: 153,] [added: 148,] respectively.
The Independent Registered Public Accounting Firm’s report with respect to the effectiveness of PSEG’s internal control over financial reporting is included on page [removed: 154.][added: 149.]
Management has concluded that internal control over financial reporting is effective as of December 31, [removed: 2022.][added: 2023.]
There have been no changes in internal control over financial reporting that occurred during the fourth quarter of [removed: 2022] [added: 2023] that have materially affected, or are reasonably likely to materially affect, each registrant’s internal control over financial reporting.
Item 9B. OTHER INFORMATION
0 rewritten, 2 added, 1 removed, 0 unchanged
Read the full itemFY2023 item · filed February 26, 2024FY2022 item · filed February 22, 2023
Director and Officer Rule 10b5-1 and non-Rule 10b5-1 Trading Plans
During the three months ended December 31, 2023, none of PSEG’s directors or officers adopted, terminated or modified a Rule 10b5-1 trading arrangement or non-Rule 10b5-1 trading arrangement (as such terms are defined in Item 408 of Regulation S-K of the Securities Act of 1933).
None.
Item 9C. DISCLOSURE REGARDING FOREIGN JURISDICTIONS THAT PREVENT INSPECTIONS
9 rewritten, 3 added, 3 removed, 46 unchanged
Read the full itemFY2023 item · filed February 26, 2024FY2022 item · filed February 22, 2023
Based on the assessment performed, management has concluded that PSEG’s internal control over financial reporting is effective and provides reasonable assurance regarding the reliability of PSEG’s financial reporting and the preparation of its financial statements as of December 31, [removed: 2022] [added: 2023] in accordance with generally accepted accounting principles.
Further, management has not identified any material weaknesses in internal control over financial reporting as of December 31, [removed: 2022.][added: 2023.]
PSEG’s external auditors, Deloitte & Touche LLP, have audited PSEG’s financial statements for the year ended December 31, [removed: 2022] [added: 2023] included in this annual report on Form 10-K and, as part of that audit, have issued a report on the effectiveness of PSEG’s internal control over financial reporting, a copy of which is included in this annual report on Form 10-K.
Based on the assessment performed, management has concluded that PSE&G’s internal control over financial reporting is effective and provides reasonable assurance regarding the reliability of PSE&G’s financial reporting and the preparation of its financial statements as of December 31, [removed: 2022] [added: 2023] in accordance with generally accepted accounting principles.
Further, management has not identified any material weaknesses in internal control over financial reporting as of December 31, [removed: 2022.][added: 2023.]
We have audited the internal control over financial reporting of Public Service Enterprise Group Incorporated and subsidiaries (the “Company” or [removed: “PSEG”)] [added: PSEG)] as of December 31, [removed: 2022,] [added: 2023,] based on criteria established in *Internal Control — Integrated Framework (2013)* issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO).
In our opinion, the Company maintained, in all material respects, effective internal control over financial reporting as of December 31, [removed: 2022,] [added: 2023,] based on criteria established in [removed: Internal] [added: *Internal] Control — Integrated Framework [removed: (2013)] [added: (2013)*] issued by COSO.
We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States) (PCAOB), the consolidated financial statements and the consolidated financial statement schedule listed in the Index at Item 15(B)(a) as of and for the year ended December 31, [removed: 2022] [added: 2023,] of the Company and our report dated February [removed: 21, 2023] [added: 26, 2024,] expressed an unqualified opinion on those financial statements.
We are a public accounting firm registered with the PCAOB and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the [removed: PCAOB.][added: PCAOB]
| February 26, 2024 | | | | | |
| February 26, 2024 | | | | | |
February 26, 2024
| February 21, 2023 | | | | | |
| February 21, 2023 | | | | | |
February 21, 2023
Page headers and footers: 4 lines differ, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
Item 10. DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE
3 rewritten, 0 added, 1 removed, 26 unchanged
Read the full itemFY2023 item · filed February 26, 2024FY2022 item · filed February 22, 2023
The information required by Item 10 of Form 10-K with respect to (i) present directors of PSEG who are nominees for election as directors at PSEG’s [removed: 2023] [added: 2024] Annual Meeting of Stockholders, (ii) the director nomination process, and (iii) the composition of the Audit Committee of the Board, is set forth under the headings “Nominees For Director-Biographical Information,” “Overview of Board Nominees-Board Refreshment and Tenure,” and “-Board Membership Selection,” and “Corporate Governance-Board Committees,” respectively, in PSEG’s definitive Proxy Statement for such Annual Meeting of Stockholders, which definitive Proxy Statement is expected to be filed with the U.S. Securities and Exchange Commission (SEC) on or about March [removed: 9, 2023] [added: 7, 2024] and which information set forth under said heading is incorporated herein by this reference thereto.
The Standards are posted on our website, [removed: https://corporate.pseg.com/aboutpseg/leadershipandgovernance/standardsofconduct.][added: https://corporate.pseg.com/aboutpseg/leadershipandgovernance/standardsofconduct You can get a free copy of the Standards by making an oral or written request directed to:]
In [removed: 2022,] [added: 2023,] we did not grant any waivers to the Standards.
You can get a free copy of the Standards by making an oral or written request directed to:
Page headers and footers: 1 line differs, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
Item 11. EXECUTIVE COMPENSATION
1 rewritten, 0 added, 0 removed, 3 unchanged
Read the full itemFY2023 item · filed February 26, 2024FY2022 item · filed February 22, 2023
The information required by Item 11 of Form 10-K is set forth in PSEG’s definitive Proxy Statement for the [removed: 2023] [added: 2024] Annual Meeting of Stockholders which definitive Proxy Statement is expected to be filed with the SEC on or about March [removed: 9, 2023] [added: 7, 2024] and such information that is responsive to this Item 11, except for information set forth under the heading “Pay Versus Performance,” is incorporated herein by this reference thereto.
Item 12. SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS
1 rewritten, 0 added, 0 removed, 6 unchanged
Read the full itemFY2023 item · filed February 26, 2024FY2022 item · filed February 22, 2023
The information required by Item 12 of Form 10-K with respect to directors, executive officers and certain beneficial owners is set forth under the heading “Security Ownership of Directors, Management and Certain Beneficial Owners” in PSEG’s definitive Proxy Statement for the [removed: 2023] [added: 2024] Annual Meeting of Stockholders which definitive Proxy Statement is expected to be filed with the SEC on or about March [removed: 9, 2023] [added: 7, 2024] and such information set forth under such heading is incorporated herein by this reference thereto.
Item 13. CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND
1 rewritten, 0 added, 0 removed, 4 unchanged
Read the full itemFY2023 item · filed February 26, 2024FY2022 item · filed February 22, 2023
The information required by Item 13 of Form 10-K is set forth under the heading “Corporate Governance-Certain Relationships and Related Person Transactions” in PSEG’s definitive Proxy Statement for the [removed: 2023] [added: 2024] Annual Meeting of Stockholders which definitive Proxy Statement is expected to be filed with the SEC on or about March [removed: 9, 2023] [added: 7, 2024] and such information set forth under such heading is incorporated herein by this reference thereto.
Item 14. PRINCIPAL ACCOUNTANT FEES AND SERVICES
1 rewritten, 0 added, 0 removed, 2 unchanged
Read the full itemFY2023 item · filed February 26, 2024FY2022 item · filed February 22, 2023
The information required by Item 14 of Form 10-K is set forth under the heading “Oversight of the Independent Auditor-Fees Billed by Deloitte for [removed: 2022] [added: 2023] and [removed: 2021”] [added: 2022”] in PSEG’s definitive Proxy Statement for the [removed: 2023] [added: 2024] Annual Meeting of Stockholders which definitive Proxy Statement is expected to be filed with the SEC on or about March [removed: 9, 2023.][added: 7, 2024.]
Page headers and footers: 1 line differs, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
Item 15. EXHIBITS, FINANCIAL STATEMENT SCHEDULES
134 rewritten, 20 added, 15 removed, 116 unchanged
Read the full itemFY2023 item · filed February 26, 2024FY2022 item · filed February 22, 2023
a.Public Service Enterprise Group Incorporated’s Consolidated Balance Sheets as of December 31, [removed: 2022] [added: 2023] and [removed: 2021] [added: 2022] and the related Consolidated Statements of Operations, Comprehensive Income, Cash Flows and Stockholders’ Equity for the three years ended December 31, [removed: 2022] [added: 2023] on pages 60 through 65.
b.Public Service Electric and Gas Company’s Consolidated Balance Sheets as of December 31, [removed: 2022] [added: 2023] and [removed: 2021] [added: 2022] and the related Consolidated Statements of Operations, Comprehensive Income, Cash Flows and Common Stockholder’s Equity for the three years ended December 31, [removed: 2022] [added: 2023] on pages 66 through 71.
Schedule II—Valuation and Qualifying Accounts for each of the three years in the period ended December 31, [removed: 2022] [added: 2023] (page [removed: 162).][added: 157).]
Schedule II—Valuation and Qualifying Accounts for each of the three years in the period ended December 31, [removed: 2022] [added: 2023] (page [removed: 162).][added: 157).]
| [3d](http://www.sec.gov/Archives/edgar/data/788784/000119312523042013/d469440dex31.htm) | | | | | | [By-Laws of Public Service Enterprise Group Incorporated [removed: effective](http://www.sec.gov/Archives/edgar/data/788784/000119312523042013/d469440dex31.htm) [February] [added: effective February] 14, 2023](http://www.sec.gov/Archives/edgar/data/788784/000119312523042013/d469440dex31.htm)(4) | | |
| [removed: [10a(5)](http://www.sec.gov/Archives/edgar/data/81033/000078878419000005/pseg12312018-ex10a5employe.htm)] [added: [10a(19)](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex10a19-deferredcompensati.htm)] | | | | | | [Deferred Compensation Plan for Certain Employees, amended and restated effective [removed: January 1, 2019](http://www.sec.gov/Archives/edgar/data/81033/000078878419000005/pseg12312018-ex10a5employe.htm)(12)] [added: November 20, 2023](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex10a19-deferredcompensati.htm)] | | |
| [removed: [10a(6)](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex10a6micp2022.htm)] [added: [10a(20)](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex10a20-managementincentiv.htm)] | | | | | | [Management Incentive Compensation [removed: Plan](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex10a6micp2022.htm)] [added: Plan, amended and effective January 1, 2024](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex10a20-managementincentiv.htm)] | | |
| [removed: [10a(7)](http://www.sec.gov/Archives/edgar/data/788784/000119312522200082/d841106dex101.htm)] [added: [10a(](http://www.sec.gov/Archives/edgar/data/788784/000119312522200082/d841106dex101.htm)[5](http://www.sec.gov/Archives/edgar/data/788784/000119312522200082/d841106dex101.htm)[)](http://www.sec.gov/Archives/edgar/data/788784/000119312522200082/d841106dex101.htm)] | | | | | | [Key Executive Severance Plan of Public Service Enterprise Group Incorporated, amended effective [removed: Ju](http://www.sec.gov/Archives/edgar/data/788784/000119312522200082/d841106dex101.htm)[ly](http://www.sec.gov/Archives/edgar/data/788784/000119312522200082/d841106dex101.htm) [](http://www.sec.gov/Archives/edgar/data/788784/000119312522200082/d841106dex101.htm)[18](http://www.sec.gov/Archives/edgar/data/788784/000119312522200082/d841106dex101.htm)[, 202](http://www.sec.gov/Archives/edgar/data/788784/000119312522200082/d841106dex101.htm)[2](http://www.sec.gov/Archives/edgar/data/788784/000119312522200082/d841106dex101.htm) [](http://www.sec.gov/Archives/edgar/data/788784/000119312522200082/d841106dex101.htm) [(1](http://www.sec.gov/Archives/edgar/data/788784/000119312522200082/d841106dex101.htm)[3](http://www.sec.gov/Archives/edgar/data/788784/000119312522200082/d841106dex101.htm)[)](http://www.sec.gov/Archives/edgar/data/788784/000119312522200082/d841106dex101.htm)] [added: July 18, 2022](http://www.sec.gov/Archives/edgar/data/788784/000119312522200082/d841106dex101.htm) [(1](http://www.sec.gov/Archives/edgar/data/788784/000119312522200082/d841106dex101.htm)[2](http://www.sec.gov/Archives/edgar/data/788784/000119312522200082/d841106dex101.htm)[)](http://www.sec.gov/Archives/edgar/data/788784/000119312522200082/d841106dex101.htm)] | | |
| [removed: [10a(8)](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex101.htm)] [added: [10a(1](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex102.htm)[3](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex102.htm)[)](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex102.htm)] | | | | | | [removed: [Agree](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex101.htm)[ment wi](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex101.htm)[th] [added: [Agreement with] Ralph [removed: Izzo](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex101.htm) [dated] [added: A. LaRossa dated] April 18, [removed: 2022](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex101.htm) [(1](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex101.htm)[4](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex101.htm)[)](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex101.htm)] [added: 2022](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex102.htm)[(2](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex102.htm)[0](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex102.htm)[)](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex102.htm)] | | |
| [removed: [10a(9)](http://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a17.txt)] [added: [10a(](http://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a17.txt)[6](http://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a17.txt)[)](http://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a17.txt)] | | | | | | [Stock Plan for Outside Directors, as [removed: amended](http://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a17.txt)(15)] [added: amended](http://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a17.txt)(13)] | | |
| [removed: [10a(10)](http://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a20.txt)] [added: [10a(](http://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a20.txt)[7](http://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a20.txt)[)](http://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a20.txt)] | | | | | | [Compensation Plan for Outside [removed: Directors](http://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a20.txt)(16)] [added: Directors](http://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a20.txt)(14)] | | |
| [removed: [10a(11)](http://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm)] [added: [10a(](http://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm)[8](http://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm)[)](http://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm)] | | | | | | [2004 Long-Term Incentive Plan, amended and restated as of April [removed: 16,](http://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm) [](http://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm)[2013](http://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm)(17)] [added: 16, 2013](http://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm)(15)] | | |
| [removed: [10a(12)](http://www.sec.gov/Archives/edgar/data/81033/000093041309000939/c56702_ex10-1.htm)] [added: [10a(](http://www.sec.gov/Archives/edgar/data/81033/000093041309000939/c56702_ex10-1.htm)[9](http://www.sec.gov/Archives/edgar/data/81033/000093041309000939/c56702_ex10-1.htm))] | | | | | | [Form of Agreement for Advancement of Expenses with Outside [removed: Directors](http://www.sec.gov/Archives/edgar/data/81033/000093041309000939/c56702_ex10-1.htm)(18)] [added: Directors](http://www.sec.gov/Archives/edgar/data/81033/000093041309000939/c56702_ex10-1.htm)(16)] | | |
| [removed: [10a(13)](http://www.sec.gov/Archives/edgar/data/788784/000162828022027422/ex10equitydeferralplanamen.htm)] [added: [10a(21)](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex10a21-equitydeferralplan.htm)] | | | | | | [Equity Deferral Plan, amended [added: and restated] effective [removed: October 19, 2022](http://www.sec.gov/Archives/edgar/data/788784/000162828022027422/ex10equitydeferralplanamen.htm) [(](http://www.sec.gov/Archives/edgar/data/788784/000162828022027422/ex10equitydeferralplanamen.htm)[19](http://www.sec.gov/Archives/edgar/data/788784/000162828022027422/ex10equitydeferralplanamen.htm)[)](http://www.sec.gov/Archives/edgar/data/788784/000162828022027422/ex10equitydeferralplanamen.htm)] [added: November 20, 2023](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex10a21-equitydeferralplan.htm)] | | |
| [removed: [10a(14)](http://www.sec.gov/Archives/edgar/data/81033/000078878415000002/pseg-12312014xq4ex10a.htm)] [added: [10a(1](http://www.sec.gov/Archives/edgar/data/81033/000078878415000002/pseg-12312014xq4ex10a.htm)[0](http://www.sec.gov/Archives/edgar/data/81033/000078878415000002/pseg-12312014xq4ex10a.htm)[)](http://www.sec.gov/Archives/edgar/data/81033/000078878415000002/pseg-12312014xq4ex10a.htm)] | | | | | | [Agreement with Tamara L. Linde dated June 18, [removed: 2014](http://www.sec.gov/Archives/edgar/data/81033/000078878415000002/pseg-12312014xq4ex10a.htm)(20)] [added: 2014](http://www.sec.gov/Archives/edgar/data/81033/000078878415000002/pseg-12312014xq4ex10a.htm)(17)] | | |
| [removed: [10a(15)](http://www.sec.gov/Archives/edgar/data/81033/000078878415000011/pseg-9302015xq3ex10.htm)] [added: [10a(1](http://www.sec.gov/Archives/edgar/data/81033/000078878415000011/pseg-9302015xq3ex10.htm)[1](http://www.sec.gov/Archives/edgar/data/81033/000078878415000011/pseg-9302015xq3ex10.htm)[)](http://www.sec.gov/Archives/edgar/data/81033/000078878415000011/pseg-9302015xq3ex10.htm)] | | | | | | [Agreement with Daniel J. Cregg dated September 22, [removed: 2015](http://www.sec.gov/Archives/edgar/data/81033/000078878415000011/pseg-9302015xq3ex10.htm)(21)] [added: 2015](http://www.sec.gov/Archives/edgar/data/81033/000078878415000011/pseg-9302015xq3ex10.htm)(18)] | | |
| [removed: [10a(16)](http://www.sec.gov/Archives/edgar/data/81033/000078878418000004/ex10a20clawbackpractice.htm)] [added: [10a(1](http://www.sec.gov/Archives/edgar/data/81033/000078878418000004/ex10a20clawbackpractice.htm)[2](http://www.sec.gov/Archives/edgar/data/81033/000078878418000004/ex10a20clawbackpractice.htm)[)](http://www.sec.gov/Archives/edgar/data/81033/000078878418000004/ex10a20clawbackpractice.htm)] | | | | | | [Clawback Practice, effective February 20, [removed: 2018](http://www.sec.gov/Archives/edgar/data/81033/000078878418000004/ex10a20clawbackpractice.htm)(22)] [added: 2018](http://www.sec.gov/Archives/edgar/data/81033/000078878418000004/ex10a20clawbackpractice.htm)(19)] | | |
| [removed: [10a(17)](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex102.htm)] [added: [10a(1](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex102.htm)[3](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex102.htm)[)](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex102.htm)] | | | | | | [Agreement with Ralph A. [removed: LaRossa](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex102.htm) [dated Ap](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex102.htm)[ril] [added: LaRossa dated April] 18, [removed: 2022](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex102.htm)[(2](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex102.htm)[3](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex102.htm)[)](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex102.htm)] [added: 2022](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex102.htm)[(20)](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex102.htm)] | | |
| [removed: [10a(18)](http://www.sec.gov/Archives/edgar/data/788784/000119312521126797/d162501dex991.htm)] [added: [10a(1](http://www.sec.gov/Archives/edgar/data/788784/000119312521126797/d162501dex991.htm)[4](http://www.sec.gov/Archives/edgar/data/788784/000119312521126797/d162501dex991.htm)[)](http://www.sec.gov/Archives/edgar/data/788784/000119312521126797/d162501dex991.htm)] | | | | | | [2021 Long-Term Incentive Plan, effective April 20, [removed: 202](https://www.sec.gov/Archives/edgar/data/788784/000119312521126797/d162501dex991.htm)[1](https://www.sec.gov/Archives/edgar/data/788784/000119312521126797/d162501dex991.htm)(24)] [added: 2021](https://www.sec.gov/Archives/edgar/data/788784/000119312521126797/d162501dex991.htm)(21)] | | |
| [removed: [10a(19)](http://www.sec.gov/Archives/edgar/data/788784/000119312521129266/d162521dex46.htm)] [added: [10a(1](http://www.sec.gov/Archives/edgar/data/788784/000119312521129266/d162521dex46.htm)[5](http://www.sec.gov/Archives/edgar/data/788784/000119312521129266/d162521dex46.htm)[)](http://www.sec.gov/Archives/edgar/data/788784/000119312521129266/d162521dex46.htm)] | | | | | | [2021 Equity Compensation Plan for Outside Directors, effective April 20, [removed: 2021](http://www.sec.gov/Archives/edgar/data/788784/000119312521129266/d162521dex46.htm)[(](http://www.sec.gov/Archives/edgar/data/788784/000119312521129266/d162521dex46.htm)[2](http://www.sec.gov/Archives/edgar/data/788784/000119312521129266/d162521dex46.htm)[5](http://www.sec.gov/Archives/edgar/data/788784/000119312521129266/d162521dex46.htm)[)](http://www.sec.gov/Archives/edgar/data/788784/000119312521129266/d162521dex46.htm)[](http://www.sec.gov/Archives/edgar/data/788784/000119312521129266/d162521dex46.htm)] [added: 2021](http://www.sec.gov/Archives/edgar/data/788784/000119312521129266/d162521dex46.htm)[(2](http://www.sec.gov/Archives/edgar/data/788784/000119312521129266/d162521dex46.htm)[2](http://www.sec.gov/Archives/edgar/data/788784/000119312521129266/d162521dex46.htm)[)](http://www.sec.gov/Archives/edgar/data/788784/000119312521129266/d162521dex46.htm)] | | |
| [removed: [10a(20)](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex104hanemannagreement.htm)] [added: [10a(](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex104hanemannagreement.htm)[16](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex104hanemannagreement.htm)[)](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex104hanemannagreement.htm)] | | | | | | [Agreement with Kim C. Hanemann dated May 21, [removed: 2021](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex104hanemannagreement.htm)[(](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex104hanemannagreement.htm)[2](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex104hanemannagreement.htm)[6](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex104hanemannagreement.htm)[)](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex104hanemannagreement.htm)] [added: 2021](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex104hanemannagreement.htm)[(2](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex104hanemannagreement.htm)[3](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex104hanemannagreement.htm)[)](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex104hanemannagreement.htm)] | | |
| [removed: [10a(21)](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex10a21ericcarragreement.htm)] [added: [10a(24)](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex10a24-mcfeatersagreement.htm)] | | | | | | [Agreement with [removed: Eric Carr] [added: Charles V. McFeaters] dated [removed: July 15, 2019](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex10a21ericcarragreement.htm)] [added: April 18, 2023](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex10a24-mcfeatersagreement.htm)] | | |
| [removed: [21](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex21-12312022.htm)] [added: [21](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex21-12312023.htm)] | | | | | | [Subsidiaries of the [removed: Registrant](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex21-12312022.htm)] [added: Registrant](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex21-12312023.htm)] | | |
| [removed: [23](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex23-12312022.htm)] [added: [23](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex23-12312023.htm)] | | | | | | [Consent of Independent Registered Public Accounting [removed: Firm](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex23-12312022.htm)] [added: Firm](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex23-12312023.htm)] | | |
| [removed: [31](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex31-12312022.htm)] [added: [31](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex31-12312023.htm)] | | | | | | [Certification by [removed: Ralph](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex31-12312022.htm) [A.](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex31-12312022.htm) [](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex31-12312022.htm)[L](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex31-12312022.htm)[aRossa](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex31-12312022.htm)[,] [added: Ralph A. LaRossa,] pursuant to Rules 13a-14 and 15d-14 of the Securities Exchange Act of 1934 (1934 [removed: Act)](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex31-12312022.htm)] [added: Act)](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex31-12312023.htm)] | | |
| [removed: [31a](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex31a-12312022.htm)] [added: [31a](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex31a-12312023.htm)] | | | | | | [Certification by Daniel J. Cregg, pursuant to Rules 13a-14 and 15d-14 of the 1934 [removed: Act](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex31a-12312022.htm)] [added: Act](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex31a-12312023.htm)] | | |
| [removed: [32](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex32-12312022.htm)] [added: [32](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex32-12312023.htm)] | | | | | | [Certification by [removed: Ralph](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex32-12312022.htm) [A.](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex32-12312022.htm) [](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex32-12312022.htm)[LaRossa](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex32-12312022.htm)[,] [added: Ralph A. LaRossa,] pursuant to Section 1350 of Chapter 63 of Title 18 of the U.S. [removed: Code](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex32-12312022.htm)] [added: Code](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex32-12312023.htm)] | | |
| [removed: [32a](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex32a-12312022.htm)] [added: [32a](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex32a-12312023.htm)] | | | | | | [Certification by Daniel J. Cregg, pursuant to Section 1350 of Chapter 63 of Title 18 of the U.S. [removed: Code](https://www.sec.gov/Archives/edgar/data/788784/000162828023004411/ex32a-12312022.htm)] [added: Code](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex32a-12312023.htm)] | | |
| [3a(1)](http://www.sec.gov/Archives/edgar/data/81033/0000081033-94-000007.txt) | | | | | | [Restated Certificate of Incorporation of [removed: PSE&G](http://www.sec.gov/Archives/edgar/data/81033/0000081033-94-000007.txt)(27)] [added: PSE&G](http://www.sec.gov/Archives/edgar/data/81033/0000081033-94-000007.txt)(26)] | | |
| [3a(2)](http://www.sec.gov/Archives/edgar/data/81033/0000081033-94-000007.txt) | | | | | | [Certificate of Amendment of Certificate of Restated Certificate of Incorporation of PSE&G filed February 18, 1987 with the State of New Jersey adopting limitations of liability provisions in accordance with an amendment to New Jersey Business Corporation [removed: Act](http://www.sec.gov/Archives/edgar/data/81033/0000081033-94-000007.txt)(28)] [added: Act](http://www.sec.gov/Archives/edgar/data/81033/0000081033-94-000007.txt)(27)] | | |
| [3a(3)](http://www.sec.gov/Archives/edgar/data/81033/0000081033-94-000007.txt) | | | | | | [Certificate of Amendment of Restated Certificate of Incorporation of PSE&G filed June 17, 1992 with the State of New Jersey, establishing the 7.44% Cumulative Preferred Stock ($100 Par) as a series of Preferred [removed: Stock](http://www.sec.gov/Archives/edgar/data/81033/0000081033-94-000007.txt)(29)] [added: Stock](http://www.sec.gov/Archives/edgar/data/81033/0000081033-94-000007.txt)(28)] | | |
| [3a(4)](http://www.sec.gov/Archives/edgar/data/81033/0000081033-94-000007.txt) | | | | | | [Certificate of Amendment of Restated Certificate of Incorporation of PSE&G filed March 11, 1993 with the State of New Jersey, establishing the 5.97% Cumulative Preferred Stock ($100 Par) as a series of Preferred [removed: Stock](http://www.sec.gov/Archives/edgar/data/81033/0000081033-94-000007.txt)(30)] [added: Stock](http://www.sec.gov/Archives/edgar/data/81033/0000081033-94-000007.txt)(29)] | | |
| [3a(5)](http://www.sec.gov/Archives/edgar/data/81033/0000081033-94-000007.txt) | | | | | | [Certificate of Amendment of Restated Certificate of Incorporation of PSE&G filed January 27, 1994 with the State of New Jersey, establishing the 6.92% Cumulative Preferred Stock ($100 Par) and the 6.75% Cumulative Preferred Stock ($25 Par) as a series of Preferred [removed: Stock](http://www.sec.gov/Archives/edgar/data/81033/0000081033-94-000007.txt)(31)] [added: Stock](http://www.sec.gov/Archives/edgar/data/81033/0000081033-94-000007.txt)(30)] | | |
| [3b(1)](http://www.sec.gov/Archives/edgar/data/81033/000093041307004140/ex_3-3.txt) | | | | | | [By-Laws of PSE&G as in effect April 17, [removed: 2007](http://www.sec.gov/Archives/edgar/data/81033/000093041307004140/ex_3-3.txt)(32)] [added: 2007](http://www.sec.gov/Archives/edgar/data/81033/000093041307004140/ex_3-3.txt)(31)] | | |
| 4a(1) | | | | | | Indenture between PSE&G and Fidelity Union Trust Company (now, Wachovia Bank, National Association), as Trustee, dated August 1, [removed: 1924(33),] [added: 1924(32),] securing First and Refunding Mortgage Bond and Supplemental Indentures between PSE&G and U.S. Bank National Association, successor, as Trustee, supplemental to Exhibit 4a(1), dated as follows: | | |
| 4a(2) | | | | | | June 1, [removed: 1937(34)] [added: 1937(33)] | | |
| 4a(3) | | | | | | July 1, [removed: 1937(35)] [added: 1937(34)] | | |
| 4a(4) | | | | | | June 1, 1991 (No. [removed: 1)(36)] [added: 1)(35)] | | |
| [4a(5)](http://www.sec.gov/Archives/edgar/data/81033/000095011705000790/ex4a28.txt) | | | | | | [August 1, 2004 (No. [removed: 4)](http://www.sec.gov/Archives/edgar/data/81033/000095011705000790/ex4a28.txt)(37)] [added: 4)](http://www.sec.gov/Archives/edgar/data/81033/000095011705000790/ex4a28.txt)(36)] | | |
| [4a(6)](http://www.sec.gov/Archives/edgar/data/81033/000093041308001260/c52299_ex4a-28.htm) | | | | | | [April 1, [removed: 2007](http://www.sec.gov/Archives/edgar/data/81033/000093041308001260/c52299_ex4a-28.htm)(38)] [added: 2007](http://www.sec.gov/Archives/edgar/data/81033/000093041308001260/c52299_ex4a-28.htm)(37)] | | |
| [10a(17)](http://www.sec.gov/Archives/edgar/data/81033/000078878423000002/exh101_creggretentionaward.htm) | | | | | | [Retention](http://www.sec.gov/Archives/edgar/data/81033/000078878423000002/exh101_creggretentionaward.htm) [Award for Daniel J. Cregg dated April 17, 2023](http://www.sec.gov/Archives/edgar/data/81033/000078878423000002/exh101_creggretentionaward.htm)[(24](http://www.sec.gov/Archives/edgar/data/81033/000078878423000002/exh101_creggretentionaward.htm)[)](http://www.sec.gov/Archives/edgar/data/81033/000078878423000002/exh101_creggretentionaward.htm) | | |
| [10a(18)](http://www.sec.gov/Archives/edgar/data/81033/000078878423000007/exhibit1032021equitycompen.htm) | | | | | | [2021 Equity Compensation Plan for Outside Directors - Restricted Stock Unit Award Agreemen](http://www.sec.gov/Archives/edgar/data/81033/000078878423000007/exhibit1032021equitycompen.htm)[t](http://www.sec.gov/Archives/edgar/data/81033/000078878423000007/exhibit1032021equitycompen.htm)[(25)](http://www.sec.gov/Archives/edgar/data/81033/000078878423000007/exhibit1032021equitycompen.htm) | | |
| [10a(22)](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex10a22-2021ltippsuagreeme.htm) | | | | | | [2021 Long-Term Incentive Plan - Performance Share Units Award Agreement](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex10a22-2021ltippsuagreeme.htm) | | |
| [10a(23)](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex10a23-2021ltiprsuagreeme.htm) | | | | | | [2021 Long-Term Incentive Plan - Restricted Stock Unit Award Agreement](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex10a23-2021ltiprsuagreeme.htm) | | |
| [97](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex97-clawbackpractice.htm) | | | | | | [Clawback Practice for Recovery of Erroneously Awarded Compensation to Executive Officers](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex97-clawbackpractice.htm) | | |
| [10a(17)](http://www.sec.gov/Archives/edgar/data/81033/000078878423000002/exh101_creggretentionaward.htm) | | | | | | [Retention](http://www.sec.gov/Archives/edgar/data/81033/000078878423000002/exh101_creggretentionaward.htm) [Award for Daniel J. Cregg dated April 17, 2023](http://www.sec.gov/Archives/edgar/data/81033/000078878423000002/exh101_creggretentionaward.htm)[(24)](http://www.sec.gov/Archives/edgar/data/81033/000078878423000002/exh101_creggretentionaward.htm) | | |
| [10a(18)](http://www.sec.gov/Archives/edgar/data/81033/000078878423000007/exhibit1032021equitycompen.htm) | | | | | | [2021](http://www.sec.gov/Archives/edgar/data/81033/000078878423000007/exhibit1032021equitycompen.htm) [Equity Compensation Plan for Outside Directors - Restricted Stock Unit Award Agreement](http://www.sec.gov/Archives/edgar/data/81033/000078878423000007/exhibit1032021equitycompen.htm) [](http://www.sec.gov/Archives/edgar/data/81033/000078878423000007/exhibit1032021equitycompen.htm) [(](http://www.sec.gov/Archives/edgar/data/81033/000078878423000007/exhibit1032021equitycompen.htm)[2](http://www.sec.gov/Archives/edgar/data/81033/000078878423000007/exhibit1032021equitycompen.htm)[5)](http://www.sec.gov/Archives/edgar/data/81033/000078878423000007/exhibit1032021equitycompen.htm) | | |
| [10a(22)](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex10a22-2021ltippsuagreeme.htm) | | | | | | [2021 Long-Term Incentive Plan - Performance Share Units Award Agreement](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex10a22-2021ltippsuagreeme.htm) | | |
| [10a(23)](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex10a23-2021ltiprsuagreeme.htm) | | | | | | [2021 Long-Term Incentive Plan - Restricted Stock Unit Award Agreement](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex10a23-2021ltiprsuagreeme.htm) | | |
| [97](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex97-clawbackpractice.htm) | | | | | | [Clawback Practice for Recovery of Erroneously Awarded Compensation to Executive Officers](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex97-clawbackpractice.htm) | | |
| | | | 2023 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| | | | 2023 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| /s/ RICARDO G. PÉREZ | | | | | | Director | | | | | | February 26, 2024 | | |
| Ricardo G. Pérez | | | | | | | | | | | | | | |
| /s/ KENNETH Y. TANJI | | | | | | Director | | | | | | February 26, 2024 | | |
| Kenneth Y. Tanji | | | | | | | | | | | | | | |
| /s/ WILLIE A. DEESE | | | | | | Director | | | | | | February 26, 2024 | | |
| Willie A. Deese | | | | | | | | | | | | | | |
| /s/ BARRY H. OSTROWSKY | | | | | | Director | | | | | | February 26, 2024 | | |
| Barry H. Ostrowsky | | | | | | | | | | | | | | |
| [10a(20)](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex104hanemannagreement.htm) | | | | | | [Agreement with Kim C. Hanemann dated May 21, 2021](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex104hanemannagreement.htm)[(](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex104hanemannagreement.htm)[2](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex104hanemannagreement.htm)[6](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex104hanemannagreement.htm)[)](http://www.sec.gov/Archives/edgar/data/788784/000078878421000034/ex104hanemannagreement.htm) | | |
| [10a(21)](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex102.htm) | | | | | | [Agreement with Ralph A. LaRossa dated April 18, 2022](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex102.htm)[(2](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex102.htm)[3](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex102.htm)[)](http://www.sec.gov/Archives/edgar/data/788784/000119312522108775/d356021dex102.htm) | | |
(51)Filed as Exhibit 10.2 with Current Report on Form 8-K, File No. 001-00973, on February 19, 2009 and incorporated herein by this reference.
| | | | 2020 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
(D)Includes $8 million due to the adoption of ASU 2016-13.
| | | | 2020 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
(D)Includes $8 million due to the adoption of ASU 2016-13.
| /s/ DAVID LILLEY | | | | | | Director | | | | | | February 21, 2023 | | |
| David Lilley | | | | | | | | | | | | | | |
| /s/ ALFRED W. ZOLLAR | | | | | | Director | | | | | | February 21, 2023 | | |
| Alfred W. Zollar | | | | | | | | | | | | | | |
| /s/ DAVID LILLEY | | | | | | Director | | | | | | February 21, 2023 | | |
| David Lilley | | | | | | | | | | | | | | |
| /s/ ALFRED W. ZOLLAR | | | | | | Director | | | | | | February 21, 2023 | | |
| Alfred W. Zollar | | | | | | | | | | | | | | |
An excerpt. Shown here: 40 of 134 rewritten, all 20 added and all 15 removed. The counts are complete. For every sentence, read Item 15. EXHIBITS, FINANCIAL STATEMENT SCHEDULES in the FY2023 filing and the FY2022 filing.
Page headers and footers: 7 lines differ, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]
[Table of [removed: Contents](#i7aff0ae0d6a44232bab2ed60782f3ed2_7)][added: Contents](#i48f6bb8a75fb4f4aac48c282f86546fa_7)]